MASHRIQ ENGINEERING CONSTRUCTION COMPANY

(USAID) Afghanistan: Gardez-Khost Road Project (Section 2)


From km: (27+000 to 30+000),(36+000 to 50+000)& (57+000 to 65+000)

Design Reinforcement Schedule for Box Culverts(C-124a)@42+640


Culvert No. C-124a Location: (42+640) RCBC CULVERT
Total 
Bar Bar  Bar Ø  Spacing Bars No. of Cut Total Wt/M Total Wt
Sr. No Bar Position no. of  Remarks
Shape Code mm C/C mm Sets Bars Length  m Length  m Kg,s Kg
bar
1 BOTTOM SLAB REINFORCEMENT SCHEDULE

0.20

0.20
1) Bottom slab Short/Transverse Reinforcement (Bottom) 3.000 A1 12 200 1 61 61 3.40 207.400 0.888 184.171

0.20

0.20
2) Bottom slab Short/Transverse Reinforcement (Top) 3.000 A2 16 250 1 49 49 3.40 166.600 1.579 263.006

0.20
3) Bottom slab Longitudinal Reinforcement (Bottom) 6.36 A3 12 250 1 13 13 6.56 85.254 0.888 75.706

0.20
4) Bottom slab Longitudinal Reinforcement (Bottom) 6.36 A3a 12 250 1 13 13 6.56 85.254 0.888 75.706 Over Laped

0.20
5) Bottom slab Longitudinal Reinforcement (Top) 11.50 A3b 12 250 1 13 13 11.70 152.100 0.888 135.065

0.20
6) Bottom slab Longitudinal Reinforcement (Top) 1.22 A3c 12 250 1 13 13 1.42 18.395 0.888 16.335 Over Laped

7) Chamfer reinforcement/bar 0.18 0.600 0.18 A4 12 250 2 49 98 0.96 94.080 0.888 83.543

2 WALL REINFORCEMENT SCHEDULE 0.20

0.70
1) Wall Vertical Reinforcements(Outer Bar) 2.425 A5 12 150 2 81 162 3.39 548.370 0.888 486.953
0.06
0.20

0.20
2) Wall Vertical Reinforcements(Inner Bar) 2.375 A5a 12 150 2 81 162 2.78 449.550 0.888 399.200
0.20

3) Wall Horizontal Reinforcements(Outer Bar) 11.5 A6 12 250 2 9 18 11.70 210.600 0.888 187.013

0.20
4) Wall Horizontal Reinforcements(Outer bar) 1.215 A6a 12 250 2 9 18 1.42 25.470 0.888 22.617 Over Laped
0.20

5) Wall Horizontal Reinforcements(Inner bar) 11.5 A6b 12 250 2 9 18 11.70 210.600 0.888 187.013
0.20

6) Wall Horizontal Reinforcements(Inner bar) 1.215 A6c 12 250 2 9 18 1.42 25.470 0.888 22.617 Over Laped

3 TOP SLAB REINFORCEMENT SCHEDULE


0.20

0.20

1) Top slab Short/Transverse Reinforcement (Top) 2.400 A7 12 150 1 81 81 2.80 226.800 0.888 201.398
0.20

0.20

2) Top slab Short/Transverse Reinforcement (Bottom) 2.400 A8 16 200 1 61 61 2.80 170.800 1.579 269.636
0.20

3) Top slab Longitudinal Reinforcement (Top) 11.500 A9 12 250 1 11 11 11.70 128.700 0.888 114.286
0.20

4) Top slab Longitudinal Reinforcement (Top) 1.22 A9a 12 250 1 11 11 1.42 15.565 0.888 13.822 Over Laped
0.20

5) Top slab Longitudinal Reinforcement (Bottom) 6.36 A10 12 150 1 17 17 6.56 111.486 0.888 99.000
0.20

6) Top slab Longitudinal Reinforcement (Bottom) 6.36 A10a 12 150 1 17 17 6.56 111.486 0.888 99.000 Over Laped

7) Chamfer Bars 0.18 0.600 0.18 A4 12 250 2 49 98 0.96 94.080 0.888 83.543

4 HEAD WALL REINFORCEMENT SCHEDULE


0.375

0.375

1)U Shape Bar/Reinforcements(U/S & D/S) 0.1 A25 12 250 2 11 22 0.85 18.700 0.888 16.606

2)Longitudinal Reinforcements(U/S & D/S) 2.400 A26 12 2 2 4 2.40 9.600 0.888 8.525

SUB TOTAL QUANTITY BOQ ITEM 3.045 Tons