7-Mar-20 No: 25
GENERAL DATAINFORMATION:
Rig Name: ADM-6 DRLG SUPV. MOHAMED HASHEM Water Depth: 77 ONHIRE DAYS: 24.52
Well Name: AMAL-18 STA Night DRLG. MOHAMED SABER RKB-MSL: 95.3 MOVING: 1.52
Location: Gulf Of Suez DRLG ENG ISLAM BADR RKB-THF: 57.5 FT PLANNED DAYS: 48
Field: AMAL FIELD PET. ENG PLANNED TD: 10242 FT TODAY NPT, HR:
PLATFORM: AMAL-B SPUD DATE 29/02/2020 Cumulative NPT, hrs: 6
06:00 Status: SWEEP HOLE WITH TANDEM PILL (50 BBL LO-SAL + 50 HI-VIS), CIRCULATE TILL HAD SHAKER CLEAN. Daily Cost, USD: $ 86,753
24Hs Summary: till M/U & RIH W/ 8 1/2" RSS ASSY. (BHA #7) , PERFORMED SURFACE VERIFICATION ELECTRONIC TEST & SURFACE PRESSURE TEST ON
Cum. Cost, USD: $ 1,562,186
00:00 AUTOTRACK AND ONTRACK EQUIP, RIH W/ 8 1/2" RSS ASSY. (BHA #7) T/5429', TAG ON BTM, CONT'D DRLG OF 8 1/2" HOLE TO 5990'.
DRLG OF 8 1/2" HOLE FROM 5990' TO 6150' (BASE OF S.GHARIB), SWEEP HOLE WITH TANDEM PILL (50 BBL LOW VIS + 50 HIGH VIS),
24Hs plan: CIRCULATE TILL HAD SHAKER CLEAN, SPOT 50 BBL. HI-VIS ON BTM. WIPER TRIP TO CSG WINDOW, DISPLACE HOLE TO OBM & A.F.E: MM $6.00
CONTINUE DRLG OF 8 1/2" HOLE.
HSE:
Trip Drill: Sour Gas: Fire Drill: 16/02/2020 Days Free Since LTA
Kick Drill: Rig Evac: M O B: LAST BOP TEST 20/02/2020
Drills run Today: STOP CARDS First aid Cases: H2S Drill 21/02/2020
BHA
BHA Number: 7 Length (ft): BHA Wt: 48.00 Wt. below jar IN MUD: 12 KLBS JAR S/N: DJ 10-650-90
Jar in hole (hrs) 20
Components
** BHA #7 : ( 8 1/2" PDC BIT + ATK STEERABLE + 6 3/8" FLEX SUB + 6 3/4" ON-TRACK-STOP + 6 3/4" BCPM + 6 3/4" NM STOP-SUB + 6 3/4" STAB. + 6 CIRC. SUB S/N: 81
3/2" FLOAT-SUB + 6 3/8" BPL+ 6 X 6 1/2" DC + 6 1/2" JAR + 3 X 6 1/2" DC + 24/5" HWDP).
CIRC. SUB HR: 44.5
BIT INFORMATION MUD Information WellControl: Drilling Information
Bit Number: 2 TEST TIME: Last Csg Depth MD(ft): 3456.5 Motor AKO
Run Number: 3 Mud sys: WBM Last Csg TVD (ft): Motor RPG
Type: PDC Mud type: SSM FIT/LOT (EMW): P/U - S/O- ROT WT.S (klbs):
IADC Code: M223 FLOW LINE TEMP, F 90 current mud wt. Motor RPM
Manufacturer: BAKER HUGHES DEPTH 4261 MAASP (psi): 0 Wt on Bit (klbs):
Size (in.): 8 1/2" MUD WT - PPG 10.30 Last BOP Test: Surface RPM:
Serial No: 5300526 F. VIS.- SEC/Q 47 SCR Pump Information:
Nozzles: 6 * 13 RPM 6 10 DEPTH: Pump PumpLiner Strokes Circ. Rate
TFA : RPM 3 8 time: Number bore(in) Ln(in) SPM (gpm)
BIT FOOTAGE PV - CP 17 SPM: 1
Last Run date: 2/3/2020 YP - lb/100ft2 25 Pump1 -psi 2
total on-btm(hrs) 44.42 GEL 10S - lb/100ft2 10 Pump2 -psi Stand-Pipe (psi):
TOTAL FOTAGE: 1538.0 GEL 10M - lb/100ft2 14 Pump3 -psi Flowrate (gpm):
current run depth: 3900 API FILTRATE HPHT Directional Survey Information:
Today on-btm hrs: 12.97 CAKE API/HTHP- 1/32 MD Angle AZI TVD Vertical Coordinates DLS
Today footage: 563.0 SAND % 4983.00 32.02 37.79 4780.89 714.69 867964.61 599154.56 0.84
Today ROP (on btm) 43.0 SOLIDS % 5080.00 32.55 38.41 4862.89 766.05 867974.36 599167.00 0.64
PH 9 5176.00 32.61 38.13 4943.78 817.42 867984.13 599179.38 0.17
OIL % 5272.00 32.51 37.84 5024.69 868.73 867993.83 599191.80 0.19
SALINITY 170000 5366.00 32.76 37.61 5103.85 919.05 868003.29 599204.03 0.30
DULL GRADING WATER % 5461.00 32.77 37.90 5183.74 970.09 868012.89 599216.43 0.17
Inner Rows: MP-CCs H2SO4 5555.00 32.74 37.87 5262.79 1020.59 868022.42 599228.68 0.04
Outer Rows: O/W % 5651.00 32.71 37.65 5343.55 1072.11 868032.11 599241.19 0.13
Dull Charac.: CL-Whole Mud - ppm 5747.00 32.72 38.76 5424.33 1123.66 868041.90 599253.63 0.62
Location: WPS (CaCl2)-Mg/L 5842.00 32.58 39.92 5504.32 1174.69 868051.81 599265.72 0.68
Bearing Seals: MBT 30 5938.00 32.52 38.74 5585.24 1226.11 868061.80 599277.91 0.66
Gauge: Stability - Volts 6035.00 32.41 39.21 5667.08 1277.92 868071.79 599290.25 0.28
Other Dull: KCL %
Reason Pulled:
CONSUMABLES
PRODUCT PREV. BBLS RCVD. BBLS USED BBLS TODAY BBLS USABLE REQUIRED
P/ WATER, BBL 490 80 80 490 0
D/ WATER, BBL 176 0 0 176
DIESEL, BBL 885 0 259 626 406
BULK MATERIAL
PRODUCT PREV. RCVD. USED TODAY (CU.FT) TODAY (SACKS) TODAY (MT)
CEMENT G-NEAT #1 800 442 358 358.00
CEMENT G-NEAT #2 0 0 0 0.00
CEMENT G-NEAT #3 0 0 0 0.00
BARITE #1, CU.FT 56 0 7 49 66.22
BARITE #2, CU.FT 0 0 0 0.00
BARITE #3, CU.FT 0 0 0 0.00
1of2
Allowed Loads
TOTAL 2.0
OPERATION AFTER MIDNIGHT
0:00 4:30 4.5 RESUME DRLG OF 8 1/2" HOLE FROM 5990' TO 6150' (BASE OF S.GHARIB)
** WASH UP & REAM DOWN EVERY STAND
** SWEEP HOLE W/ TANDOM PILL EVERY STAND.
** SEND DOWNLINK EVERY STAND.
** RECORD MWD SURVEY EVERY STAND.
4:30 6:00 1.5 SWEEP HOLE WITH TANDEM PILL (50 BBL LOW VIS + 50 HIGH VIS), CIRCULATE TILL HAD SHAKER CLEAN.
TOTAL 6.0
LOGISTIC SERVICES $
1034
15000
4750 4750 4750 4750 4750 4750 4750 4750
8000 12000
8750
40000
32000
5950 6630 2805 2805 5100 4675 4675 4675
1000
1200 1200 1200
2000 2000 2000 2000 2000
1466 1466
4155 4155
900 900
195 195
40000
350 350
200 200
12000
67000
500 500 500 500 500 500
400 400 400 400 400 400
12000
1397
29750
31000
1000
500
400
1466
7850
900
190
4000
350
200
1000
500
500
4750
1000
$ 86,753 $ - $ - $ - $ - $ - $ - $ -
$ 1,562,186 $ 1,562,186 ### ### ### ### ### ###
15-Mar-20 16-Mar-20 17-Mar-20 18-Mar-20 19-Mar-20 20-Mar-20 21-Mar-20 22-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
23-Mar-20 24-Mar-20 25-Mar-20 26-Mar-20 27-Mar-20 28-Mar-20 29-Mar-20 30-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
31-Mar-20 1-Apr-20 2-Apr-20 3-Apr-20 4-Apr-20 5-Apr-20 6-Apr-20 7-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
8-Apr-20 9-Apr-20 10-Apr-20 11-Apr-20 12-Apr-20 13-Apr-20 14-Apr-20 15-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
16-Apr-20 17-Apr-20 18-Apr-20 19-Apr-20 20-Apr-20 21-Apr-20 22-Apr-20 23-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
24-Apr-20 25-Apr-20 26-Apr-20 27-Apr-20 28-Apr-20 29-Apr-20 30-Apr-20 1-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
2-May-20 3-May-20 4-May-20 5-May-20 6-May-20 7-May-20 8-May-20 9-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
10-May-20 11-May-20 12-May-20 13-May-20 14-May-20 15-May-20 16-May-20 17-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
18-May-20 19-May-20 20-May-20 21-May-20 22-May-20
$ - $ - $ - $ - $ -
### ### ### ### ###