AIN Engineering Service

Engineering and Project Management Services


 

Design Validation Procedure


Incompliance ISO 9001:2015
Document No. EMT-SOP-004

DO NOT DUPLICATE, CONTROLLED COPY IF STAMPED IN RED


Page 1 of 6
Doc. No. EMT-SOP-004
Rev. 0
Design Validation Procedure Date 15-Oct-2018
Page 2 of 6

Document Information

Category Documented Information


Document Design Validation Procedure
Rev 00
Identifier EMT-SOP-004
Status Final Document
Author(s) Lead Engineer I&C
Reviewer(s) Engineering Manager
Approver(s) Chief Executive Officer
Creation Date 3rd Sep, 2018
Effective Date 3rd Sep, 2018
Control Status CONTROLLED
Distribution CEO, Engineering Manager
Disclaimer This document contains confidential information. Do
not distribute this document without prior approval
from higher management of AIN ENGINEERING
SERVICES

Document Approval

Prepared By Reviewed By Approved By

Lead Engineer I&C Engineering Manager Chief Executive Officer

DO NOT DUPLICATE, CONTROLLED COPY IF STAMPED IN RED


Doc. No. EMT-SOP-004
Rev. 0
Design Validation Procedure Date 15-Oct-2018
Page 3 of 6

Document Revision History

Rev/Issue Date Description Prepared by

DO NOT DUPLICATE, CONTROLLED COPY IF STAMPED IN RED


Doc. No. EMT-SOP-004
Rev. 0
Design Validation Procedure Date 15-Oct-2018
Page 4 of 6
 

Table of Contents
1.  OBJECTIVES .............................................................................................................................. 5 
2.  SCOPE ........................................................................................................................................ 5 
3.  RESPONSIBILITY ....................................................................................................................... 5 
4.  ABBREVIATIONS/DEFINITIONS ............................................................................................... 5 
5.  PROCEDURE .............................................................................................................................. 5 
5.1.  Mechanical Design Validation ...................................................................................................... 6 
5.2.  Process Design Validation ........................................................................................................... 6 
6.  RELATED DOCUMENTS ............................................................................................................ 6 
6.1.  Management of Change Procedure: EMT-SOP-008 .................................................................. 6 

DO NOT DUPLICATE, CONTROLLED COPY IF STAMPED IN RED


Doc. No. EMT-SOP-004
Rev. 0
Design Validation Procedure Date 15-Oct-2018
Page 5 of 6
 
1. OBJECTIVES
To ensure that the project delivered is being implemented as planned and delivering the intended outcome.
Design validation results will be documented in any form and kept in record.

2. SCOPE
This Standard Procedure applies to the projects for which basic design package is the responsibility of the
Company’s Design Department.

3. RESPONSIBILITY
Lead Project Engineer or his nominee will be responsible for process validation of the design.
The LE Mechanical or his nominee will be responsible for design validation of stamped products or where
Authorized Inspector will be involved.

4. ABBREVIATIONS/DEFINITIONS
AI Authorized Inspector

Client Company that hires AIN to perform engineering and project management services

DE Design Engineer

Discipline Process, Mechanical etc.

Document Term synonymously used for drawings, data sheets, specifications, calculations etc.

EL Engineering Lead, a person nominated within Design Department for project. One
Engineering Lead may handle multiple projects simultaneously. This functionary will lead
and make sure that the design team will achieve the desired output.
EM Engineering Manager

LE Lead Engineer

LPE Lead Project Engineer

MOC Management of Change

PE Project Engineer, a person nominated within Engineering Department for each project.
One Project Engineer may handle multiple projects simultaneously. This functionary acts
as single point contact between Client and design department.
SP Standard Procedure

TQ Technical Clarification

5. PROCEDURE
Design validation will be carried out in two phases based on scope of work. The first phase is mechanical
and second is process design validation.

DO NOT DUPLICATE, CONTROLLED COPY IF STAMPED IN RED


Doc. No. EMT-SOP-004
Rev. 0
Design Validation Procedure Date 15-Oct-2018
Page 6 of 6
 
5.1. Mechanical Design Validation
5.1.1. Mechanical design validation will be accomplished for stamped equipment/product.
5.1.2. Nominated PE will contact AI for all practical purposes.
5.1.3. Nominated LE will provide design output and supporting documents, if any, to AI for design
validation according to the relevant code.
5.1.4. AI will return validated design documents to LE.

5.2. Process Design Validation


Process design validation is carried out at site when all the equipment are in place at their respective
locations and interconnected according to the design and detailed engineering documents.
5.2.1. Process design validation is carried out by the Client’s commissioning team.
5.2.2. LE or Nominated PE will seek process design validation data from Client for the Company’s record
and future reference, however, sharing of validation data by Client with the Company is at the sole
discretion of the Client.
5.2.3. In the situation mentioned in 5.2.2 above, Client intimation to company regarding project
commissioning / operation in the form of e-mail / issuance of certificate or whatsoever will be
considered as successfully process design validation.
5.2.4. Client may contact the company in case of variation in process parameters with respect to the
intended results during process design validation keeping in view that all the input conditions are
as per approved design basis.
5.2.5. In case of change in design input data, the Client may contact the Company for modification /
change in project documents in accordance to achieve his desired set of results.
5.2.6. The situation mentioned in 5.2.5 above will be reviewed and carried out as per Management of
Change Procedure EMT-SOP-008.

6. RELATED DOCUMENTS
6.1. Management of Change Procedure: EMT-SOP-008

DO NOT DUPLICATE, CONTROLLED COPY IF STAMPED IN RED