Amal-18 Sta DDR#34 16-03-2020
Amal-18 Sta DDR#34 16-03-2020
16-Mar-20 No: 34
GENERAL DATAINFORMATION:
Rig Name: ADM-6 DRLG SUPV. Emad Eldin Waheed Water Depth: 77 ONHIRE DAYS: 32.52
Well Name: AMAL-18 STA Night DRLG. Ahmed Ashraf RKB-MSL: 95.3 MOVING: 1.52
Location: Gulf Of Suez DRLG ENG RKB-THF: 53.5 FT PLANNED DAYS: 48
Field: AMAL FIELD PET. ENG PLANNED TD: 10242 FT TODAY NPT, HR:
PLATFORM: AMAL-B SPUD DATE 29/02/2020 Cumulative NPT, hrs: 6
06:00 Status: SLIP & CUT DRILLING LINE (IN PROGRESS). Daily Cost, USD: $ 72,453
24Hs Summary: till
00:00 CONT. R. STEERABLE DRLG 8 1/2" HOLE T/9925', CIRCULATE TILL SHAKER CLEAN, SPOT 20 BBL H.V.P, POOH WIPER TRIP T/9125 FT. Cum. Cost, USD: $ 2,230,533
24Hs plan: RIH WIPER TRIP TO TD, POOH W/8.5'' RSS DRLG ASSY. T/SURFACE & L/D SAME, R/U SLB W/L EQUIPMENT. A.F.E: MM $6.00
HSE:
Trip Drill: Sour Gas: Fire Drill: 6/3/2020 Days Free Since LTA
Kick Drill: Rig Evac: M O B: LAST BOP TEST 06/03/2020.
Drills run Today: MUSTER DRILL STOP CARDS First aid Cases: H2S Drill 15/03/2020
BHA
BHA Number: 7 Length (ft): BHA Wt: 48.00 Wt. below jar IN MUD: 14 KLBS JAR S/N: DJ 10-650-90
Jar in hole (hrs) 236
Components
** BHA #7 : ( 8 1/2" PDC BIT + ATK STEERABLE + 6 3/8" FLEX SUB + 6 3/4" ON-TRACK-STOP + 6 3/4" BCPM + 6 3/4" NM STOP-SUB + 6 3/4" STAB. + 6 CIRC. SUB S/N: 81
3/4" FLOAT-SUB + 6 3/8" BPL+ 6 X 6 1/2" DC + 6 1/2" JAR + 3 X 6 1/2" DC + 24/5" HWDP).
CIRC. SUB HR: 195
BIT INFORMATION MUD Information WellControl: Drilling Information
Bit Number: 2 TEST TIME: Last Csg Depth MD(ft): 3456.5 Motor AKO N/A
Run Number: 3 Mud sys: OBM Last Csg TVD (ft): Motor RPG N/A
Type: PDC ( 617) Mud type: OBM FIT/LOT (EMW): P/U - S/O- ROT WT.S (klbs): 230-175-200
IADC Code: M223 FLOW LINE TEMP, F 90 current mud wt. Motor RPM N/A
Manufacturer: BAKER HUGHES DEPTH 9925 MAASP (psi): 0 Wt on Bit (klbs): 10-25
Size (in.): 8 1/2" MUD WT - PPG 10.90 Last BOP Test: Surface RPM: 140
TRANSFERRED 22
DIESEL, BBL 889 0 86 803 583 BBL TO MUD SYSTEM
BULK MATERIAL
PRODUCT PREV. RCVD. USED TODAY (CU.FT) TODAY (SACKS) TODAY (MT)
CEMENT G-NEAT #1 358 733 0 1091 1091.00
CEMENT G-NEAT #2 0 0 0 0.00
CEMENT G-NEAT #3 0 0 0 0.00
BARITE #1, CU.FT 49 0 0 49 66.22
BARITE #2, CU.FT 0 0 0 0.00
BARITE #3, CU.FT 0 0 0 0.00
1of2
Allowed Loads
Geology Information:
Formation Top in program Actual Formation Top in program Actual
Lithology Lithology
Name: MD/TVDSS MD/TVDSS Name: MD/TVDSS MD/TVDSS
S.Gharib ANHYDRITE, SALT & SHALE BELAYIM 6177' /-5691'
KAREEM 6768'/-6178 RUDIES 7214'/-6501'
PERSONNEL ON BOARD
Company No. of people Company No. of people
Amapetco 5 Mud logging Petro-service 5
ENVIRONMENTAL SOLUTION 4 ADES Service 0
Amapetco Field 4 SLB W/L 0
EVACO 2 SLB Downhole 0
RIG ADM-6 48 Gharib S/L 0
Catering 14 Baker Fishing 0
Baker Mud 2 WELL SERVICE GYRO 0
DIRECTIONAL & MWD BAKER 4 TOTAL ON BOARD 88
TIME (HH:MM)
OPERATIONS
From To Hrs
0:00 6:00 6.0 CONT. R. STEERABLE DRLG 8 1/2" HOLE F/9510' T/9668'.
