Professional Documents
Culture Documents
Cm-Elec - (75 To 76) - Send To MGPS at (16-10-2020) PDF
Cm-Elec - (75 To 76) - Send To MGPS at (16-10-2020) PDF
1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment
2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-ELEC-75/20 16-October-2020 MORISY 0 0 NO NO ELEC ELEC
KKS 00BZL20/21
Maintenance
Remarks
1- 2- 3-
Work Team
Names
4- 5- 6-
Performed
Job
Engineer
Remarks
No Description Part No. Qty
1
2
Used 3
Material
4
6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature:
MINISTRY OF ELECTRICITY ENERGY
PUBLIC ELECTRICITY CORPORATION
MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT
1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment
Details of Defects To check and repair the extract fan (store& bathroom).
2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-ELEC-76/20 16-October-2020 MORISY 0 0 NO NO ELEC ELEC
KKS 00GAY
Maintenance
Remarks
1- 2- 3-
Work Team
Names
4- 5- 6-
Performed
Job
Engineer
Remarks
No Description Part No. Qty
1
2
Used 3
Material
4
6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature: