Page 1/2 DAILY DRILLING REPORT

28-Feb-20 No: 17

GENERAL DATAINFORMATION:
Rig Name: ADM-6 DRLG SUPV. Mohamed Hashem Water Depth: 77 ONHIRE DAYS: 16.52
Well Name: AMAL-18 STA Night DRLG. Mohamed Saber RKB-MSL: MOVING: 1.52
Location: Gulf Of Suez DRLG ENG RKB-SEA BED: PLANNED DAYS: 48
Field: AMAL FIELD PET. ENG RKB-THF: 54 FT TODAY NPT, HR:
PLATFORM: AMAL-B PLANNED TD: 10242 FT Cumulative NPT, hrs: 6
06:00 Status: DRILLING RAT HOLE W/ 8 1/8" MILLING ASSY. T/ 3480 FT. Daily Cost, USD: $ 48,205

RIH WITH GAUGE RUN ASSY. F/1250' T/3472', TAG ON B.PLUG W/30 KLBS, POOH, P/U , M/U & RIH WITH
24Hs Summary:
WHIPSTOCK ASSY. ADJUST ORIENTATION WITH GYRO. SET SAME. OPENED 9 5/8" CSG WINDOW F/ 3450' T/ Cum. Cost, USD: $ 928,371
till 00:00
3459'

CONT. MILLING 9 5/8" CSG WINDOE TO/ 3468', DRLG 22 FT RAT-HOLE, POOH TO SURFACE. CHECK & REVIEW
24Hs plan: A.F.E: MM $6.00
BHA GAUGING

HSE:
Trip Drill: Sour Gas: Fire Drill: 16/02/2020 Days Free Since LTA
Kick Drill: Rig Evac: M O B: LAST BOP TEST
Drills run Today: STOP CARDS First aid Cases: H2S Drill 21/02/2020
BHA
BHA Number: Length (ft): BHA Wt: Wt. below jar IN MUD: JAR S/N:
Jar in hole (hrs)
** BHA # 5: (8 3/8" ANCHOR + 8 1/8" WHIPSTOCK GUIDE + 8 1/2" WINDOW MILL + 8 1/4" LOWER WATER MILLON CIRC. SUB S/N:
Components
MILL + FLEX JOINT + 8 1/2" UPPER WATER MILLON + 5" HWDP + 6 1/2" UBHO 8 JTS OF 6 1/2" DC + 22 JTS OF 5" HWDP)
CIRC. SUB HR:

BIT INFORMATION MUD Information WellControl: Drilling Information


Bit Number: TEST TIME: Last Csg Depth MD(ft): Off Btm Torque, kft.lb

Run Number: Mud sys: WBM Last Csg TVD (ft): On Btm Torque, kft.lb
Type: Mud type: SSM FIT/LOT (EMW): P/U - S/O- ROT WT.S (klbs):
IADC Code: FLOW LINE TEMP, F 90 current mud wt. Motor RPM
Manufacturer: DEPTH 3460 MAASP (psi): 0 Wt on Bit (klbs):
Size (in.): MUD WT - PPG 10.20 Last BOP Test: Surface RPM:
Serial No: F. VIS.- SEC/Q 47 SCR Pump Information:
Nozzles: RPM 6 DEPTH: Pump PumpLiner Strokes Circ. Rate
TFA : RPM 3 time: Number bore(in) Ln(in) SPM (gpm)
BIT FOOTAGE PV - CP 16 SPM: 1
Last Run date: YP - lb/100ft2 22 Pump1 -psi 2
total on-btm(hrs) GEL 10S - lb/100ft2 10 Pump2 -psi Stand-Pipe (psi):
TOTAL FOTAGE: GEL 10M - lb/100ft2 13 Pump3 -psi Flowrate (gpm):
current run depth: API FILTRATE HPHT Directional Survey Information:
Today on-btm hrs: CAKE API/HTHP- 1/32 MD Angle AZI TVD Vertical Coordinates DLS
Today footage: SAND % (FT) (°) (°) (FT) Sect. FT N/S E/W O
/100 FT
Today ROP (on btm) SOLIDS %
TOTAL on-btm(HRS)

