1. An observation was made of expired work permits still inside boxes in the MS block area that need to be returned for archiving.
2. Empty and full HCL cylinders were found mixed in the MS block area and proper identification is required.
3. An improper homemade flange was used during acidizing operations in the MS block area, which may not withstand the 40 bar service pressure of HCL.
1. An observation was made of expired work permits still inside boxes in the MS block area that need to be returned for archiving.
2. Empty and full HCL cylinders were found mixed in the MS block area and proper identification is required.
3. An improper homemade flange was used during acidizing operations in the MS block area, which may not withstand the 40 bar service pressure of HCL.
1. An observation was made of expired work permits still inside boxes in the MS block area that need to be returned for archiving.
2. Empty and full HCL cylinders were found mixed in the MS block area and proper identification is required.
3. An improper homemade flange was used during acidizing operations in the MS block area, which may not withstand the 40 bar service pressure of HCL.
Observation Area Subcontractor Corrective Progress
action Expired PTW still MS block JCC All PTW shall Open inside box sinc 510-C-002 return for more than 4 month archive Empty & full HCL MS block CSU Identification Open cylinder are mixed 510 is required Scaffolding work RFCC JCC PTW shall be need validation for brough to night work HSE dep for validation Improper support RFCC JCC Pipe shall be Open with wood for pipe 530-R-002 reinforced by bottom chain block Empty HCL MS block CSU All cylinder Open cylinder layed down shall be up and on the floor which secured with not comply with chain procdure During the support MS block DC2 A PTW is Closed installation grating 520 mandatory for has been removed grating without PTW removal Due to vibration fire MS block CPECC To be checked Open proofing was 520-E-003 by cpecc damaged Empty HCL MS block CSU All cylinder Open cylinder not secured 510 shall be could fall on attached with workers chain Abnormal vibration MS Block CSU To be checked Open of the structure and 510-TG-007 by lighting support to 510-D-004 commissioning team Valve closed od MS Block CSU During Open Safety shower & 510 acidizing eye wash operation safety shower shall be open permanently Homemade flange MS block CSU Proper flange Open was used during 510 must be used acidizing operation which may not resist to the service pressure 40bar HCL Forklift windshild MS block JCC Reparation is Open broken was 500-C-002 required operating in MS block Unsafe scaffolding MS block JCC Modification Open platform used for 520-R-001 is required insulation work Heat generated from MS block JCC Adequate ppe Open reactors can easly 520-R-001 is required make serious harm to workers (500C) Automatic valve has MS block DC2 All activities On going been installed 500-D-007 shall be without any PTW covered with suitable PTW
Over flow of the MS block CSU To be check Open
valve pit (see attached pict ) Missing of P&D MS Block DC2 PTW shall be Open drawing in PTW & 510-P-009 B complete and JSA (repair pump) clear without any detail Inadequate PPE MS Block JCC Informed Open while working on 500-E- supervisor to insulation 1A/B/C/D/E supply exchanger adequate PPE but no feedback Some PTW are not MS Block CSU&DC2 All necessary Open complete ( missing document shall JSA,MS& drwing ) be attached CSU team oprator MS Block CSU Verbal Closed are using mobile 520-k- warning was phone inside units 002A/B given to the operator Hot steam has been MS Block CSU Warning Closed generated from the 500 notification drain point of vessel has been done to the workers beside SRR2 UPS room RFCC CSU Door shall be Closed has been left door SRR2 closed to limit open the access for electrical panels Some expired PTW MS block CSU All exoired Open are left in the MS PTW shall be block meeting room returned back for archive Steam line pipe cap MS Block CSU Cap is ongoing On going released due to 510 Pipe to be repaired pressure increase rack Inorder to repair the MS Block JCC Ladder need to On going released cap 510 Pipe be changed ,scaffolding rack structure has been erected with a short ladder Natural gas in ,using RFCC JCC Ordred to Closed a man lift without provide bronze Bronze tools & tools and proper barricade in install the bottom barication in the bottom Imporper storage of 510 CSU Signage & On going DMDS which is barricade is dangerous required substances