Model Commissioning Plan - Sample PDF
Model Commissioning Plan - Sample PDF
BG 8/2009
CONTENTS
CONTENTS
INTRODUCTION 1
COMMISSIONING WORKS 3
Preparation 4
Design 4
Pre-construction 4
Construction 5
Commissioning of engineering services 5
Pre-handover 5
Initial occupation 5
Post-occupancy aftercare 6
REFERENCES 14
© BSRIA BG 8/2009
INTRODUCTION
INTRODUCTION
Stage 1: Preparation
Stage 2: Design
Stage 3: Pre-construction
Stage 4: Construction
Stage 6: Pre-handover
All projects can benefit from following the model commissioning plan,
from domestic dwellings to multiuse commercial developments.
© BSRIA BG 8/2009
MODEL COMMISSIONING PLAN TEMPLATE
The following tables show the commissioning activities that will be undertaken on this construction
project. (These activities have been compared with CIBSE activities found in Responsibility Matrix of
CIBSE Code M and the relevant cross reference shown at CIBSE ACT 1, CIBSE ACT 5 etc). The lead and
support responsibility for each activity will be supplied by members of the commissioning team. This
activity checklist sheet will be used to ensure all activities are planned against the project programme
and project cost plan.
Support
Stage Activities Lead role End date Comments
role
Support
Stage Activities Lead role End date Comments
role
including:
• Schematic drawings
• Detailed design drawing
• Installation wiring diagrams [CIBSE ACT 1]
• Building management system integration