Amal-18 Sta DDR#21 03-03-2020

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 30

Page 1/2 DAILY DRILLING REPORT

3-Mar-20 No: 21

GENERAL DATAINFORMATION:
Rig Name: ADM-6 DRLG SUPV. MOHAMED HASHEM Water Depth: 77 ONHIRE DAYS: 20.52
Well Name: AMAL-18 STA Night DRLG. MOHAMED SABER RKB-MSL: 95.3 MOVING: 1.52
Location: Gulf Of Suez DRLG ENG RKB-THF: 57.5 FT PLANNED DAYS: 48
Field: AMAL FIELD PET. ENG PLANNED TD: 10242 FT TODAY NPT, HR:
PLATFORM: AMAL-B SPUD DATE 29/02/2020 Cumulative NPT, hrs: 6
06:00 Status: ROTARY DRLG W/8 1/2" AUTOTRACK G3 T/ 4450' Daily Cost, USD: $ 81,011

24Hs Summary:
till 00:00 P/U, M/U & RIH 8 1/2" RSS ASSY. (BHA #7) T/3900 FT. & ROTARY DRLG W/8 1/2" AUTOTRACK G3 F/ 3900' T/ 4261 FT. Cum. Cost, USD: $ 1,272,585

24Hs plan: CONTINUE ROTARY DRLG W/8 1/2" AUTOTRACK G3 F/ 4450' A.F.E: MM $6.00

HSE:
Trip Drill: Sour Gas: Fire Drill: 16/02/2020 Days Free Since LTA
Kick Drill: Rig Evac: M O B: LAST BOP TEST
Drills run Today: STOP CARDS First aid Cases: H2S Drill 21/02/2020
BHA
BHA Number: 7 Length (ft): BHA Wt: 48.00 Wt. below jar IN MUD: 12 KLBS JAR S/N: DJ 10-650-60
Jar in hole (hrs) 56
Components
** BHA #7 : ( 8 1/2" PDC BIT + ATK STEERABLE + 6 3/8" FLEX SUB + 6 3/4" ON-TRACK-STOP + 6 3/4" BCPM + 6 3/4" NM STOP-SUB + 6 CIRC. SUB S/N: 34
3/4" STAB. + 6 3/2" FLOAT-SUB + 6 3/8" BPL+ 6 X 6 1/2" DC + 6 1/2" JAR + 3 X 6 1/2" DC + 24/5" HWDP).
CIRC. SUB HR: 22
BIT INFORMATION MUD Information WellControl: Drilling Information
Bit Number: 2 TEST TIME: Last Csg Depth MD(ft): 3456.5 Motor AKO 1.2

Run Number: 3 Mud sys: WBM Last Csg TVD (ft): Motor RPG 0.16
Type: PDC Mud type: SSM FIT/LOT (EMW): P/U - S/O- ROT WT.S (klbs):
IADC Code: M223 FLOW LINE TEMP, F 90 current mud wt. Motor RPM 60-80

Manufacturer: BAKER HUGHES DEPTH 4261 MAASP (psi): 0 Wt on Bit (klbs): 20-25

Size (in.): 8 1/2" MUD WT - PPG 10.30 Last BOP Test: Surface RPM: 60

Serial No: 5300526 F. VIS.- SEC/Q 45 SCR Pump Information:


Nozzles: 6 * 13 RPM 6 10 DEPTH: Pump PumpLiner Strokes Circ. Rate
TFA : RPM 3 8 time: Number bore(in) Ln(in) SPM (gpm)
BIT FOOTAGE PV - CP 17 SPM: 1
Last Run date: 2/3/2020 YP - lb/100ft 2
22 Pump1 -psi 2
total on-btm(hrs) 8.37 GEL 10S - lb/100ft2 10 Pump2 -psi Stand-Pipe (psi):
TOTAL FOTAGE: 372.0 GEL 10M - lb/100ft2 13 Pump3 -psi Flowrate (gpm):
current run depth: 3900 API FILTRATE HPHT Directional Survey Information:
Today on-btm hrs: 8.37 CAKE API/HTHP- 1/32 MD Angle AZI TVD Vertical Coordinates DLS
Today footage: 372.0 SAND % (FT) (°) (°) (FT) Sect. FT N/S E/W O
/100 FT
Today ROP (on btm) 45.0 SOLIDS % 3097.27 12.57 15.55 3081.73 -65.52 867832.66 598950.37 2.40
TOTAL on-btm(HRS) 8.37 PH 9 3195.69 14.06 28.23 3177.53 -44.69 867835.26 598956.73 3.32
TOTAL footage (FT) 372.00 OIL %
3290.84 15.67 37.24 3269.50 -20.86 867839.30 598962.96 2.96
Total ROP (on btm) SALINITY 174000 3385.98 18.02 39.18 3360.55 6.53 867844.51 598969.56 2.54
DULL GRADING WATER % 3507.00 23.50 33.05 3473.68 48.83 867852.14 598980.16 4.87
Inner Rows: MP-CCs H2SO4 3601.00 26.31 28.77 3558.94 87.23 867858.32 598990.53 3.55
Outer Rows: O/W % 3697.00 27.24 26.41 3644.65 128.55 867864.42 599002.22 1.47
Dull Charac.: CL-Whole Mud - ppm 3845 26.95 24.41 3776 192.17 867873.24 599020.79 0.65
Location: WPS (CaCl2)-Mg/L 3945.00 26.67 25.10 3865.66 234.57 867879.00 599033.28 0.42
Bearing Seals: MBT 30 4039.00 26.66 27.20 3949.66 274.56 867884.68 599044.83 1.00
Gauge: Stability - Volts 4133.00 25.72 29.61 4034.02 314.37 867890.69 599055.96 1.51
Other Dull: KCL % 4228.00 25.52 29.66 4119.67 354.04 867896.89 599066.86 0.21
Reason Pulled: 4322.00 26.72 33.11 4204.08 394.3 867903.46 599077.62 2.06
CONSUMABLES
PRODUCT PREV. BBLS RCVD. BBLS USED BBLS TODAY BBLS USABLE REQUIRED
P/ WATER, BBL 490 80 80 490 0
D/ WATER, BBL 57 314 0 371
DIESEL, BBL 364 628 73 919 699
BULK MATERIAL
PRODUCT PREV. RCVD. USED TODAY (CU.FT) TODAY (SACKS) TODAY (MT)
CEMENT G-NEAT #1 800 442 358 358.00 15.3
CEMENT G-NEAT #2 0 0 0 0.00 0.0
CEMENT G-NEAT #3 0 0 0 0.00 0.0
BARITE #1, CU.FT 56 0 7 49 66.22 3.0
BARITE #2, CU.FT 0 0 0 0.00 0.0
BARITE #3, CU.FT 0 0 0 0.00 0.0