TOTAL footage (FT) OIL %

Total ROP (on btm) SALINITY 188000

DULL GRADING WATER %


Inner Rows: MP-CCs H2SO4
Outer Rows: O/W %
Dull Charac.: CL-Whole Mud - ppm
Location: WPS (CaCl2)-Mg/L
Bearing Seals: MBT 35
Gauge: Stability - Volts
Other Dull: KCL %
Reason Pulled:
CONSUMABLES
PRODUCT PREV. BBLS RCVD. BBLS USED BBLS TODAY BBLS USABLE REQUIRED
P/ WATER, BBL 510 50 80 480 0
D/ WATER, BBL 257 0 200 57 0
DIESEL, BBL 596 0 51 545 325
BULK MATERIAL
PRODUCT PREV. RCVD. USED TODAY (CU.FT) TODAY (SACKS) TODAY (MT)
CEMENT G-NEAT #1 800 0 800 800.00 34.2
CEMENT G-NEAT #2 0 0 0 0.00 0.0
CEMENT G-NEAT #3 0 0 0 0.00 0.0
BARITE #1, CU.FT 0 0 0 0.00 0.0
BARITE #2, CU.FT 0 0 0 0.00 0.0
BARITE #3, CU.FT 0 0 0 0.00 0.0

1of2
Page 2/2 DAILY DRILLING REPORT
28/Feb/20 No: 17

Geology Information:
Formation Top in program Actual Formation Top in program Actual
Lithology Lithology
Name: MD/TVDSS MD/TVDSS Name: MD/TVDSS MD/TVDSS
S.Gharib BELAYIM
KAREEM RUDIES

Personnel ON BOARD
Company No. of people Company No. of people
Amapetco 3 Mud logging Petro-service 4
EPHH 0 ADES Service 1
Amapetco Field 4 SLB W/L 0
SLB Cement 0 SLB Downhole 0
RIG ADM-6 45 Gharib S/L 0
Catering 14 Baker Fishing 1
Baker Mud 1 WELL SERVICE GYRO 3
DIRECTIONAL & MWD BAKER 4 TOTAL ON BOARD 80
Time (hh:mm)
OPERATIONS
From To Hrs

0:00 2:30 2.5 CONT'D RIH WITH GAUGE RUN ASSY. F/1250' T/3472', TAGGED B.PLUG & SLACKED OFF 30KLB. OK & RECORD FREE PARAMETERS AS
FOLLOW:
** PICK UP WT = 150 KLB ** SLACK OFF WT =136 KLB *8 FREE TORQUE = 4.3 @ 80, 90 & 100 RPM ** ROT. WT = 143KLB.
2:30 6:00 3.5 POOH W/ 8 1/2" GAUGE RUN ASSY. TO SURFACE
6:00 10:00 4.0 P/U & M/U WHIPSTOCK AND MILLING ASSY. P/U UBHO & AJUST ORIENTATION.
** BHA # 5: (8 3/8" ANCHOR + 8 1/8" WHIPSTOCK GUIDE + 8 1/2" WINDOW MILL + 8 1/4" LOWER WATER MILLON MILL + FLEX JOINT +
8 1/2" UPPER WATER MILLON + 5" HWDP + 6 1/2" UBHO 8 JTS OF 6 1/2" DC + 22 JTS OF 5" HWDP)
10:00 13:00 3.0 RIH W/ 8 1/8" WHIPSTOCK & MILLING ASSY. ON 5" DP. TAG ON 9 5/8" BP @ 3442 FT.
** RUNNING SPEED (1 STD/ 4 MIN) ** DRIFT EVERY STD BEFORE RIH.
** AVOID ROTATION OR JERKING WHILE RIH.
R/U GYRO E/L & SURVEY THE TOOL FACE WITH THE UBHO GYRO SUB, ORIENTED THE WHIPSTOCK TOOL FACE. POOH & R/D SAME FOR
13:00 15:30 2.5 GYRO TOOLS.

** MODEL: GYRO NORTH SEEKING SOLID STATE SPT SERIAL NO: 1942 CAL. DATE: 03/12/2020
SURVEY REPORT: SURVEY DEPTH: 3442 FT AZI: 40.2 TF: 312.8
15:30 16:00 0.5 SETTING OF WHIPSTOCK.
** APPLIED 20 KLBS S/W, SET BTM TRIP ANCHOR.
** APPLIED 50 KLBS, SHEAR THE BOLT HOLDING THE WHIPSTOCK TO THE ANCHOR.
16:00 17:00 1.0 DISPLACE HOLE FROM 9.0 PPG BRINE TO SSM ( MW: 10.2 PPG SALINITY: 189,000)
17:00 0:00 7.0 CONT'D MILLING 9 5/8" CSG WINDOW W/ 8 1/2" WINDOW MILL F/ 3450.7' T/ 3459' AS FOLLOW:
** PUMP RATE : 430 GPM ** PUMP PRESSURE : 650 PSI ** TORQUE : 8-14 KLB.FT

