Amal-18 Sta DDR#22 04-03-2020
Amal-18 Sta DDR#22 04-03-2020
4-Mar-20 No: 22
GENERAL DATAINFORMATION:
Rig Name: ADM-6 DRLG SUPV. MOHAMED HASHEM Water Depth: 77 ONHIRE DAYS: 21.52
Well Name: AMAL-18 STA Night DRLG. MOHAMED SABER RKB-MSL: 95.3 MOVING: 1.52
Location: Gulf Of Suez DRLG ENG ISLAM BADR RKB-THF: 57.5 FT PLANNED DAYS: 48
Field: AMAL FIELD PET. ENG PLANNED TD: 10242 FT TODAY NPT, HR:
PLATFORM: AMAL-B SPUD DATE 29/02/2020 Cumulative NPT, hrs: 6
06:00 Status: CONT'D ROTARY DRLG W/8 1/2" AUTOTRACK G3 T/ 5065' Daily Cost, USD: $ 63,741
24Hs Summary:
till 00:00 CONT'D ROTARY DRLG W/8 1/2" AUTOTRACK G3 F/ 4261' T/ 4905' Cum. Cost, USD: $ 1,348,326
24Hs plan: CONTINUE ROTARY DRLG W/8 1/2" AUTOTRACK G3 A.F.E: MM $6.00
HSE:
Trip Drill: Sour Gas: Fire Drill: 16/02/2020 Days Free Since LTA
Kick Drill: Rig Evac: M O B: LAST BOP TEST 20/02/2020
Drills run Today: STOP CARDS First aid Cases: H2S Drill 21/02/2020
BHA
BHA Number: 7 Length (ft): BHA Wt: 48.00 Wt. below jar IN MUD: 12 KLBS JAR S/N: DJ 10-650-60
Jar in hole (hrs) 98
Components
** BHA #7 : ( 8 1/2" PDC BIT + ATK STEERABLE + 6 3/8" FLEX SUB + 6 3/4" ON-TRACK-STOP + 6 3/4" BCPM + 6 3/4" NM STOP-SUB + 6 CIRC. SUB S/N: 34
3/4" STAB. + 6 3/2" FLOAT-SUB + 6 3/8" BPL+ 6 X 6 1/2" DC + 6 1/2" JAR + 3 X 6 1/2" DC + 24/5" HWDP).
CIRC. SUB HR: 22
Run Number: 3 Mud sys: WBM Last Csg TVD (ft): Motor RPG
Type: PDC Mud type: SSM FIT/LOT (EMW): P/U - S/O- ROT WT.S (klbs):
IADC Code: M223 FLOW LINE TEMP, F 90 current mud wt. Motor RPM
Size (in.): 8 1/2" MUD WT - PPG 10.30 Last BOP Test: Surface RPM:
Serial No: 5300526 F. VIS.- SEC/Q 47 SCR Pump Information:
Nozzles: 6 * 13 RPM 6 10 DEPTH: Pump PumpLiner Strokes Circ. Rate
TFA : RPM 3 8 time: Number bore(in) Ln(in) SPM (gpm)
BIT FOOTAGE PV - CP 17 SPM: 1
Last Run date: 2/3/2020 YP - lb/100ft2 25 Pump1 -psi 2
total on-btm(hrs) 27.38 GEL 10S - lb/100ft2 10 Pump2 -psi Stand-Pipe (psi):
TOTAL FOTAGE: 1016.0 GEL 10M - lb/100ft2 14 Pump3 -psi Flowrate (gpm):
current run depth: 3900 API FILTRATE HPHT Directional Survey Information:
Today on-btm hrs: 19.01 CAKE API/HTHP- 1/32 MD Angle AZI TVD Vertical Coordinates DLS
Today footage: 644.0 SAND % 3697.00 27.24 26.41 3644.65 128.55 867864.42 599002.22 1.47
Today ROP (on btm) 35.0 SOLIDS % 3845 26.95 24.41 3776 192.17 867873.24 599020.79 0.65
PH 9 3945.00 26.67 25.10 3865.66 234.57 867879.00 599033.28 0.42
OIL % 4039.00 26.66 27.20 3949.66 274.56 867884.68 599044.83 1.00
SALINITY 170000 4133.00 25.72 29.61 4034.02 314.37 867890.69 599055.96 1.51
DULL GRADING WATER % 4228.00 25.52 29.66 4119.67 354.04 867896.89 599066.86 0.21
Inner Rows: MP-CCs H2SO4 4322.00 26.72 33.11 4204.08 394.3 867903.46 599077.62 2.06
Outer Rows: O/W % 4416.00 27.59 36.75 4287.72 436.57 867910.96 599088.34 1.99
Dull Charac.: CL-Whole Mud - ppm 4510 28.1 39.53 4370.84 480.17 867919.23 599098.87 1.48
Location: WPS (CaCl2)-Mg/L 4603.00 28.99 42.87 4452.54 524.52 867928.16 599109.07 1.96
Bearing Seals: MBT 30 4697.00 28.98 38.20 4534.78 569.92 867937.18 599119.62 2.41
Gauge: Stability - Volts 4792.00 30.09 38.24 4617.43 616.45 867946.02 599130.84 1.17
Other Dull: KCL % 4887.00 31.24 38.15 4699.15 664.59 867955.16 599142.46 1.21
Reason Pulled: 4983.00 32.02 37.79 4780.89 714.69 867964.61 599154.56 0.84
CONSUMABLES
PRODUCT PREV. BBLS RCVD. BBLS USED BBLS TODAY BBLS USABLE REQUIRED
P/ WATER, BBL 490 80 80 490 0
D/ WATER, BBL 57 314 0 371
DIESEL, BBL 919 144 73 990 770
BULK MATERIAL
PRODUCT PREV. RCVD. USED TODAY (CU.FT) TODAY (SACKS) TODAY (MT)
CEMENT G-NEAT #1 800 442 358 358.00 15.3
CEMENT G-NEAT #2 0 0 0 0.00 0.0
CEMENT G-NEAT #3 0 0 0 0.00 0.0
BARITE #1, CU.FT 56 0 7 49 66.22 3.0
BARITE #2, CU.FT 0 0 0 0.00 0.0
BARITE #3, CU.FT 0 0 0 0.00 0.0
1of2
Page 2/2 DAILY DRILLING REPORT
4/Mar/20 No: 22
Geology Information:
Formation Top in program Actual Formation Top in program Actual
Lithology Lithology
Name: MD/TVDSS MD/TVDSS Name: MD/TVDSS MD/TVDSS
S.Gharib ANHYDRITE, SALT & SHALE BELAYIM
KAREEM RUDIES
Personnel ON BOARD
Company No. of people Company No. of people
Amapetco 5 Mud logging Petro-service 4
ENVIRONMENTAL SOLUTION 4 ADES Service 1
Amapetco Field 5 SLB W/L 0
EVACO 2 SLB Downhole 0
RIG ADM-6 47 Gharib S/L 0
Catering 14 Baker Fishing 0
Baker Mud 1 WELL SERVICE GYRO 0
DIRECTIONAL & MWD BAKER 4 TOTAL ON BOARD 87
Time (hh:mm)
OPERATIONS
From To Hrs
0:00 0:00 24.0 CONT'D ROTARY DRLG W/8 1/2" AUTOTRACK G3 F/ 4261' T/ 4905'
** DRLG PARAMETERS : 400-450 GPM 120-140 RPM WOB: 5-10 KLB
** WASH UP & REAM DOWN /STD.
** DOWNLINK EVERY STAND
** SWEEP HOLE WITH 25 BBL HIGH VIS. BILL EVERY STAND.
TOTAL 24.0
OPERATION AFTER MIDNIGHT
0:00 6:00 6.0 ROTARY DRLG W/8 1/2" AUTOTRACK G3 F/ 4905' T/ 5065'
** DRLG PARAMETERS : 400-450 GPM 120-140 RPM WOB: 5-10 KLB
** WASH UP & REAM DOWN /STD.
** DOWNLINK EVERY STAND
** SWEEP HOLE WITH 25 BBL HIGH VIS. BILL EVERY STAND.
TOTAL 6.0
LOGISTIC SERVICES $
1034
15000
4750 4750 4750 4750 4750 4750 4750 4750
8000 12000
8750
40000
32000
5950 6630 2805 2805 5100 4675 4675 4675
1000
1200 1200 1200
2000 2000 2000 2000 2000
1466 1466
4155 4155
900 900
195 195
40000
350 350
200 200
12000
67000
500 500 500 500
400 400 400 400
12000