Installation of Cable Tray
Installation of Cable Tray
@ 50.00 = 1,500.00
@ 50.00 = 1,750.00
width 0.25 m number of dunnage 56
height 0.3 m total volume 2.94 m³
length 0.7 m
volume 0.0525
M S U M M A R Y O F M A T E R I A L S (concrete works)
A QTY. UNIT PARTICULAR
T
31.0 bags 265 ₱ 8,215.00 Portland Cement
E
R 1.8 cu.m 1050 ₱ 1,852.20 Sand
I 2.7 cu.m 1050 ₱ 2,852.39 Gravel
A
L 382.2 kgs 65 ₱ 24,843.00 Steel Reinforcement
S TOTAL MATERIAL COST ₱ 37,762.59
A
S U M M A R Y O F M A T E R I A L S (formworks)
T QTY. UNIT PARTICULAR
E 82.3 bd.ft 35 ₱ 2,881.20 Lumber
R
I 1.0 shts 950 ₱ 950.00 Plywood ordinary
A 1.0 cu.m 65 ₱ 65.00 Assorted Nails
L
TOTAL MATERIAL COST ₱ 3,896.20
e works)
ment
₱ 1,325.24
works)
ry
Contract Name : UNLOADING OF SOLAR PANEL
Location of Contract : Jimenez, Misamis Occidental
DETAILED ESTIMATES
I.) UNLOADING
Labor:
1500.0 pcs - Solar Panel @ 30.00 = 45,000.00
Total (Labor Cost) = P 45,000.00
Name of Project : UNLOADING OF SOLAR PANEL
Location of Project : Jimenez, Misamis Occidental
SUMMARY OF ESTIMATED COST
Item No. and Description Amount
I.) Hauling of Materials 45,000.00