CTI ENGINEERING INTERNATIONAL CO., LTD.

THE CONSULTANCY SERVICES FOR THE CONSTRUCTION SUPERVISION OF THE FLOOD RISK MANAGEMENT PROJECT (FRIMP) FOR THE CAGAYAN RIVER, TAGOLOAN RIVER AND
IMUS RIVER (JICA LOAN AGREEMENT NO. PH-P253)

STRAIGHT LINE DIAGRAM (Imus Retarding Basin)


Progress as of December 31, 2019

DRAINAGE SLUICE (2x2m RCBC)

(l.m.) Quantity (cu.m)


ITEM Ht. (m)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 Previous This Period To Date
1.00
Excavation for 2.00
Sluiceway Channel 3.00 6800 0 6800
(Common Soil) 4.00
5.00
6.00
Excavation for
7.00
Sluiceway Channel (Soft 2400 0 2400
Rock) 8.00
9.00
CONCRETING WORKS
Lean Concrete 27 0 27
Bottom Slab

Side Wall

SPAN 1
Top Slab 0 32.05 32.05

River Side Breast Wall

Conc. Collar bet. 1&2


Bottom Slab
Side Wall
SPAN 2

Top Slab 0 1.62 1.62


Seepage Cut off Wall
Conc. Collar bet. 2&3
Bottom Slab
Side Wall
SPAN 3

Top Slab
Land Side Breast Wall
Wing Wall River Side
Wing Wall Land Side
1.00
2.00
3.00
4.00
Backfill About Sluice
5.00
Structure
6.00
7.00
8.00
9.00

LEGEND:

August 2016~ November 2019 December 2019

Prepared by: Noted by:

Eugene C. Mina, Jr. Arjine I. Ramirez


Project Inspector Structural Engineer