Mombasa - Mariakani (A109) Highway Project Lot 1: Mombasa - Kwa Jomvu Section
Mombasa - Mariakani (A109) Highway Project Lot 1: Mombasa - Kwa Jomvu Section
APPROX AREA SPRAYED: M2 7098 MEAN SPRAY RATE: L/M2 L/M2 PRESSURE: Kpa 22
A B C D E F G
Sampling Off set Tray Wt. of tray Wt. of Wt. of Vol of Area of Spray
2 Average (l/m2) Remarks
Bitumen (g) Bitumen (l) = tray (m )
chainage (Km) from Retaining No. and Bitumen (g) tray (g)
= (B-C) D/(G*1000) rate (l/m2) = A/F
=F
Km0+100LHS 2.0m Z 978.0 888.0 90.0 0.099 0.09 1.10
DETERMINED AS PER RDM PART III (Clause 7.4.1) OF SPECIFIED MC 30 PRIME SPRAY RATE 0.8-1.2L/M2