1of2
Page 2/2 DAILY DRILLING REPORT
3/Mar/20 No: 21

Geology Information:
Formation Top in program Actual Formation Top in program Actual
Lithology Lithology
Name: MD/TVDSS MD/TVDSS Name: MD/TVDSS MD/TVDSS
S.Gharib ANHYDRITE, SALT & SHALE BELAYIM
KAREEM RUDIES
Personnel ON BOARD
Company No. of people Company No. of people
Amapetco 3 Mud logging Petro-service 4
EPHH 0 ADES Service 1
Amapetco Field 4 SLB W/L 0
SLB Cement 0 SLB Downhole 0
RIG ADM-6 45 Gharib S/L 0
Catering 14 Baker Fishing 1
Baker Mud 1 WELL SERVICE GYRO 3
DIRECTIONAL & MWD BAKER 4 TOTAL ON BOARD 80
Time (hh:mm)
OPERATIONS
From To Hrs
0:00 1:00 1.0 CONT'D L/D 8 1/2" STEERABLE MOTOR ASSY.
** 8 1/2" TRI-CONE BIT + 8 3/8" STEERABLE MTR + 7 3/4" STB + 6 3/4" MWD + 6 3/4" FLOAT SUB + 6 1/2" UBHO SUB
1:00 4:30 3.5 P/U, M/U & RIH 8 1/2" RSS ASSY. (BHA #7).
** BHA #7 : ( 8 1/2" PDC BIT + ATK STEERABLE + 6 3/8" FLEX SUB + 6 3/4" ON-TRACK-STOP + 6 3/4" BCPM + 6 3/4" NM STOP-SUB + 6 3/4"
STAB. + 6 3/2" FLOAT-SUB + 6 3/8" MULTI OPEN CIRCULATION SUB )
** BIT DATA: ( 8 1/2" PDC BIT (TD506X, ), 6 BLADES IADC: M223 SERIAL: 5296146 NOZZLES: 6 X 13
4:30 5:30 1.0 PERFORMED SURFACE VERIFICATION ELECTRONIC TEST ON AUTOTRACK AND ONTRACK EQUIP.
5:30 6:30 1.0 HAVE FAILURE ON MUD PUMPS, FIX SAME.
6:30 7:00 0.5 PERFORM SURFACE PRESSURE TEST ON AUTOTRACK AND ONTRACK EQUIP.
7:00 7:30 0.5 PERFORMED DOWNLIND ON SURCACE, TEST ONTRACK & BCPM.
** GPM: 400 P: 700-800 PSI
** GPM: 450 P: 800-900 PSI
** GPM: 500 P: 900-1000 PSI
7:30 9:00 1.5 CONT'D P/U, M/U & RIH 8 1/2" RSS ASSY. (BHA #7)
** BHA #7 : ( 8 1/2" PDC BIT + ATK STEERABLE + 6 3/8" FLEX SUB + 6 3/4" ON-TRACK-STOP + 6 3/4" BCPM + 6 3/4" NM STOP-SUB + 6 3/4"
STAB. + 6 3/2" FLOAT-SUB + 6 3/8" BPL+ 6 X 6 1/2" DC + 6 1/2" JAR + 3 X 6 1/2" DC + 24/5" HWDP).
BHA WT: 45 KLBS WT BELOW JAR: 14
9:00 9:30 0.5 PERFORMED DOWNLINK, TEST ONTRACK & BCPM.
** GPM: 450 P: 900 - 1000 PSI
9:30 12:00 2.5 CONT'D RIH W/AUTOTRACK G3 ON 5" DP TO 3750'.
** BREACK CIRCULATION EVERY 1000
** PERFORMED DOWNLINK @ 1000 FT GPM: 450 P: 1000 PSI.
** PERFORMED DOWNLINK @ 2500 FT GPM: 450 P: 1100 PSI.
12:00 13:00 1.0 WASH DOWN LAST F/3750 FT T/3900 FT. & SEND DOWNLINK.
13:00 0:00 11.0 STARTED ROTARY DRLG W/8 1/2" AUTOTRACK G3 F/ 3900' T/ 4261'
** DRLG PARAMETERS : 400-500 GPM 120-140 RPM WOB: 25-35 KLB
** WASH UP & REAM DOWN TWICE/STD.
** DOWNLINK EVERY STAND TWICE/STD.
** SWEEP HOLE WITH 15 BBL HIGH VIS. BILL EVERY STAND.

** LAST 24 HRS LOSSES : 1.5 HR


** LAST 24 HRS FOOTAGE = 372 FT ** BIT TIME = 8.37 HRS ** AVG ROP = 45 FT/HR
** LAST SAMPLE @
** LAST SAMPLE @ 4261 FT, SALT & ANHYDRITE

**M/V MD-519 ARRIVE LOCATION @ 09:30


OFFLOAD BACKLOAD
FOOD CONTAINER ADES 3 1/2" DP
ENVIRONMENTAL SOLUTION EQUIP. ADES 4 3/4" DC
ENVRONMENTAL SOLUTION CREW. AMAPETCO SAMPLE BOTTLES
48 JTS OF 7" CSG WELL SERVICE GYRO UNIT & EQUIP.
MUD CHEMICALS EMPTY AMAL BASKET
4 EA CYLINDER RACK (ADES) AMAL-18ST RETREIVED COMPLETION ACCESSORIES
50 TONS OF DRILL WATER
100,000 LTRS OF DIESEL

TOTAL 24.0
OPERATION AFTER MIDNIGHT
0:00 6:00 6.0 ROTARY DRLG W/8 1/2" AUTOTRACK G3 F/ 4261' T/ 4450'
** DRLG PARAMETERS : 400-500 GPM 120-140 RPM WOB: 25-35 KLB
** WASH UP & REAM DOWN TWICE/STD.
** DOWNLINK EVERY STAND
** SWEEP HOLE WITH 25 BBL HIGH VIS. BILL EVERY STAND.

** LAST 6 HRS LOSSES : 1.5 BBL/HR


** LAST 6 HRS FOOTAGE = 189 FT ** BIT TIME = 4.10 HRS ** AVG ROP = 45 FT/HR
** LAST SAMPLE @ 4420 FT, SALT & ANHYDRITE

TOTAL 6.0

Rental Equipments Tracker


No. Company Description Arrival date Departure date Remarks
1 E.S. SOLID REMOVAL 3/Mar/20
2 EPHH Rig Inspection 6/Feb/20 18/Feb/20
3 SAPESCO TRS 14/Feb/20 22/Feb/20
4 Gharib Slickline 14/Feb/20 28/Feb/20
5 Schlumberger Wireline 14/Feb/20 28/Feb/20
Fishing 15/Feb/20 22/2/2020
6 Bakerhuges
Whipstock & Milling Assy. 26/Feb/20 3/Mar/20
7 Set Core RCT Cutter 14/Feb/20 21/Feb/20
8 Schlumberger Cement 22/Feb/20 27/Feb/20
9 Schlumberger Downhole 22/Feb/20 28/Feb/20
10 Bakerhuges Directional drilling 26/Feb/20
11 POSS Drilling Jars 26/Feb/20
12 WEATHERFORD Multi Circulation ByPass Sub PBL 26/Feb/20
13 PETROSERVICE Mud Logging Unit 20/Feb/20
14 Well Service Gyro Survey 24/Feb/20 03/March/2020.
UNIT PRICE, $
DESCRIPTION 12-Feb-20 13-Feb-20
OPERATING/S.BY

7" P-110, 29, BTC 800 /Jt


Wellhead and Manifold
3 1/2" tbg 900/Jt
Tubing-Completion Equipment
Down Hole Equipment (B-PLUG)
MATERIAL TANGIBLE
Casing Cementing Accessories
Mud and Chemicals
Completion Fluid (Incase of Diesel)
Cement and Additives
Bits and coreheads 20000 / Bits
Fuel (85$/bbl) including boats consumpsion 6000/DAY 1275 3825
Water Supply 500/Truck
Other Material (transportaion,inspection,
material)
DRILLING RIG
Drilling Rig rates (RIG Adm-VI) 31000 14854 31000
Catering 60/Person/Day 420 420
Extra Rig Equipment
MATERIAL INTANGIBLE
Csg.,CP & Tbg Services 1000 / Day
Fishing Operator 1200/Day
Fishing Equipmet 2000 /Day
Whipstock (Total Five Days) 67,000 /Job
Mud Logging 500/DAY
Mud Engineering 400/DAY
Cement Operator 1200/DAY

Drlg eng (450$/one Eng) + MWD(Eng. 546 $/day) 1446 /Day

RSS (AUTOTRAK ONLY) (Stby $ 4155/Day) 7850/DAY


MWD 900 / Day
Drilling MOTOR ( Stby $ 195 /Day) 136 /Cir. Hrs
LWD Tripple Combo (Stby $ 1746 /Day ) 4000 / Day
Electric Logs / Wireline Operations 100,000/Job
PBL Multi Activation Bypass Sub 350/Day
Drilling Jars 200/Day
Solid Removal Equipment & OPERATOR 1000/DAY
Casing Circulating Packer & OPERATOR 600/DAY
Well Completion ENGINEER 1200/DAY
Casing Perforations 420000
CONSULTANT (supervision) 500/DAY
COIL TUBE & LIFTING 50,000/Job
Rig Inspection 30000/Job
DOwn Hole ENGINEER (B.P. Ops) 500/day
RCT Job (RCT + EMA) 36000/Job
RCT Job (RCT + PTC) 51000 / Job
Gharib S/L 500 /Day
Other Services
AUXILIARY SERVICES
BOATS (Tug Boats & Mooring Buoy AHTS) 15000/DAY 57188 15000
Dp1 AHTS 4750/DAY 4750 4750
RIG MOVE (towing) & POSITIONING 40000/DAY 40000
SEA BED SURVEY (ROV) 15000 15000
Jetty Rental 1000/DAY 1000 1000
12000/DAY (Crew
HELLICOPTER
Change)

LOGISTIC SERVICES $

TOTAL WELL COST/ DAY $ $ 134,487 $ 55,995

CUM. WELL COST : $ $ 134,487 $ 190,482


14-Feb-20 15-Feb-20 16-Feb-20 17-Feb-20 18-Feb-20 19-Feb-20 20-Feb-20 21-Feb-20

1034

2720 2975 2295 2125 2040 2500 5100 5950


500 500

0 0 0 0 0 13562.5 31000 31000


420 1440 1440 1440 1440 1440 1300 660

1000 1000 1000 1000 1000 1000 1000 1000


1200 1200 1200 1200 1200 1200 1200 1200
2000 2000 2000 2000 2000 2000 2000 2000

400 400 400 400 400 400 400

500 500 500 500 500 500 500


30000 15000

275 275 275 275 275 275 275 275


7648
500 500 500 500 500 270 270

15000
4750 4750 4750 4750 4750 4750 4750 4750

1000 1000 1000 1000 1000 1000 1000 1000

8000 12000

$ 36,365 $ 16,040 $ 15,860 $ 15,190 $ 57,105 $ 44,128 $ 57,977 $ 49,005


$ 226,847 $ 242,887 $ 258,747 $ 273,937 $ 331,042 $ 375,169 $ 433,146 $ 482,151
22-Feb-20 23-Feb-20 24-Feb-20 25-Feb-20 26-Feb-20 27-Feb-20 28-Feb-20 29-Feb-20

8750

1174 0 492 13996 582 1630 1492

40000
20000
5950 6630 2805 2805 5100 4675 4675 4675

31000 31000 31000 31000 31000 31000 31000 31000


600 660 660 660 660 1200 1000 1000

1000
1200 1200 1200
2000 2000 2000 2000 2000

500 500 500 500 500


400 400 400 400 400 400 400 400
1200 1200 1200 1200 1200 1200 1200

1466 1466

4155 4155
900 900
195 195

40000
350 350
200 200

500 500 500 500 500 500 500 500


500 500 500 500 500 500 500 500

270 270 270 270 270 270

4750 4750 4750 4750 4750 4750 4750 4750

1000 1000 1000 1000 1000 1000 1000 1000

12000

$ 51,544 $ 48,910 $ 45,577 $ 46,785 $ 115,076 $ 95,327 $ 74,421 $ 53,083


$ 533,695 $ 582,605 $ 628,182 $ 674,967 $ 790,043 $ 885,370 $ 959,791 ###
1-Mar-20 2-Mar-20 3-Mar-20 4-Mar-20 5-Mar-20 6-Mar-20 7-Mar-20

1364 266 7000

4845 4675 6205

31000 31000 31000


1000 1000 1200

67000
500 500 500
400 400 400

1466 1466 1466

4155 4155 7850


900 900 900
2877.76 1020 190
1750 1460 4000

350 350 350


200 200 200
1000

500 500 500


500 500 500

4750 4750 4750

1000 1000 1000

12000

$ 124,558 $ 54,142 $ 81,011 $ - $ - $ - $ -


$ 1,137,432 $ 1,191,574 $ 1,272,585 $ 1,272,585 ### ### ###
8-Mar-20 9-Mar-20 10-Mar-20 11-Mar-20 12-Mar-20 13-Mar-20 14-Mar-20 15-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
16-Mar-20 17-Mar-20 18-Mar-20 19-Mar-20 20-Mar-20 21-Mar-20 22-Mar-20 23-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
24-Mar-20 25-Mar-20 26-Mar-20 27-Mar-20 28-Mar-20 29-Mar-20 30-Mar-20 31-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
1-Apr-20 2-Apr-20 3-Apr-20 4-Apr-20 5-Apr-20 6-Apr-20 7-Apr-20 8-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
9-Apr-20 10-Apr-20 11-Apr-20 12-Apr-20 13-Apr-20 14-Apr-20 15-Apr-20 16-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
17-Apr-20 18-Apr-20 19-Apr-20 20-Apr-20 21-Apr-20 22-Apr-20 23-Apr-20 24-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
25-Apr-20 26-Apr-20 27-Apr-20 28-Apr-20 29-Apr-20 30-Apr-20 1-May-20 2-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
3-May-20 4-May-20 5-May-20 6-May-20 7-May-20 8-May-20 9-May-20 10-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
11-May-20 12-May-20 13-May-20 14-May-20 15-May-20 16-May-20 17-May-20 18-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
19-May-20 20-May-20 21-May-20 22-May-20
$ - $ - $ - $ -
### ### ### ###