Professional Documents
Culture Documents
PLDT Equipment Inventory Checklist PSS
PLDT Equipment Inventory Checklist PSS
Air-Con Unit
Grounding System Check ˂25Ω Ohms (Ω) Failed Passed
2. Test if Exhaust Fans are functioning Encoded to Database By: Noted By:
according to Temp settings
REMARKS:
3. Check relays of thermostat/ACU timer
1
Encoded to
2 Database by: Noted by:
PMS REMARKS:
Conducted by: _______________________
________________________
PMS Date: _______________________
Time In/Out: _______________________
Cabinet Type: ________________________