Professional Documents
Culture Documents
Amal-18 Sta DDR#32 14-03-2020
Amal-18 Sta DDR#32 14-03-2020
14-Mar-20 No: 32
GENERAL DATAINFORMATION:
Rig Name: ADM-6 DRLG SUPV. Emad Eldin Waheed Water Depth: 77 ONHIRE DAYS: 30.52
Well Name: AMAL-18 STA Night DRLG. Ahmed Ashraf RKB-MSL: 95.3 MOVING: 1.52
Location: Gulf Of Suez DRLG ENG RKB-THF: 53.5 FT PLANNED DAYS: 48
Field: AMAL FIELD PET. ENG PLANNED TD: 10242 FT TODAY NPT, HR:
PLATFORM: AMAL-B SPUD DATE 29/02/2020 Cumulative NPT, hrs: 6
06:00 Status: CONT. R. STEERABLE DRLG T/9080'. Daily Cost, USD: $ 75,822
24Hs Summary: till
00:00 RIH SHORT WIPER TRIP T/8611', CONT'D DRLG 8 1/2" HOLE F/8611' T/8932'. Cum. Cost, USD: $ 2,083,808
24Hs plan: CONTINUE DRLG 8 1/2" HOLE AS PER PROGRAM. A.F.E: MM $6.00
HSE:
Trip Drill: Sour Gas: Fire Drill: 6/3/2020 Days Free Since LTA
Kick Drill: Rig Evac: M O B: LAST BOP TEST 06/03/2020.
Drills run Today: MUSTER DRILL STOP CARDS First aid Cases: H2S Drill 21/02/2020
BHA
BHA Number: 7 Length (ft): BHA Wt: 48.00 Wt. below jar IN MUD: 14 KLBS JAR S/N: DJ 10-650-90
Jar in hole (hrs) 188
Components
** BHA #7 : ( 8 1/2" PDC BIT + ATK STEERABLE + 6 3/8" FLEX SUB + 6 3/4" ON-TRACK-STOP + 6 3/4" BCPM + 6 3/4" NM STOP-SUB + 6 3/4" STAB. + 6 CIRC. SUB S/N: 81
3/4" FLOAT-SUB + 6 3/8" BPL+ 6 X 6 1/2" DC + 6 1/2" JAR + 3 X 6 1/2" DC + 24/5" HWDP).
CIRC. SUB HR: 150
BIT INFORMATION MUD Information WellControl: Drilling Information
Bit Number: 2 TEST TIME: Last Csg Depth MD(ft): 3456.5 Motor AKO N/A
Run Number: 3 Mud sys: OBM Last Csg TVD (ft): Motor RPG N/A
Type: PDC ( 617) Mud type: OBM FIT/LOT (EMW): P/U - S/O- ROT WT.S (klbs): 215-170-195
IADC Code: M223 FLOW LINE TEMP, F 90 current mud wt. Motor RPM N/A
Manufacturer: BAKER HUGHES DEPTH 8932 MAASP (psi): 0 Wt on Bit (klbs): 10-20
Size (in.): 8 1/2" MUD WT - PPG 10.80 Last BOP Test: Surface RPM: 140
BULK MATERIAL
PRODUCT PREV. RCVD. USED TODAY (CU.FT) TODAY (SACKS) TODAY (MT)
CEMENT G-NEAT #1 800 442 358 358.00
CEMENT G-NEAT #2 0 0 0 0.00
CEMENT G-NEAT #3 0 0 0 0.00
BARITE #1, CU.FT 49 0 0 49 66.22
BARITE #2, CU.FT 0 0 0 0.00
BARITE #3, CU.FT 0 0 0 0.00
1of2
Allowed Loads
NOTE:
** BAKER HUGHES DIDN'T SEND A BACKUP TOOL FOR ONTRACK TILL NOW.
OFFLOAD BACKLOAD
** 83000 LTR DIESEL. ** 5 EA FULL CUTTING BOXES
** 4 EA EMPTY CUTTING BOXES
** MUD CHEMICALS (CARBO TEC - ECCOMULE- LIME- CACO3)
** GEOLOGIC SAMPLES WOODEN BOXES
** 48 JT'S 7" CASING
TOTAL 24.0
OPERATION AFTER MIDNIGHT
0:00 6:00 6.0 CONT. R. STEERABLE DRLG 8 1/2" HOLE F/8932' T/9080'.
** GPM: 500, SPP: 2000/2200 PSI, WOB: 10-20 KLBS, RPM: 140, OFF/ON BTM TORQUE: 3/10 KLB.FT.
** MWD SURVEY & RSS DOWN LINK EVERY STD.
** WASH& REAM SWEEP HOLE W/15 BBL HVP EVERY STD.
** LAST 6 HRS BIT TIME: 4.83 HRS, BIT FOOTAGE: 148 FT, BIT AVG ROP: 30.6 FT/HR
** LAST 6 HRS LOSSES WHILE DRILLING : 4 BPH
** LITHOLOGY : SHALE & SANDSTONE
** LAST SAMPLE : 80% SHALE, 20% SANDSTONE @ DEPTH 9060'
TOTAL 6.0
LOGISTIC SERVICES $
1034
15000
4750 4750 4750 4750 4750 4750 4750 4750
8000 12000
8750
40000
32000
5950 6630 2805 2805 5100 4675 4675 4675
1000
1200 1200 1200
2000 2000 2000 2000 2000
1466 1466
4155 4155
900 900
195 195
40000
350 350
200 200
12000
67000
500 500 500 500 500 500
400 400 400 400 400 400
12000
9071
11645
31000
1000
500
400
1466
7850
900
190
4000
350
200
1000
500
4750
1000
$ 75,822 $ - $ - $ - $ - $ - $ - $ -
$ 2,083,808 ### ### ### ### ### ### ###
22-Mar-20 23-Mar-20 24-Mar-20 25-Mar-20 26-Mar-20 27-Mar-20 28-Mar-20 29-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
30-Mar-20 31-Mar-20 1-Apr-20 2-Apr-20 3-Apr-20 4-Apr-20 5-Apr-20 6-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
7-Apr-20 8-Apr-20 9-Apr-20 10-Apr-20 11-Apr-20 12-Apr-20 13-Apr-20 14-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
15-Apr-20 16-Apr-20 17-Apr-20 18-Apr-20 19-Apr-20 20-Apr-20 21-Apr-20 22-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
23-Apr-20 24-Apr-20 25-Apr-20 26-Apr-20 27-Apr-20 28-Apr-20 29-Apr-20 30-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
1-May-20 2-May-20 3-May-20 4-May-20 5-May-20 6-May-20 7-May-20 8-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
9-May-20 10-May-20 11-May-20 12-May-20 13-May-20 14-May-20 15-May-20 16-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
17-May-20 18-May-20 19-May-20 20-May-20 21-May-20 22-May-20
$ - $ - $ - $ - $ - $ -
### ### ### ### ### ###