Table - Project Cost Estimate Materials Unit Quantity Unit Price Cost

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

CHAPTER IV

PRESENTATION ANALYSIS AND INTERPRETATION OF DATA

This chapter presents the findings, analysis and interpretation of data through the use of tables and
graphical presentations. The content of the survey conducted are related to the problem discussed in
Chapter 1. Tabulation of data and information gathered are discussed for the analysis, computation, and
interpretation of design for the proposed 2-storey quarantine facility.

1 Design of 2-Storey Quarantine Facility appropriate in Barangay Banay-Banay, Cabuyao, Laguna.

The following figures below are the architectural plans and design that used in survey questionnaire as a
visual of the respondents in the proposed 2-Storey Quarantine Facility in Barangay Banay-Banay,
Cabuyao, Laguna.

(Place all your plans, specifications and design here.)

Perspective, floor plans, elevation plans, foundation plan, roof framing plan, electrical plans, plumbing,
water supply, septic tank, column and beam plans, slab design, footing, details of windows and doors,
stairs, etc.

2. Most economical estimated cost of the proposed project.

The table ___ shows the estimated materials and labor cost of this project.

Table _____
Project Cost Estimate
Materials Unit Quantity Unit Price Cost

Total Cost
3. Extent of the proposed project as perceived by the respondents in terms of LEED criteria.

Table___ below shows the mean of the LEED criteria vis-avis Project Design of 2-Storey Quarantine
Facility in Barangay Banay-Banay, Cabuyao, Laguna.

Table _____

Mean of the LEED Criteria vis-a-vis Project Design

MEAN TOTAL VERBAL


PARAMETERS
Residents CE Bry. Officials Students MEAN INTERPRETATION
1. Location and
4.00
Transportation 4.15 2.63 5.35 4.03 VG
2. Sustainable Sites 4.30 4.60 2.38 5.29 4.14 E
3. Water Efficiency 4.00 4.60 2.13 5.47 4.05 E
4. Energy and Atmosphere 4.05 4.20 2.38 5.18 3.95 E
5. Materials and Resources 4.65 4.60 2.50 5.18 4.23 VG
6. Indoor Environmental
4.00
Quality 4.40 2.50 5.06 3.99 VG
7. Innovation 4.05 4.40 2.25 5.29 4.00 E
8. Regional Priority 4.15 4.60 2.50 5.47 4.18 E
MEAN TOTAL 4.07 E

The table above shows, that the location and transportation accessibility in the area of the proposed project is very
good with a mean of ___, chuchuchuchuchuc chuchuc chucchchuchuchuchuchuchucu

Below is the ANOVA using One-Way-ANOVA of the extent of evaluation of the project design using the LEED
criteria.

(Apply here what you have learned in statistics or if you have forgotten, refer to statisticians)

Table_____
One-Way-ANOVA of the Extent of Project Design Evaluation Using LEED Criteria

__________________________________ (Discuss your interpretation here)


_____________________________________________________________________________________
_________________________________________________________________________________
4. Expected benefits of the proposed project to the community.

You might also like