Ticket #: 1137309 Revision#: 0
Job Pack #: 1558218
Start Date: 2019-06-28 End Date:
PO Number: To Follow Work Order #: 1137309
Plant Name: SSV Louisiana
Location: South India - Kakinada
Operator Name: Ventura
Billable Customer: Ventura
NOV Representative: Scutt, Norman
Summary:
Service requested by customer
To replace the Disc Brakes on the Drawworks Drumshaft. To complete the Burnishing and Brake
Test.
Issue an SOF of the Brakes.
Summary of service performed
Summary of Service Performed.
Completed replacement of Disc Brakes. DS s/n 24065, ODS s/n 24072
DS s/n 24065 ODS s/n 24072
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 1 of 12
Drumshaft being extracted. Drumshaft on the Drill floor getting stripped
down.
Drumshaft with replaced Discs in the DW. DW almost completed with covers on.
DS lining after second Burnishing. ODS lining after second Burnishing.
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 2 of 12
DS Disc contact surface after Burnishing. ODS Disc contact surface after Burnishing.
Completed the Burnishing of the Calipers as per NOV document 11025719‐PRO.
Completed Brake Test as per NOV document D731000128‐PRO‐001.
Communicated with NOV Engineering on the Brake Test results and Burnishing Procedure.
Recommendations / Outstanding issues
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 3 of 12
SSV LOUISIANA 1625‐DE Recommendations
DRUMSHAFT
Replace damaged cooling water hoses – DS.
Replace both High and Low drive chains.
Replace all Transmissions chains.
Monitor the Low sprocket bearings, with emphasis on regular grease applications, and
ensuring that all grease fittings are accepting grease.
Replace all the Caliper Support Arm seals.
Replace all Hydraulic hoses from the Brake cylinders to the HPU.
Repair all poor fitting covers. Ensure all fasteners are in place and functional.
Install good quality gasketing to eliminate oil leaks. NOV do not recommend the use of
Silicone Sealants.
Replace/repair grease lines to the Main bearings DS and ODS, and Positive Low Clutch ring.
Grease all greasing points with enough quantity.
Replace Friction Discs, Backing Plate, Centre Plate and Springs. Utilize a good quality dry
lubricant on the Ring and Hub gear teeth.
Align the Baylor Brake.
Strip down and replace the Friction Disc’s, Centre Plate, Back Plate and Spring set in the Low
Clutch. Use Dry Lubrication on all the gear teeth at assembly.
Replace the High Clutch Drum at a scheduled maintenance period.
Install the Coring Reel Brake Arm.
Change the Drawworks oil at a convenient scheduled maintenance period, with the
recommended oil grade. SAE 40 or the equivalent.
HPU
Replace the faulty PRV.
Replace the Primary Pump.
Replace hydraulic hoses.
Replace the hydraulic oil and filters.
Replace/calibrate all the gauges on the Drillers console, ensuring correct scaling.
Replace/calibrate the gauges on the manifold with correct scaling.
Detail Service Report Description:
Date: 2019-06-28 Total Hours: 12 ¡ Onshore ¤ Offshore
Activities
Start Time: Stop Time: Total Hrs: 1 2
Activity:
Travel Time.
Travel to Rajahmundry.
Universal agent meet/greet and transfer to Hotel in Kakinada.
Check into Hotel.
Next 24 Hrs.
Early morning pick‐up with Universal agent. Transfer to Kakinada Port.
Boat transfer to rig.
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 4 of 12
Date: 2019-06-29 Total Hours: 12 ¡ Onshore ¤ Offshore
Activities
Start Time: Stop Time: Total Hrs: 1 2
Activity:
Travel Time.
Early morning pick‐up with Universal agent and transfer to Kakinada Port.
Boat transfer to rig.
Service Time.
Safety induction.
Meet with Rig Management and discuss the SOW.
Inform management that we will split shifts and one will short change to a
00:00 to 12:00 shift.
Go to the Drill floor to survey the work site.
Monitor the preparations to remove the TDS.
Next 24 Hrs.
Early morning pre‐tour meeting.
Prepare to remove the Drumshaft.
Assist welder to remove the Sampson Posts and EazyTorque.
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 6 of 12
Arranged for a tap to be modified to fit in the space available.
Assembled the drive chains in front of the drawworks. Marked out the links needing
attention.
Fitted the DS and ODS Support Caliper Arms into position ready for adjustment and
tightening down.