on site Scaff tag is missing RFCC JCC Inspection is On going on the scaffolding required structure CSU team are MS Block CSU Smoking is Open smoking inside prohibited in container behinde MS Block SS23 PTW for MS Block JCC Immediately Closed refrigeration 520-M-004 send for PTW package has been Office to used without register registration Improper storage of MS Block CSU Signage and Open corrsive substance 505-M02-TK barricade is drum beside 01 required phosfate tank Presence of woden MS Blcok JCC All wood shall Open planks in the 520-D-003 be removed HC+H2 rich gas storage drum Acytilene and MS Block DC2 Immediately On going oxygene gas ordred to put cylinder has been them up and trasported layed secure with down on the back of wire pickup truck Small leakage of oil MS block CSU Report to cSU On going from the pump 520-P-001 B team Chain block used MS Block DC2 To be changed Open with broken safety leash in the hook Missing of grating ETP CPECC Cover is Open cover of the V-dich 840-TK-002 required drain Missing lock-out for MS block CSU LOTO to be Open the pump insulation 500-P-005A implemented valve Some steam heat 520-F-1234 CSU To be checked Open tracing tube are bending Many hot steam All MS CSU Heat tracing Open heat tracing tube are block pipe shall be not covered which protected could lead to skin burn in case of cutaneous contact ESD buttons need All MS CSU To be reviwed Open cover caps for block protection Improper indication SRU CSU LI shall be Open in the LI of 570-TK- 570-TK- calibrated by 001A that showing 001A instrument more than 100% team sour water level (see pict 01 ) Manhole of the SRU DC2 Manhole to be Open Tank was left open 570-TK- closed 001A Improper disposal MS Block CSU Safety signs as Open of corrosion 500-M-002 well as proper inhibitor drum next barricading to the corrosion must be in inhibitor skid place Unsafe scaffolding MS Block CSU & JCC Modification Open platform ( ladder 520-M-004 is required not fixed – incomplete working platform) Waste water ETP CSU 1. Fence is Open dropped in Evap Pound required since evaporation pound 2. Life buoy 20/10/201 mixed with naphtha to be 9 could lead to fire in provided case of any source 3. Warning of ignition sign shall be installed
Non cleared muster MS Block CPECC Muster point Open
point in MS block shall be area cleared before unit start-up Due to a MS Block CSU Modification On going manufacture 520-E-008A is required Problem, exchanger cannot be assembled after cleaning & inspection. therefore it remain hanged Due to an increase MS Block CSU Owner Closed of the pressure 18.2 520-C-001 firefighting Bar in the top of used lance column 520-C- monitor to 001,the tubing make a screen connection of the protector from manometer released any source of and big leak of heating naphtha start about Pressure 20min nonstop on dropped and the pumps ,drum the valve has and air cooler been closed Failure on manually the PSV which used to release at 17 bar
During our routine MS Block CSU CSU team was Closed
inspection on site 520-K-002 informed in we notice that there the SRR3 to was leak of H2S & check if there H2 in the is a leak compressor area 520-K-002 as per gas detector H2S:7PPm LEL:13 % Cleaning of ETP CSU Ordred to Closed emerged pump filter Drain pit provide lather without proper PPE coverall and mask Unsafe parking of MS block All subcon Proper parking On going cars which create an area to be obstacle for disginated firefignting truck in cas of intervention on NHT unit Emergency PTW 950 Unit CSU Only Closed for H2 bullet fill up authorized was appropved by person imoper person on HSE authority case ( see pict 01 -02 ) Workers are over MS Block CSU Speed limit Open speeding especially /JCC/CPECC/Sonatrach shall be light vehicles while respected driving on site Opening of close ETP JCC Immediately Closed drain pit without ordered to protection provide hard barricade around Improper storage of MS Block CSU Proper storage Open dangerous substance 520-M-002 & signage is DMDS required Waste water ETP CSU 4. Fence is Open dropped in Evap Pound required since evaporation pound 5. Life buoy 20/10/201 mixed with naphtha to be 9 could lead to fire in provided case of any source 6. Warning of ignition sign shall be installed
A Truck was MS Block DC2 Immediatey Closed
