SIDDHIRGANJ 335MW CCPP PROJECT

INSPECTION AND TEST REPORT

Communication System Installation


Inspection Date/Time Document No.
Work ITP No.
Location Drawing No.

Result Remark
No. Check Items
Acc. Rej. N/A

1 Check Identification of equipment

2 Check using correct type of equipment

3 Check location of equipment according to drawing

4 Check support installation of equipment

5 Check physical damage of equipment

6 Check wire connection for equipment

7 Check touch up condition (if required)

8 Check earthing connection to equipment / pole

Comment

Name(Signature) / Date
Samsung Samsung
Sub-contractor EGCB/OE
Construction QA/QC