**M/V MD-519 ARRIVE LOCATION @ 18:30


OFFLOAD BACKLOAD
6 3/4" WEATHERFORD BBL SUB (WITH BACK-UP)
6 1/2" BOSS HYRAULIC JAR (WITH BACK-UP)
1* 8 1/2" PDC BIT (BAKER HUGHES)
1 * 8 1/2" MILL-TOOTH BIT

TOTAL 24.0
OPERATION AFTER MIDNIGHT
0:00 4:00 6.0 CONT'D MILLING 9 5/8" CASING WINDOW W/ 8 1/2" WINDOW MILL F/ 3459' T/ 3468' AS FOLLOW:
** PUMP RATE : 400 - 450 GPM ** PUMP PRESSURE : 650 PSI ** TORQUE : 8-14 KLB.FT

4:00 6:00 2.0 DRILLING OF RAT HOLE W/ 8 1/8" MILLING ASSY. F/3468' TO 3480 FT.
** PUMP RATE : 400 - 450 GPM ** PUMP PRESSURE : 650 PSI ** TORQUE : 3 - 5 KLB.FT
LAST SAMPLE: METAL DEBRIS , ANHYDRITE , CACO3 & SALT.

TOTAL 6.0

Rental Equipments Onboard


No. Company Description Arrival date Departure date Remarks
1 MMSS Rig positioning 3/Feb/20 14/Feb/20
2 EPHH Rig Inspection 6/Feb/20 18/Feb/20
3 SAPESCO TRS 14/Feb/20 22/Feb/20
4 Gharib Slickline 14/Feb/20 28/Feb/20
5 Schlumberger Wireline 14/Feb/20 28/Feb/20
Fishing 15/Feb/20 22/2/2020
6 Bakerhuges
Whipstock & Milling Assy. 26/Feb/20
7 Set Core RCT Cutter 14/Feb/20 21/Feb/20
8 Schlumberger Cement 22/Feb/20 27/Feb/20
9 Schlumberger Downhole 22/Feb/20 28/Feb/20
UNIT PRICE, $
DESCRIPTION 12-Feb-20 13-Feb-20
OPERATING/S.BY

7" P-110, 29, BTC 800 /Jt


Wellhead and Manifold
3 1/2" tbg 900/Jt
Tubing-Completion Equipment
Down Hole Equipment (B-PLUG)
MATERIAL TANGIBLE
Casing Cementing Accessories
Mud and Chemicals
Completion Fluid (Incase of Diesel)
Cement and Additives
Bits and coreheads 20000 / Bits
Fuel (85$/bbl) including boats consumpsion 6000/DAY 1275 3825
Water Supply 500/Truck
Other Material (transportaion,inspection,
material)
DRILLING RIG
Drilling Rig rates (RIG Adm-VI) 31000 14854 31000
Catering 60/Person/Day 420 420
Extra Rig Equipment
MATERIAL INTANGIBLE
Csg.,CP & Tbg Services 1000 / Day
Fishing Operator 1200/Day
Fishing Equipmet 2000 /Day
Whipstock (Total Five Days) 65,000 /Job
Mud Logging 500/DAY
Mud Engineering 400/DAY
Cement Operator 1200/DAY

Drlg eng (450$/one Eng) + MWD(Eng. 546 $/day) 1446 /Day

RSS (AUTOTRAK ONLY) (Stby $ 4155/Day) 7850/DAY


MWD 900 / Day
Drilling MOTOR ( Stby $ 195 /Day) 136 /Cir. Hrs
LWD Tripple Combo (Stby $ 1746 /Day ) 4000 / Day
Electric Logs / Wireline Operations 100,000/Job 35000
PBL Multi Activation Bypass Sub 350/Day
Drilling Jars 200/Day
Solid Removal Equipment & OPERATOR 1000/DAY
Casing Circulating Packer & OPERATOR 600/DAY
Well Completion ENGINEER 1200/DAY
Casing Perforations 420000
CONSULTANT (supervision) 1000/DAY
COIL TUBE & LIFTING 50,000/Job
Rig Inspection 30000/Job
DOwn Hole ENGINEER (B.P. Ops) 500/day
RCT Job (RCT + EMA) 36000/Job
RCT Job (RCT + PTC) 51000 / Job
Gharib S/L 500 /Day
Other Services
AUXILIARY SERVICES
BOATS (Tug Boats & Mooring Buoy AHTS) 15000/DAY 57188 15000
Dp1 AHTS 4750/DAY 4750 4750
RIG MOVE (towing) & POSITIONING 4000/DAY 4000 4000
SEA BED SURVEY (ROV) 15000 15000
Jetty Rental 1000/DAY 1000 1000
12000/DAY (Crew
HELLICOPTER
Change)

