Remaing Buildings Quotation

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

QUOTE STATE (CO)

Bid Due Date Project

5/10/2020 CYS 07 Data Center


5/10/2020 UC Boulder Calrson Classooms Reno
6/10/2020 Allison Village
7/10/2020 Ridgegate Apartments
Foster Dual Language PK-8 Additions and
12/10/2020
Renovations
12/10/2020 OCC Surgery Center at Inverness

NOTE: This does not include embed plate/angle, Seismic Moment, Seismic design of stair, wall rail
steel deck, foundation, stair and railing, Any type of Liquidated damages due delay or schedule & b
Connection Design Price PE stamping Price for
Project Location Misc Design Price in $
in $ Connection Design in $

Cheyenne (CO)
Boulder (CO) 0.00 0.00
Arvada (CO) 0.00 0.00
Lone Tree (CO) 300.00 1250.00 300.00
Arvada (CO) 600.00 2000.00 250.00

Englewood (CO) 500.00 1250.00 250.00

smic Moment, Seismic design of stair, wall railing bracket, cable rail, glass rail, wire mesh infill, joist connect
Liquidated damages due delay or schedule & back charge of any kind is not part of this contract at all.    Will
PE stamping Price for Total Price in
Remarks
Misc Design in $ $

No drawings
0.00 No Scope
0.00 No Scope
1000.00 2850.00
1000.00 3850.00
1000.00 3000.00

infill, joist connection, guide rail, cap/base plate,


ontract at all.    Will not accept any back charge at all due any kind of delay at all.

You might also like