Completed handover with NOV FSE on the drill floor. However, after communication
with the office, NOV FSE (Prabhakar) was to arrange transport to leave the vessel
today.
Meet with Rig management and planned for NOV FSE to take the crew change boat in
the afternoon. Onward arrangements NOV to assist with travel to Mumbai.
Discussed the handover and planning for me to go onto 06:00 to 18:00 shift.
Completed wire tie on the DS main bearings.
Completed the ODS main bearings bolts tightening and wire tie.
Due to boat schedule change NOV FSE not able to depart. Arrangements for the next
day – 04/07/2019.
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 7 of 12
contributing factor for the high bearing clearance reading.
Final checks on all the drive chains and link keepers and the drive chain housings
were clear of tools and rags.
Installed the back, drive chain covers – DS and ODS.
Installed the front, drive chain covers – DS and ODS. Slight adjustments still to be
made to the DS cover.
Completed the alignment of the ODS Caliper Support Arm and torqued down. Wire
tied the fasteners.
Cleaned off all the excess caliper cylinder adjusting grease, ready to adjust the
calipers.
Completed housekeeping.
Next 24 Hrs.
Complete the covers.
Clean the discs and adjust the calipers. Fit the newly refurbished emergency calipers.
De‐isolate the DW and function.
Burnish the brakes and perform brake test.
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 8 of 12
Date: 2019-07-07 Total Hours: 12 ¡ Onshore ¤ Offshore
Activities
Start Time: Stop Time: Total Hrs: 1 2
Activity:
Service time.
Early morning in the Mechanic’s office meet with Chief mechanic and discuss the
SOW.
Arranged for the DW to be de‐isolated.
Functioned the DW to check for any issues. Found that the Positive Low Clutch yolk
bracket was touching the cooling water hoses. Removed the yolk and bracket, to skim
off some material.
prepared for the Burnishing of the Emergency Calipers.
Completed Burnishing the Emergency Calipers and did a Brake Test. Both calipers
broke at 1500amps. Removed the calipers to check on the condition of the linings.
Decided to change the linings for new. Replaced and completed a test without
burnishing, this broke at 1200amps.
Completed Brake test for the Service Calipers, both DS and ODS exceeded 2400amps
without rotation of the drum.
Completed housekeeping.
Next 24 Hrs.
Completed burnishing of the new linings for the emergency calipers.
Communicate with NOV Engineering on the calipers.
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 9 of 12
Service Time.
Early morning in the Mechanic’s office meet with Chief mechanic and discuss the
SOW.
Proceeded to the Drill floor. Arrange for the transmission cover to be removed.
Completed 50% inspection of the transmission.
Continued to communicate with NOV India office and Houston engineering. Located
on PR Valve in Houston – relayed the information to the customer.
Completed housekeeping.
Next 24 Hrs.
Complete the transmission inspection, box up the transmission.
Continue to communicate with NOV engineering.
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 10 of 12
Service Time.
Early morning in the Mechanic’s office meet with Chief mechanic and discuss the
SOW.
Proceeded to the drill floor and completed preparing to Burnish.
Completed burnishing the Emergency Calipers.
Completed Brake test on all calipers.
DS and ODS Service Calipers achieved 800amps/motor without the drumshaft
rotation.
DS and ODS Emergency Calipers achieved 500amps/motor before rotation of
the drumshaft.
Removed and checked the surfaces of the linings and Disc contact surfaces. Installed
again.
Loosened the DS Caliper Support Arm to move inboard as the pads indicated that the
disc is slightly inside the contact of the pad – leaving a ridge.
Communicated with NOV Engineering and Technical Support, feeding back results of
the Burnishing and Brake Tests.
Next 24 Hrs.
Move both DS and ODS slightly inboard.
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 11 of 12
Job Start Date: 2019-06-28 Job Finish Date:
Total Days*: 17 Total Overtime Hours: 0
NOV Representative Customer
Name: Scutt, Norman Name:
Signature Signature
Signature not saved anywhere and it is secure. Signature not saved anywhere and it is secure.
Date: 2 0 1 9 - 0 7 - 1 3 Date: 2 0 1 9 - 0 7 - 1 3
¨Click here if the signature device is not available. ¨ Click here if customer not available to sign.
Notes:
*Additional travel time may be added.
For any questions about this Service Report please contact the following number: +65 6594 1000
Service Report (NOV-1137309 -> JP-1558218 -> Rev-0)
Page 12 of 12