Professional Documents
Culture Documents
KRA Summary Last Year
KRA Summary Last Year
Employee No
1 K10UG
2 H105
3 R119
4 B106G
5 KT17
6 K17B
7 K17CD
8 R121H
9 KT27
10 KT28
11 R107E
12 Splendour Plus
13 HF Deluxe
VAVE Idea
VAVE Idea
Approx Approx
Plant Customer Volume Revenue / year
Implimented/Not
Plant Customer/Project Saving /Month implimented
VPPL-II, Ranjangaon Bajaj Auto Ltd. 600000 Implemented
Implimented/Not
Plant Customer/Project Saving /Month
implimented
Assembly Time
VPPL-II, Ranjangaon Bajaj Auto Ltd. reduction - from 30 Implimented
secs to 10 secs
Implimented/not
Project Revenue / year Responsibility
Implimented
Feedback on Protopart on
Sequencial Mirror Implimented - Ball joint and stay assembly
for antirotation.
Responsibility
Engineering Inputs -
1. Support to RFQ,
2. Rootcause analysis of Rattling noise.
3. DVP execution,Sample submission,FTG setup and Parameter setting, 4.
Annealing ink trials and implement,
5. SOP execution
Engineering Inputs -
1. Support to RFQ,
2. FTG setup and Parameter setting,
3. Root cause analysis of Problems (Ball joint assembly with Stay, Mirror Plate
gap),
4. DVP execution,
5. Sample submission,
6. SOP execution
Engineering inputs -
1. Support to RFQ,
2. Root cause analysis of Problems- (Rib Addition for easily fitment of mirror
plate, Rattling noise, Drooping issue)
3. FTG setup and tightning torque Parameter setting,
4. DVP execution,
5. Sample submission,
6. SOP execution
Engineering Inputs -
1. Support to RFQ,
2. Root cause analysis of Problems(Inner retainer and stay Assembly, Noise
analysis),
3. FTG setup and Parameter setting,
4. DVP execution,
5. Sample submission,
6. SOP execution
Engineering inputs -
1. Support to RFQ,
2. Root cause analysis of Problems- Stick slip analysis
Engineering inputs -
1. Support to RFQ,
2. Root cause analysis of Problems- Stick slip analysis
Engineering Inputs -
1. Support to RFQ,
2. Analysis on Proto parts and implement antirotation feature,
3. Mirror Plate setting for visual gap while articulation,
4. Backlash issue - Analysis of root cause,
5. Mould trials at GKR tooling on PP and PPTF 10% material ,
6. Root cause analysis of insufficient length of inert of support plate.
7. Sample submission.
ECN Project -
1. Trials of bellow and special nut,
2. DVP Execution,
3. sample submission
Engineering Inputs -
1. Support to RFQ,
2. Mirror Plate setting for equal gap,
3. Mould trials at GKR tooling,
4. Root cause analysis of insufficient length of inert of support plate. 5. Sample
submission.
BTP Project -
1. Support to RFQ,
2. Communication with Hero regarding drawing approvals and technical
discussion on Tape, Adapter, etc.
3. Homologation Approval,
4. Moulds trials, DVP execution, Inputs for Assembly at VPPL-CN
BTP Project -
Support to RFQ,
Communication with Hero regarding drawing approvals
Responsibility
Responsibility
Bit Not available for M8 nut, Make Bit from Scrap spanner
Difficulty in fitment of mirror plate in housing, so add and exted rib in housing.
Use existing fixture for KT17 Endurance test. Small modification done.