LOGISTIC SERVICES $

TOTAL WELL COST/ DAY $ $ 98,487 $ 94,995

CUM. WELL COST : $ $ 98,487 $ 193,482


14-Feb-20 15-Feb-20 16-Feb-20 17-Feb-20 18-Feb-20 19-Feb-20 20-Feb-20 21-Feb-20

1034

2720 2975 2295 2125 2040 2500 5100 5950


500 500

0 0 0 0 0 13562.5 31000 31000


420 1440 1440 1440 1440 1440 1300 660

1000 1000 1000 1000 1000 1000 1000 1000


1200 1200 1200 1200 1200 1200 1200 1200
2000 2000 2000 2000 2000 2000 2000 2000

400 400 400 400 400 400 400

1000 1000 1000 1000 1000 1000 1000


30000 30000

275 275 275 275 275 275 275 275


7648
500 500 500 500 500 270 270

15000
4750 4750 4750 4750 4750 4750 4750 4750
4000 4000

1000 1000 1000 1000 1000 1000 1000 1000

8000 12000

$ 40,365 $ 20,540 $ 16,360 $ 15,690 $ 57,605 $ 59,628 $ 58,477 $ 49,505


$ 233,847 $ 254,387 $ 270,747 $ 286,437 $ 344,042 $ 403,669 $ 462,146 $ 511,651
22-Feb-20 23-Feb-20 24-Feb-20 25-Feb-20 26-Feb-20 27-Feb-20 28-Feb-20 29-Feb-20

8750

1174 0 492 493 494 582 1630

40000

5950 6630 2805 2805 2805 4675 4675

31000 31000 31000 31000 31000 31000 31000


600 660 660 660 660 1200 1000

1000
1200
2000

500 500 500 500


400 400 400 400 400 400 400
1200 1200 1200 1200 1200 1200 1200

40000
350
200

1000 1000 1000 1000 1000 1000 1000


500 500 500 500 500 500 500

270 270 270 270 270 270

4750 4750 4750 4750 4750 4750 4750

1000 1000 1000 1000 1000 1000 1000

$ 52,044 $ 47,410 $ 44,077 $ 44,578 $ 84,579 $ 95,827 $ 48,205 $ -


$ 563,695 $ 611,105 $ 655,182 $ 699,760 $ 784,339 $ 880,166 $ 928,371 $ 928,371
1-Mar-20 2-Mar-20 3-Mar-20 4-Mar-20 5-Mar-20 6-Mar-20 7-Mar-20 8-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
9-Mar-20 10-Mar-20 11-Mar-20 12-Mar-20 13-Mar-20 14-Mar-20 15-Mar-20 16-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
17-Mar-20 18-Mar-20 19-Mar-20 20-Mar-20 21-Mar-20 22-Mar-20 23-Mar-20 24-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
25-Mar-20 26-Mar-20 27-Mar-20 28-Mar-20 29-Mar-20 30-Mar-20 31-Mar-20 1-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
2-Apr-20 3-Apr-20 4-Apr-20 5-Apr-20 6-Apr-20 7-Apr-20 8-Apr-20 9-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
10-Apr-20 11-Apr-20 12-Apr-20 13-Apr-20 14-Apr-20 15-Apr-20 16-Apr-20 17-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
18-Apr-20 19-Apr-20 20-Apr-20 21-Apr-20 22-Apr-20 23-Apr-20 24-Apr-20 25-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
26-Apr-20 27-Apr-20 28-Apr-20 29-Apr-20 30-Apr-20 1-May-20 2-May-20 3-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
4-May-20 5-May-20 6-May-20 7-May-20 8-May-20 9-May-20 10-May-20 11-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
12-May-20 13-May-20 14-May-20 15-May-20 16-May-20 17-May-20 18-May-20 19-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371 $ 928,371
20-May-20 21-May-20 22-May-20
$ - $ - $ -
$ 928,371 $ 928,371 $ 928,371

You might also like