1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment
Details of Defects To repair the main fan of SWG HVAC_ Ref to Abdullah Munif to investigate for the required equipment.
2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-HVA-8/20 04-October-2020 MORISY 0 1 NO NO HVAC MECH
KKS 10SAA10
Maintenance
Remarks
1- 2- 3-
Work Team
Names
4- 5- 6-
Performed
Job
Engineer
Remarks
No Description Part No. Qty
1
2
Used 3
Material
4
6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature:
Designed By: SQ