Download as pdf
Download as pdf
You are on page 1of 4
PWD, Thitwvananthapurain 0 © “e-The Principal Accoumant General (audits Renae: shui The Accountant Getieral (A&E, Kerala, Thiruvananthap ings shoe ‘ oe s Porwarded/ty Order Section Officer, Bel Description of works ve based on 2012 SOR i. Soll investigation Wort ‘obilsatian indading transportation ofall necessary pst [nd egupaucts and soaterials of boring eld testing and ‘Sinpling and demobilization after completing the work For machine boring For hand boring £15798/ set 173/ sot Setting up boring rig a each borehore locations incding Carrying ell necessary plan, equipment and material of boring and field tests and collection of samples ateach bore bale location For machine boring For hand boring + 3000/ bore hole '£600/bore hole Boring with rotary power driling equipments in 4) alltypes of soll having N value less than 0 ‘excluding hard rock soft rock or medium rock for stata upto 10m including conducting necessary SSP-T and recovery of undisturbed soll samples at ‘Sm Interval, £2923/m for ordinary soll £1200/miforunder water by Fornext 10m -do- uptos depth of 20m £025 ma for ordinary soi £1300/m for under water ) Fornext 10m up to 30m depth £.1050/0 for ordinary soil 1400/m forunder water 4 Above 30M $.1100/m for ordinary sol [Above 20 M & 1500/m for under water Taye Boring through all types oThard rock or sinlarrefosal Strata oF value greater than 50 using diamond core “riling it for fn land der water and banks of Fiver sight with 1M contour Interval with SmxSm incerval ®) Pain buitup area with hindrance toline o sight due to buldings structures 2 Inbal terrain 5] Boring through al lassen af vock excluding hardroa having "W" value greater than SO using tanger cote driing bit 2) Intand x2401/m 5) Water £2620) ‘6 Recovering undistrbed sol sampies wing in be sampler ofS to 100mm internal dia 800mm length esio/e onfiring to relevant coe tay requled dopa Inctuding leaning ie borehole et compete 7 Cone standard peveteation eatin Barcho aeaay e205e depth [Recovering distarbed samples and preseovng he wane Yea airtight sample containers including waxing aban Packing storing including cost of container se per I ode 9°" Bsn lator over Nos of second dass baking fnango wood plans ofnotess than 30mm tick ama 4948/10m2 ‘Wood oats of 100mm 7Omm 2 em intervals incaging ‘abour and hice ofall materials and dsmanting the Platform after completion of work ete complete exlucing the hie of boas (platform of minimum se 600%8 oe willbe required) 10 | Hire charges for providing T Nos, of TST oat wit boatman for erecting the platform over which the berng £2087/éay Pantin tobe erected and'1 no of acoss boat withers boatman fr conveying the departmental staf and labour engage from te banks to patorm and back cee 4X | Compilation ofa Wild data wih recommendation Trt ‘uitable foundation after conducting nets eb ace (eepore inept) 2) Machine boring %10000/set for 8 tore 1) Hand boring 5000/86 J holes foradditional set £2000 per extra for bere holes exceeding 5 Nos. (for machine boring) 12 | Total Station Surveying and Preparation ofits plan 8) Psinand open arcawithouthindrancetotine of | ¢9703/tHecte TINBI/Hectr er 11790/Hecte — . mal Se for surveying inorder to provide clear line of site deve of any hindrance due to vegetation ete and clearing areas for Station points (This item ls applicable only for sites without access suchas in ease of new road forme bridge and building sites at inaccessible locations) 15 [Providing aos tothe ate caring ate and wang 5500] | [ie [arson dome | 2) Rewer >) Thodu | 15 | Hydra and Velosiey Calculation | a) River ») Thodu Preparation of detailed Project Report of the bridge works Containing alignment plan, Key plan, Contour plan, Index tap, Longitudinal and Cross Section of roa and | riverythodu cross section of bridge hydratlicand velocity | saleulations including neat fling and supplying fie set [ DPRete. as per the direction of departmental officers | Providing access tothe site, clearing site and making good | t©erecting and conducting soll testing transfers within the | site and for any other temporary arrangements tobe erected within the area in connection with conducting sll testing . ] e4107/Mocte | €1204/s0t ¥808/set © 33999/set €29850/10m2 |) eprint aractra deg ornate acs water tnk sunpealvers sean mater on Preparation of detailed estimate based on standard Ga Preparation oFArchieckral drawing [2 | SucuraT design of bllaing upto a Team [2 | Foradationararea Boaz] ‘C7596 ofthe estimate | cost of respective items by negotiation. —_| 10.75% of estimate castor by negotiat _| 1% ofthe estimate Cost oF | | ene CHIEF ENGINEER

You might also like