Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Galvanized steel mesh

Gas collection unit 3


Gas collection unit 3 Trougheed sheeting
Section 1 - 1
Cross section 3 - 3 Pipe sleeve with gasket

Wall protection - polystyrene sheeting, 10 cm


3 Scale 1 : 25
Scale 1 : 25
PE 100 da 90, SDR 26
PE 100 - gas collection pipe, da 90; SDR 26 Gas solid pipe PE 80 ec da 90 SDR 11
electro-conductive;
Top soil 2 2
Geotextile (300 g/m²)
2.10
Drainage layer

≥ 0.18 ≥ 0.54
Galvanized steel mesh
1 Ball valve 1" with
Gas collection PE 80 ec 0.70 sampling nozzle
Backfilling with soil pipe da 90 SDR 11
2 2 Slide valve for da 90 pipe,
0.75 min. 5 % Butterfly valve DN200 connection with connection with both sides
both sides welding neck and flange welding neck and flange
0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Ball valve 1" with Concrete wall Manifold PE 80 ec
sampling nozzle >3% pipe da 225 SDR 11

ca. 0.60
PE 80 ec pipe da 225 SDR 11 Ventilation nozzle
Slide valve for da 90 pipe, Pipe support
with cap gas tight
connection with both sides (galvanized steel)
2.50

Condensate to pumping station 1 (PS 1) ca. 100 L Condensate storage


welding neck and flange
Concrete wall Reinforced concrete slab and wall
Manifold, PE 80 ec pipe
da 225, SDR 11 Base course class B

ca. 0.60
6.10
Bridge
Reinforced concrete slab
6.40
and wall
Geotextile (600 g/m²) 7.40
Geomembrane (2 mm)

0.60
Geotextile (600 g/m²)
3
Gas collection unit 3
Surface water ditch 2.30 Leveling / gas collection Section 2 - 2
2.70 layer
Waste
(Top view)
3
Scale 1 : 25

Gas transport main; PE-100; da 225; SDR 17 Condensate transport main Connection with electro weld sleeve or flange
PE 100 pipe da 75 SDR 17
1 to leachate pumping station PS 1
Pipe sleeve with gasket

Gas collection PE 80 ec pipe da 90 SDR 11

0.75
Vertical gas collector Butterfly valve DN200 connection with 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
both sides welding neck and flange
Scale 1:25 Concrete wall

2.30
Gas well head
Manifold PE 80 ec pipe da 225 SDR 11 1 1
Butterfly valve DN 100 Top soil ≥ 1 m
connection with both sides 1 : 3,25
welding neck and flange Galvanized steel mash
Double door
Flexible connection DN 80 Reinforced concrete slab (width 2 x 1.0 m) Bridge
electrical conductive
PE 80 ec pipe da 225 SDR 11
Ventilation
6.10
Gas transport main PE 100 pipe da 225 SDR 17 6.40
Concrete manhole
50

Surface water ditch


3
1.20
B B
PE-HD el.

PE 100 da 90, SDR 26


Top soil
Geotextile (300 g/m²)
Drainage layer

Detail A

PE 100- pipe da 315; SDR 11


Detail A - Plan View Detail A - Section Section B - B
Compacted clay / soil
Scale 1:25 Scale 1:25 Scale 1:25
1.50 m

Filter layer
Geomembrane (2 mm) HDPE-Gas collector pipe da 315, SDR 11
Geotextile (600 g/m²) Extrusion-welds HDPE-Sheath pipe da 400 SDR 11 NOTES:
Length 700 mm Lip-seal
Geomembrane (2 mm) HDPE- collar plate 15-6 mm Extrusion-weld -
Geomembrane (2 mm) 6 mm 15 mm Sampling nozzle -
PE 100 - pipe da 250 ; Pre-fabricated HDPE-collar plate -
Geotextile (600 g/m²) HDPE-sheath pipe da 400 SDR 11 400 mm
SDR 17* perforated pipe prior to fabrication check required slope
Leveling / gas collection layer Lip seal Lip-seal
HDPE-Gas collector pipe da 315, SDR 11
Waste

Ventilation Rev. Drawn Checked Approved


Date Description
No.
Flexible connection DN 80
electro conductive
Gravel CaCO3 <25%, 4/32 mm

Top soil
Geotextile (300 g/m²) General section
Drainage layer Scale 1 : 50 KFW - Emission Reduction in Cities Programme
Solid Waste Management - Indonesia

DETAILED ENGINEERING DESIGN - SIDOARJO


OLD LANDFILL

1:3,25 Existing Terrain


Date Name
Fichtner GmbH & Co.KG
Existing wall 2,25 m Sarweystr. 3, 70191 Stuttgart
Tel: +49 711 8995-0
Drawn By 05.04.2017 M. Laschewski

Designed By 05.04.2017 A. Humeniuk


2.75 - 3.50 8.00 5.00
ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH
Auf der Breit 11, 76227 Karlsruhe
Approved By 05.04.2017 G. Burkhardt
Tel: +49 721 94477-0
Geotextile (600 g/m²) Surface water ditch Landfill ring road Green belt
5% Profiling
Geomembrane (2 mm) 2,5 % LF Sidoarjo-Rehabilitation
Geotextile (600 g/m²)
Details final rehabilitation /
0.40

Leveling / gas collection


layer Gravel 40 cm Degasification
Waste
Project Document No. Project Nr. Scale
Lean concrete for consolidation, backfill
Gas transport main; HDPE-100; with gravel mn. 1.00 m
abfw 15-1552_SID_DED_03_01_OLF 7449A01 1:25 / 1:50
da 225; SDR 17

You might also like