dropped in ditch East road help to take with key inside as out of the dich the pictures shows and inform ,fortunately it DC2 doesn’t caused any Supervisor harm or damage to electrical poles Unsafe scaffolding MS Block CSU Guardrail is Open platform without 520-R-001 required guardrail ( see pict bottom 01 ) Wooden planks are MS Block JCC All wooden Open still in use on planks shall be scaffolding structure replaced with prior NHT & CCR steel planks Startup Non cleared muster MS Block CPECC Muster point Open point in MS block shall be area cleared before unit start-up Water flushing SRU DC2 Barrication & Closed without proper signed was barication and provided signage Improper storage of MS Block JCC Proper & Closed Oxygen cylinder 520 secured storage is required Improper walkway MS Block JCC Walkway shall Closed for welding anchor 520-R-004 be secured by bolt plate not wire secured Furnace manhole MS Block JCC Manhole shall Closed was remained open 520-F-005 be closed since 3 day Spill of SRU Main CSU Remediation closed contaminated water Road of spill is mixed with naphtha required due to transportation from ETP by Cargo truck Reactors structure MS Block JCC All wooden Closed full of wooden 520-SC-01 planks shall be planks removed Grating tied with MS Block JCC Clips are Open steel wire which 520-SC -01 required to fix since might lead to Top side the grating 07/12/201 tripping hazard (see 9 pict 01 ) Homemade tools MS Block JCC All homemade Closed still in use by JCC 520-R-004- tools shall be 003-002 removed from site Most MS Block CSU JSA/RA are Open Commissioning required PTW for without JSA/RA Waste water ETP CSU 7. Fence is Open dropped in Evap Pound required since evaporation pound 8. Life buoy 20/10/201 mixed with naphtha to be 9 could lead to fire in provided case of any source 9. Warning of ignition sign shall be installed
Tripping hazard due MS Block JCC Material Closed
to poor arrangement 520-R- arrangement of scaffolding 1,2,3,4 shall be done material on the reactors structure Tripping hazard due MS Block JCC Material Closed to poor arrangement 520-R- arrangement internal material 1,2,3,4 shall be done removed from the reactors Reactors inspection MS Block JCC Confined Closed has been carried out 520-R- space without in/out log 1;2;3;4 procedure sheet shall be implemented 10. 11. More scaffold with MS block JCC All woden Open wooden planks in 520-sc-01 planks shall be CCR reactors 520-SC-01- removed structure 02 Scaffolding MS Block JCC Inspection and Open structure not 520-R-004 scaff tag is inspected required Furnace inspection MS Block JCC Immediatelly Closed has been carried out 520-F- called for without watchman 1;2;3;4 watchman and and in/out log sheet provide log sheet Wooden planks are MS Block JCC All wooden Open still in use at ISOM 510-C-001 planks must be since unit removed 28/11/201 9 Non certified SCBA MS Block CSU & Sonatrach Certified Pending apparatus used for 500 SCBA are H2S sample required with connection without Algerian Gas Cylinder stamp Road traffic : All site CSU – CPECC – JCC – Speed limit Pending Workers are over Sonatrach shall be speeding while followed driving on site Scaffolding wooden MS Block JCC Shall be Pending planks kept in CCR 520 east side removed after dismantling immediately Wooden planks are MS Block JCC All wooden Open still in use at ISOM 510-C-001 planks must be since unit removed 28/11/201 9 Lack of wind sock MS Block CPECC Wind sock to Closed be provided Unsafe mobile RFCC JCC Guardrails to Open scaffold without Main be installed guardrails (pict 1 ) Piperack Lack of access to RFCC JCC Access shall Open the 3rd platform be provided ( pict 2) Wooden planks are MS Block JCC All wooden Closed still in use at NHT 500-E- planks must be unit during strat-up 001A/B/C/D/ removed E Lack of wind sock Green field CPECC Wind sock to Open in all green field be provided Wooden planks are MS Block JCC All wooden Open still in use at ISOM 510-C-001 planks must be unit removed Workers on the roof Ware house CPECC Life line shall Open without any fall be provided on protection system the roofing (see attached pict ) work Before NHT start- MS Block CPECC Muster point Open up, Muster point in to be cleared not yet cleared Workers were using MS Block DC2 All dangerous Closed improper platform PR-01 platform shall to repair the air be removed cooler (see attached pict ) Drilling hole on MS Block JCC Immediately Closed package grouting of 520-F- stopped them the furnace which 1,2,3,4 and suspend feeding the dry out the activity with fuel gas with drilling machine During sulfiding MS Block CSU MSDS is Open operation ,lack of required MSDS of DMDS Wooden planks are MS Block JCC All wooden Open still in use at NHT 500-E- planks must be unit during strat-up 001A/B/C/D/ removed E