** GPM: 500, SPP: 2000/2200 PSI, WOB: 10-20 KLBS, RPM: 140, OFF/ON BTM TORQUE: 3/10 KLB.FT.
** MWD SURVEY & RSS DOWN LINK EVERY STD.
** WASH& REAM SWEEP HOLE W/15 BBL HVP EVERY STD.
** LAST 6 HRS BIT TIME: 4.55 HRS, BIT FOOTAGE: 158 FT, BIT AVG ROP: 34.7 FT/HR
** LAST 6 HRS LOSSES WHILE DRILLING : 4 BPH
** LITHOLOGY : SHALE & SANDSTONE
** LAST SAMPLE : 10% SANDSTONE, 90% SHALE @ DEPTH 9060'
6:00 16:00 10.0 CONT. R. STEERABLE DRLG 8 1/2" HOLE F/9668' T/9925'.
** GPM: 500, SPP: 2000/2200 PSI, WOB: 20-25 KLBS, RPM: 140, OFF/ON BTM TORQUE: 3/10 KLB.FT.
** MWD SURVEY & RSS DOWN LINK EVERY STD.
** WASH& REAM SWEEP HOLE W/15 BBL HVP EVERY STD.
** LAST 24 HRS BIT TIME: 13.25 HRS, BIT FOOTAGE: 415 FT, BIT AVG ROP: 31.3 FT/HR
** LAST 24 HRS LOSSES WHILE DRILLING : 4 BPH.
** LITHOLOGY : SHALE & SANDSTONE
** LAST SAMPLE : 100% SHALE @ DEPTH 9925'
** AV. BG GAS : 0.17 % ** MAX BG GAS : 0.4 % @ 9550'
** ESTIMATED MAX. PORE PRESSURE: 9.99 PPG @ DEPTH 7318 FT
** ESTIMATED FRACTURE PRESSURE: 13.98 PPG
** ESTIMATED OVERBURDEN GRADIENT: 17.92 PPG
** ESTIMATED PORE PRESSURE: 9.28 PPG
** POSS. TOP BELAYIM FM. (H.FOROUN MBR) @ 6177' MD / -5691' TVDSS
** POSS. TOP (FEIRAN MBR) @ 6368' MD / -5852' TVDSS
** POSS. TOP (SIDRI MBR) @ 6585' MD / -6033' TVDSS
** POSS. TOP (BABA MBR) @ 6630' MD / -6070' TVDSS
** POSS. TOP KAREEM FM. (SHAGAR MBR) @ 6768' MD / -6178' TVDSS
** POSS. TOP KAREEM FM. (MARKHA MBR) @ 7023' MD / -6367.5' TVDSS
** POSS. TOP RUDIES FM. @ 7214' MD / -6501' TVDSS
** AFTER FAULT CUT POSS. TOP KAREEM FM. (SHAGAR MBR)@ 9242' MD/ -7662.5' TVDSS.
** AFTER FAULT CUT POSS. TOP (MARKHA MBR)@ 9720' MD/ -7919.5' TVDSS.
** AFTER FAULT CUT POSS. TOP RUDIES FM. @ 9855' MD/ -7992.5' TVDSS.
16:00 21:30 5.5 CIRCULATE BTM-UP , SWEEP HOLE TWICE W/ W/40 L.V.P (10.8 PPG, 40 CP) FOLLOWED BY 40 BBL WEIGHTED H.V.P (13 PPG, 120 CP), TILL SHAKER CLEAN,
OK.
21:30 22:00 0.5 SPOT 20 BBL H.V.P ON BTM.
22:00 22:30 0.5 PJSM, POOH WIPER TRIP T/ 9725 FT.
22:30 23:00 0.5 MALFUNCTION OF TDS LINKS CONTROL PANEL, REPAIR SAME, OK.
** MEANWHILE CIRCULATE & ROTATE SAME ROTARY TABLE, W/150 GPM & 80 RPM
23:00 0:00 0.5 CONT. POOH WIPER TRIP T/9125 FT.
** NO TIGHT SPOTS.
NOTE:
** BAKER HUGHES DIDN'T SEND A BACKUP TOOL FOR ONTRACK TILL NOW.
OFFLOAD BACKLOAD
TOTAL 24.0
OPERATION AFTER MIDNIGHT
0:00 5:30 5.5 CONT. POOH WIPER TRIP T/3039 FT (INSIDE 9-5/8'' CSG).
** HAD TIGHT SPOT @ 7609 FT, WORK ON SAME BY WASH-UP & REAM DOWN, OK. **HOLE IN GOOD SHAPE.
** DRAG WHILE TRIPPING: 20 KLB. ** LOSSES WHILE TRIPPING: 11 BBL
5:30 6:00 0.5 SLIP & CUT DRILLING LINE (IN PROGRESS).
TOTAL 6.0
LOGISTIC SERVICES $
1034
15000
4750 4750 4750 4750 4750 4750 4750 4750
8000 12000
8750
40000
32000
5950 6630 2805 2805 5100 4675 4675 4675
1000
1200 1200 1200
2000 2000 2000 2000 2000
1466 1466
4155 4155
900 900
195 195
40000
350 350
200 200
12000
67000
500 500 500 500 500 500
400 400 400 400 400 400
12000