Project No:

HAZOP REVIEW LOGSHEET


Sheet of
Project Title: Flowsheet No:

Process Block Being Review Panel


Reviewed + Duty

Guide Deviation Possible Causes Consequences Action Required


Word

1.Possible melting of superheater tubes. 1. Flow Meter After Valve#4 and signal to
NONE No Flow
Valve #4 accidental closure (Operator Error) Fire hazard due to ethanol contact with be transmitted to Shut off valve connected
superheater furnace. to fuel line.
2. Temperature transmitter installed in
superheater and attached to a deluge water
sprinkler system.
3. Alarm indicator connected to
Temperature transmitter and Flow meter.
4. Clear Numbering of valves.
5. Thermal/Fire Insulation on the
superheater and piping between the
superheater and reactor.
6.Devise & Implement a defect assessment
and repair plan

Valve #5 accidental closure(Operator Error) 1. Over pressure and Burst of the Pipeline 1.Relief Valve before Valve#5.
that may cause a fire hazard . 2. Alarm indicator and High pressure switch
to trip the pump.
3.Clear Numbering of valves.
4. Devise & Implement a defect
assessment and repair plan

Pump Failure
1.Possible Melting of superheater tubes and 1. Flow Meter After Valve#4 and Shut off
fire hazard due to ethanol contact with valve connected to fuel line.
superheater furnace. 2. Temperature transmitter attached to a
deluge water sprinkler system which will be
activated if the temperature is above critical
point.

.
Authorised By: Date: