28-Feb-20 No: 17
GENERAL DATAINFORMATION:
Rig Name: ADM-6 DRLG SUPV. Mohamed Hashem Water Depth: 77 ONHIRE DAYS: 16.52
Well Name: AMAL-18 STA Night DRLG. Mohamed Saber RKB-MSL: MOVING: 1.52
Location: Gulf Of Suez DRLG ENG RKB-SEA BED: PLANNED DAYS: 48
Field: AMAL FIELD PET. ENG RKB-THF: 54 FT TODAY NPT, HR:
PLATFORM: AMAL-B PLANNED TD: 10242 FT Cumulative NPT, hrs: 6
06:00 Status: DRILLING RAT HOLE W/ 8 1/8" MILLING ASSY. T/ 3480 FT. Daily Cost, USD: $ 48,205
RIH WITH GAUGE RUN ASSY. F/1250' T/3472', TAG ON B.PLUG W/30 KLBS, POOH, P/U , M/U & RIH WITH
24Hs Summary:
WHIPSTOCK ASSY. ADJUST ORIENTATION WITH GYRO. SET SAME. OPENED 9 5/8" CSG WINDOW F/ 3450' T/ Cum. Cost, USD: $ 928,371
till 00:00
3459'
CONT. MILLING 9 5/8" CSG WINDOE TO/ 3468', DRLG 22 FT RAT-HOLE, POOH TO SURFACE. CHECK & REVIEW
24Hs plan: A.F.E: MM $6.00
BHA GAUGING
HSE:
Trip Drill: Sour Gas: Fire Drill: 16/02/2020 Days Free Since LTA
Kick Drill: Rig Evac: M O B: LAST BOP TEST
Drills run Today: STOP CARDS First aid Cases: H2S Drill 21/02/2020
BHA
BHA Number: Length (ft): BHA Wt: Wt. below jar IN MUD: JAR S/N:
Jar in hole (hrs)
** BHA # 5: (8 3/8" ANCHOR + 8 1/8" WHIPSTOCK GUIDE + 8 1/2" WINDOW MILL + 8 1/4" LOWER WATER MILLON CIRC. SUB S/N:
Components
MILL + FLEX JOINT + 8 1/2" UPPER WATER MILLON + 5" HWDP + 6 1/2" UBHO 8 JTS OF 6 1/2" DC + 22 JTS OF 5" HWDP)
CIRC. SUB HR:
Run Number: Mud sys: WBM Last Csg TVD (ft): On Btm Torque, kft.lb
Type: Mud type: SSM FIT/LOT (EMW): P/U - S/O- ROT WT.S (klbs):
IADC Code: FLOW LINE TEMP, F 90 current mud wt. Motor RPM
Manufacturer: DEPTH 3460 MAASP (psi): 0 Wt on Bit (klbs):
Size (in.): MUD WT - PPG 10.20 Last BOP Test: Surface RPM:
Serial No: F. VIS.- SEC/Q 47 SCR Pump Information:
Nozzles: RPM 6 DEPTH: Pump PumpLiner Strokes Circ. Rate
TFA : RPM 3 time: Number bore(in) Ln(in) SPM (gpm)
BIT FOOTAGE PV - CP 16 SPM: 1
Last Run date: YP - lb/100ft2 22 Pump1 -psi 2
total on-btm(hrs) GEL 10S - lb/100ft2 10 Pump2 -psi Stand-Pipe (psi):
TOTAL FOTAGE: GEL 10M - lb/100ft2 13 Pump3 -psi Flowrate (gpm):
current run depth: API FILTRATE HPHT Directional Survey Information:
Today on-btm hrs: CAKE API/HTHP- 1/32 MD Angle AZI TVD Vertical Coordinates DLS
Today footage: SAND % (FT) (°) (°) (FT) Sect. FT N/S E/W O
/100 FT
Today ROP (on btm) SOLIDS %
TOTAL on-btm(HRS)
1of2
Page 2/2 DAILY DRILLING REPORT
28/Feb/20 No: 17
Geology Information:
Formation Top in program Actual Formation Top in program Actual
Lithology Lithology
Name: MD/TVDSS MD/TVDSS Name: MD/TVDSS MD/TVDSS
S.Gharib BELAYIM
KAREEM RUDIES
Personnel ON BOARD
Company No. of people Company No. of people
Amapetco 3 Mud logging Petro-service 4
EPHH 0 ADES Service 1
Amapetco Field 4 SLB W/L 0
SLB Cement 0 SLB Downhole 0
RIG ADM-6 45 Gharib S/L 0
Catering 14 Baker Fishing 1
Baker Mud 1 WELL SERVICE GYRO 3
DIRECTIONAL & MWD BAKER 4 TOTAL ON BOARD 80
Time (hh:mm)
OPERATIONS
From To Hrs
0:00 2:30 2.5 CONT'D RIH WITH GAUGE RUN ASSY. F/1250' T/3472', TAGGED B.PLUG & SLACKED OFF 30KLB. OK & RECORD FREE PARAMETERS AS
FOLLOW:
** PICK UP WT = 150 KLB ** SLACK OFF WT =136 KLB *8 FREE TORQUE = 4.3 @ 80, 90 & 100 RPM ** ROT. WT = 143KLB.
2:30 6:00 3.5 POOH W/ 8 1/2" GAUGE RUN ASSY. TO SURFACE
6:00 10:00 4.0 P/U & M/U WHIPSTOCK AND MILLING ASSY. P/U UBHO & AJUST ORIENTATION.
** BHA # 5: (8 3/8" ANCHOR + 8 1/8" WHIPSTOCK GUIDE + 8 1/2" WINDOW MILL + 8 1/4" LOWER WATER MILLON MILL + FLEX JOINT +
8 1/2" UPPER WATER MILLON + 5" HWDP + 6 1/2" UBHO 8 JTS OF 6 1/2" DC + 22 JTS OF 5" HWDP)
10:00 13:00 3.0 RIH W/ 8 1/8" WHIPSTOCK & MILLING ASSY. ON 5" DP. TAG ON 9 5/8" BP @ 3442 FT.
** RUNNING SPEED (1 STD/ 4 MIN) ** DRIFT EVERY STD BEFORE RIH.
** AVOID ROTATION OR JERKING WHILE RIH.
R/U GYRO E/L & SURVEY THE TOOL FACE WITH THE UBHO GYRO SUB, ORIENTED THE WHIPSTOCK TOOL FACE. POOH & R/D SAME FOR
13:00 15:30 2.5 GYRO TOOLS.
** MODEL: GYRO NORTH SEEKING SOLID STATE SPT SERIAL NO: 1942 CAL. DATE: 03/12/2020
SURVEY REPORT: SURVEY DEPTH: 3442 FT AZI: 40.2 TF: 312.8
15:30 16:00 0.5 SETTING OF WHIPSTOCK.
** APPLIED 20 KLBS S/W, SET BTM TRIP ANCHOR.
** APPLIED 50 KLBS, SHEAR THE BOLT HOLDING THE WHIPSTOCK TO THE ANCHOR.
16:00 17:00 1.0 DISPLACE HOLE FROM 9.0 PPG BRINE TO SSM ( MW: 10.2 PPG SALINITY: 189,000)
17:00 0:00 7.0 CONT'D MILLING 9 5/8" CSG WINDOW W/ 8 1/2" WINDOW MILL F/ 3450.7' T/ 3459' AS FOLLOW:
** PUMP RATE : 430 GPM ** PUMP PRESSURE : 650 PSI ** TORQUE : 8-14 KLB.FT
TOTAL 24.0
OPERATION AFTER MIDNIGHT
0:00 4:00 6.0 CONT'D MILLING 9 5/8" CASING WINDOW W/ 8 1/2" WINDOW MILL F/ 3459' T/ 3468' AS FOLLOW:
** PUMP RATE : 400 - 450 GPM ** PUMP PRESSURE : 650 PSI ** TORQUE : 8-14 KLB.FT
4:00 6:00 2.0 DRILLING OF RAT HOLE W/ 8 1/8" MILLING ASSY. F/3468' TO 3480 FT.
** PUMP RATE : 400 - 450 GPM ** PUMP PRESSURE : 650 PSI ** TORQUE : 3 - 5 KLB.FT
LAST SAMPLE: METAL DEBRIS , ANHYDRITE , CACO3 & SALT.
TOTAL 6.0
LOGISTIC SERVICES $
1034
15000
4750 4750 4750 4750 4750 4750 4750 4750
4000 4000
8000 12000
8750
40000
1000
1200
2000
40000
350
200