FINAL INSPECTION CENTERLINE Date: 20/08/14

span: R327-R592-N-~AS-02 管径: φ1,500㎜


推進管№ JOINT 13back 12back 11back 10back 9back 8back 7back 6back 5back 4back 3back 2back 1back JOINT
設計値 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

№01~13 6 2 5 0 1 5 -5 -7 -17 -18 -8 -20 21


誤差 6 2 5 0 1 5 -5 -7 -17 -18 -8 -20 21

210

設計値
140

70
水 平 位 置

№01~13

0
Left Limit
-70

-140
Right Limit

-210
JOINT 13back 12back 11back 10back 9back 8back 7back 6back 5back 4back 3back 2back 1back JOINT
推進管№
FINAL INSPECTION INVERT ELEVATION Date: 20/08/14
1 1 2 3 4 5 6 7 8 9 10 11 12
span: R327-R592-N-~AS-02 管径: φ1,500㎜
推進管№ JOINT 13back 12back 11back 10back 9back 8back 7back 6back 5back 4back 3back 2back 1back JOINT
設計値 5.670 5.672 5.675 5.677 5.680 5.683 5.685 5.688 5.691 5.693 5.696 5.699 5.701 5.704 5.707

№01~13 5.684 5.665 5.660 5.662 5.674 5.697 5.682 5.682 5.689 5.687 5.708 5.717 5.720
誤差 0.012 -0.010 -0.017 -0.018 -0.009 0.012 -0.006 -0.009 -0.004 -0.009 0.009 0.016 0.016

5.87

5.82 設計値

5.77

№01~13
5.72

5.67
Upper Limit
5.62

5.57 Lower Limit

5.52

推進管№