Appendix C: Material Cost Estimate For Water Resources Context
Appendix C: Material Cost Estimate For Water Resources Context
Constructability Constraint
Duration Estimates of Branched System
Description of Length (m) Width (m) Depth (m) Parameter (man.
Man
Pavement Demol 17045.52 0.25 0.1 4 hours
1704.55
Excavation 17045.52 0.25 0.35 0.5 745.74
Backfill 17045.52 0.25 0.35 2 2982.97
Surface Restora17045.52 0.25 0.1 2 852.28
Pipe Laying 17045.52 1 17045.52
Total Duration (days)
E.1 Trade-off 1: Branch Distribution System E.2 Trade-off 2: Loop Distribution System
H.1 Trade-off 1: Ground-level Water Storage Tank H.2 Trade-off 2: Elevated Water Storage Ta
Description Tank Volume Design periodPeriod Last Service Cost Maintenance Cost
Cleaning (cu.m)
45 (Months)
120 4(Months) P(Php.)
51.57 (Php.)
69,619.50
Repairing 67.1 120 4 P 51.57 103810.41
TOTAL 173429.91
rial Cost Estimate for Water Resources Context
Constructability Constraint
Duration Estimates of Loop Sy
Work hrs/day Duration (days)Manpower / MacWorking days Description of
8 213.07 15 14.2 Pavement Demol
8 93.22 4 23.3 Excavation
8 372.87 4 93.22 Backfill
8 106.53 15 7.1 Surface Restora
8 2130.69 15 142.05 Pipe Laying
279.87 Total Duration (days)
Sustainability Constraint
Maintenance Cost of Radial
0,790.34 Php Total Cost Fo 1,973,255.77 Php
Consideration15%
618.55 Php Cost 295988.37 Php
k Cost Estimate for Water Resources Context
evated Water Storage Tank H.3 Trade-off 3: Underground Water Storage Tank
structability Constraint
tion Estimates of Loop System
Length (m) Width (m) Depth (m) Parameter (man.
Man Work hrs/day
21925.37 0.25 0.1 4 hours
2192.54 8
21925.37 0.25 0.35 0.5 959.23 8
21925.37 0.25 0.35 2 3836.94 8
21925.37 0.25 0.1 2 1096.27 8
21925.37 1 21925.37 8
l Duration (days)
ed System
Ri Wj Ri x Wj
ped system 10 2 20
8 1 8
ium 5 2 10
Failure Index 38
C P Risk Value Assumed CostTotal Cost
2 2 4 93539.52 374158.08
CU.M COST
38.3 406,746
219380
160937
568176
34185
150416
37976.2
140439.57
2,092,799.77
Constructability Constraint
Duration Estimates of Radial System
Description of Length (m)
Duration (days)Manpower / MacWorking days Pavement Demol 30004.24
274.07 15 18.27 Excavation 30004.24
119.9 4 29.98 Backfill 30004.24
479.62 4 119.9 Surface Restora30004.24
137.03 15 9.14 Pipe Laying 30004.24
2740.67 15 182.71 Total Duration (days)
360
F.3 Trade-off 3: Radial Distribution System
Unit Amount
lot 60,000
lot 20,500
lot 21,000
lot 28,000
lot 16,500
lot 7,000
cu.m 95,000
cu.m 40,000
cu.m 25,300
cu.m 18,500
cu.m 75,000
cu.m 35,000
cu.m 42,500
pc 47,500
pc 210,500
pc 85,000
pc 58,300
1,043,100
nstraint
of Radial System
Width (m) Depth (m) Parameter (man.
Man Work hrs/day Duration (days)
0.25 0.1 4 hours
3000.42 8 375.05
0.25 0.35 0.5 1312.69 8 164.09
0.25 0.35 2 5250.74 8 656.34
0.25 0.1 2 1500.21 8 187.53
1 30004.24 8 3750.53
s)
Ri x Wj
12
8
10
30
Assumed CostTotal Cost
98662.79 197325.58
Manpower / MacWorking days
15 25
4 41.02
4 164.09
15 12.5
15 250.03
492.64