Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FRONT ELEVATION ASSEMBLY DETAIL SIDE ELEVATION

Temporary
T-8b T-8a
Element Saddle Refer to
for Cable DWG. NO 135N T-8c
hoisting
T-4

Bolt + Nut + Washer M16


T-5
Plate
T-3
T-6 295/58/6
Plate
T-2
420/315/6

T-1 Bolt+Nut+Washer M16


T-4
Plate
T-2 T-3
420/360/6 T-5

T-3 T-6
Angle 65/65/6
T-7

Intermediate Element
Refer to Drawing No 109N :

300 300 400


1250 1250
2500

FRONT ELEVATION NOTES :


WELDING DETAIL OF PART T - 1 1) To obtain uniformity, use of templates and jigs
FRONT ELEVATION SIDE ELEVATION is mandatory for holing bending and welding
Rod φ 10 mm T-1b
1090 of assembly.
Lacing
2) All parts or bundles and packages with
Angle 65/65/6
T-1a identical parts have to be bundled or marked
with the respective part number by the
400 workshop.
Angle 65/65/6 Rod φ 10 mm
PLAN T-1a T-1b HMG / Ministry of Local Development
40 80 DoLIDAR / Short SpanTrail Bridge Standard
Bridge Name:
No: Span:
Steel Drawing:
r = 70

Top Element
for Tower No. 1, 2 or 3
40 40
80 270 270 270 200 Assembly & Welding Details
1090
Date : September 30, 2002 Drawing No. 119N
Produced by Nepal Swiss Association for International Cooperation, in partnership with His Majesty’s Government of Nepal, funded and supported by the Swiss Government (SDC Nepal). 31