Isulation waste left MS Block JCC All insulation Open under 500 500-E- waste to be exchangers 001A/B/C/D/ removed E Scaffolding MS Block JCC Scaffold to be On going structure was dismantle and bended due to stress re-erected with loading catalyst drum ( see attached picture ) Lack of muster MS Block CPECC Muster point is Open point whether the required units start-up Lack of barrication MS Block CSU Ordred to Closed while hot steam make warning water flow tape around Improper storage of MS Block CSU Proper storage Open thiner (diluent) SRR3 with signage is nearby the SRR3 required entrance After grating MS Block All subcontractor Signage has Closed removal for PR 001 been provided modification.worker and watchman s cross the at workplace barricaded area Cigarette butt MS Block CSU/DC2 & JCC Smoking is On Going thrown on the 520-K-001 prohibited on grating platform site Damaged fire MS block JCC Fire Open extinguisher used 520-M-004 extinguisher to with the electrical be changed generator Lack of sole plate MS Block JCC sole plate is Open under scaffolding required structure Poor material MS Block JCC Material Open arrangement which arrangement is blocking the access required inorder to clear the access Grating clips not MS Block JCC Clips to be Open fixed fixed Naphtha Filter has MS Block CSU HSE Dep shall Closed been cleaned and 500-D-001 be informed gasket was changed for any urgent in 500-D-001 intervention without any PTW During dismantling D Area JCC Life line is Closed of JCC shelters ,lack required of life line while working on the roof Improper cable MS Block CSU Proper Closed derivation of extra- 500-F- plugging is long lighter using 002/003 required tape Poor arrangement of MS Block JCC Immediately Closed scaffolding material 520 ordered to material which lead arrange to potential tripping scaffolding hazard material Confined space : MS Block JCC &CPECC Closed successful cleaning 520-D-003 & inspection of the internal vessel 520- D-003 A/B with support of CPECC team Improper Main road JCC Immediately Closed transportation of stopped and scaffolding tubes asked to secure with rope Poor arrangement of MS Block JCC Material Closed scaffolding material 510-D-010 arrangement on the platform A/B has been done which block the access Poor housekeeping Ms Block JCC Housekeeping Open in the east side is required since 26/10/201 9
Non respect of MS Block JCC Immediately Closed
confined space 520-F- get theme out precaution (lack of 1,2,3,4 until they take watchman,poor corrective lighting inside,no action logsheet ) Nearmiss has been MS Block JCC Immediately Ongoing occured this GE ordred to add a afternoon while a compressor toe board welder was working on a scaffolding platform without toe board,then 1.5 inch pipe dropped down Scaffolding Ms Block JCC Toe board is Open platform without toe GE required board compressor Missing transom Ms Block Modification is required Toe board is Open and ledger on GE required scaffolding structure compressor Homemade tools are MS Block JCC & CSU All homemade Open still used on site tools shall be removed from site Wooden planks left MS Block JCC All wooden Open on pipe lines & steel planks shall be structures could removed easily burn in favor condition during while naphtha will be injected 1. Scaffolding MS Block JCC 1. Scaffold Open platform has been 510 ISOM shall be moved with crane dismantled from area to other and area with is not erected complying to 2. Scaffold scaffolding shall be standard inspected 2. All component tubes and couplers lose its resistivity
Acetylene & SRU JCC Flash back Open
Oxygen gas arrestor is cylinder used required without flashback arrestor
Loose material left MS Block CSU/JCC All loose Open
on the top of 500-F-001 material shall furnace 500-F-001 be stored properly Improper disposal MS Block CSU/JCC Box is Open of bolts during 500-F-001 required opening of furnace conviction section manhole susceptible to fall Improper storage of MS Block JCC Gas cylinder Open argon gas cylinder 520-SC-0101 shall be with steel wire secured with ( picture 01/02) chain and proper storage Impoper MS Block JCC Immediately Closed arrangement of Pipe Rack ordred to scaffolding tube arrange tube during lifting and porivde operation without proper tagline adequate tagline (pict 03) Poor management MS Block JCC Management Open of welding cable 520-sc-0101 cable is could damage with required grating platform (Pict 04) Inaccessible RFCC JCC Obstacle to be Open scaffolding access 530-PR-01 removed (blocked ) Hot pipe surface MS Block JCC & CMS Signage & Open Due to steam 520-PR-01 barrication is blowing without any required barrication of signage Due to lube oil MS Block Commissioning team To be cleaned Open flushing ,oil was GE ASAP flowed down on the Compressor grating platform 520-K-001 which become slippy Blind was removed MS Block Commissioning team Reported to Closed after leak test ,hot 505-D-007 Commissionin water was flowed g night shift team Access blocked by MS Block JCC Access to be Open scaffolding material GE cleared on the grating Compressor platform 520 Improper MS Block JCC Modification Open scaffolding platform GE is required Compressor 520 Forklift was MS Block JCC Immediately Closed operated by 520-D-006 ordred to stop incompetent person During reactor MS Block DC2 Immediately Closed cleaning ,water 520-R-002 ordred to stop falling on electrical and cover panel Imporper MS Block JCC Must be On going scaffolding platform 520-D- removed from still used on high 007A/B site elevation Oil spill from the air MS Block Commissioning CPECC Shall be Open compressor 510 covered with sand Apparent rebar on MS block Segregation Open the ground can waste is since JCC (tripping hazard ) required 02/10/201 9 Scaffolidng material MS block Scaffolding left on the GE material need JCC Open compressor to be removed platform PVC pipe appeared MS Block Shall be cut nead furnace 500-F- JCC Open 001 Observation Area Subcontractor Corrective Progress action Successful MS block Mission Absorber loading completed of the 5th vessel consecutive deep JCC & CPECC On going with support of CPECC rescue team Hot tubing can MS Block Commissioning Signage is Open burn at cutanous required contact Cigarette butt MS block Smoking is thrown on the GE prohibited on compressor site JCC & CPECC platform wich Open commissionng may lead to fire while gas has been introduced During the MS Block Only authorized furnace 500-F- 500-F-001 person are allow 001 Many people inside with are not CPECC & involved in the On Going Sonatrach operation across the barricaded area either CPECC or Owner Workers are still MS block Cell phone is using mobile prohibited phone on site henceforth JCC Open even gas has been introduced in MS block Successful MS block Mission Absorber loading completed of the 4th vessel consecutive more JCC & CPECC Closed than 9 meter deep with support of CPECC rescue team OBSERVATION RELATED TO THE COMMISSIONING ACTIVITY Observation Area Subcontractor Corrective Progress action Hydrogen 950 Unit Linde gas Operation Ongoing cylinder truck suspended until arrived to site this they change a afternoon then new valve they start filling up the 950 unit vessels, unfortunately, there was a leak precisely in the connection valve, so the operation has been suspended.
Wooden planks MS Block JCC All wooden Open
left on pipe lines planks shall be & steel structures removed could easily burn in favor condition during while naphtha will be injected Metalic Hand MS Block JCC & CSU All hand tools Open tools are still in shall be changed use during the by bronze tools commissioning & startup No protection for MS Block CSU Warning tap is Open steam blowing 520-K-001 resuired operation discharging side
Permanent hazard ETP CPECC Fence and life Open
next to the buoy are evaporation required pound while workers walking on the edge (missing fence & life buoy ) Successful inert MS block Mission balls loading of completed the reactor 510- R-001 more than JCC & CPECC Closed 24 meter deep with support of CPECC rescue team Two Successful MS Block CPECC / Closed Loading & 510-R-002 inspection 510-D-005 operation inside 510-R-02 25M deep & 510-D- 005 using rope access devices with support of CPECC rescue team Unsecured steel MS Block CMU Whipe check is Open wire during air GE required blowing instead compressor of Whipe check During furnace MS block JCC Watchman with Closed inspection,no 500-F-01 log sheet has watchman and no been provided log sheet in/out (Pict 05)
Fire hose has MS Block JCC *Sprayer to be Open
been used to 520 repared spray the soil by *Never use fire JCC worker wich hose to avoid damaged the firefighting sprayer part pressure decrease During the MS Block Only authorized furnace 500-F- 500-F-001 person are allow 001 Many people inside with are not CPECC & involved in the On Going Sonatrach operation across the barricaded area either CPECC or Owner
Cigarette butt MS block Smoking is
thrown on the GE prohibited on compressor site JCC & CPECC platform wich Open commissionng may lead to fire while gas has been introduced