3MTM 2179-CM INSTALLATION INSTRUCTIONS

3 Installation Instructions
2179CM Fiber Optical Closure
1. Product description
2179-CM fiber optic distribution closure is specifically designed by 3M for optimal ease-of-use, fast and
cost-effective FTTH deployment. 2179-CM comes with multiple branch/drop ports supporting various types of
branch/drop cables for efficient and weatherproof on-demand home connect installation.

2. Product Specifications
Parameter Specification
Dimension 430mm(L)*200mm(W)*120mm(D)
Splice Capacity Single Fibre:96 cores,Ribbon Fibre:288 cores
Main Cable Entry: 2 ports
Cable Entry Ports
Branch Cable Entry: 12 ports
Main Cable Entry Port:9-16mm,≤96 cores single fiber cable
Cable Entry Port Diameter
Branch Cable Entry Port:5-11mm,≤48 cores single fiber cable
Ingress Protection Rating IP68
Application Manhole, Direct buried, Aerial Strand Mount, Pole Mount

3. Kit Contents

Top Cover Fusion


Heat-shrink
5-8mm Relief Tubes
Adaptors Port Plug

Cable Ties Grease

Sealing Rings
Transition Tube

Cable Entry Clamp


Sealing Tape L-bracket

Sealing Strain Relief


Gasket Module
Base Cover (with tray)

Document Number: 017032 Revision: 00


3MTM 2179-CM INSTALLATION INSTRUCTIONS

4. Cable Preparation

~4cm

4.1 Insert two sealing rings onto 4.2 Remove cable jacket and clean 4.3 Remove central strength
cable. Select sealing rings with cable as per company practice. member, retain approximately
opening closest to cable outer The recommended strip length 4cm of strength member for
diameter. is 1.5m. strain relief.

5. Main Cable Installation

Bolt
Clamp

5.1 To install the L-bracket, loosen 5.2 Affix the L-bracket onto slot on 5.3 Install the sealing gasket onto base
bolt and thread the strength cable entry port of base cover. cover.
member through hole on bolt
body. Align sealing rings as shown Ensure that the entry port circular
above and mark position rings on gasket can be flipped open easily.
Tighten bolt and clamp cable.
appropriately.

5.4 Ensure that the sealing rings 5.5 Flip open circular part of the 5.6 For empty or unused cable
are aligned to the markings from gasket and place the cable into entry ports, build up the port
step 5.2, wrap the cable entry the gasket opening. plug with half circular loop of
sealing around the cable. cable entry sealing tape. Cut
Align and insert the L-bracket access tape with a pair of
Note: If cable with outer diameter and sealing rings into their scissors at 45°angle.
of <9mm, additional tape respective slots on the base
needs to be added to cover. Place port plug into empty port.
increase the build up
thickness. Reposition the circular part of the
gasket to wrap around the cable
build up.

Document Number: 017032 Revision: 00


3MTM 2179-CM INSTALLATION INSTRUCTIONS

6. Distribution or Drop Cable Installation

Cut here for Ø9-11mm cables

Cut here for Ø5-8mm cables


6.1 Cut the distribution port gland with a pair of scissors.
Note: Always use all distribution ports at the bottom side of the base cover first.

6.2 Apply grease evenly to the 6.3 Loosen screws of cable Note: For Ø5-8mm cables,
surface of the cable jacket and retention kit. install 5-8mm relief adaptor
inner wall of the distribution port Place cable and central strength onto cable retention clamp.
gland. member through cable retention
clamp and strength member
clamp respectively and tighten
screws accordingly.

6.4 Insert distribution or drop cable 6.5 Tighten screws on cable 6.6 For additional distribution or drop
through distribution port gland retention clamp and strength cable installations, affix the strain
and cable retention clamp. member clamp respectively. relief modules as shown above.
Thread central strength member Fix the modules with screws
through the strength member provided.
clamp.
7. Fiber Management

7.1 Remove access loose tube to 7.2 Thread fiber through transition 7.3 Loop, manage and store access
reveal fiber cores. tubes loose tubes at the storage area
provided at the base of the closure.

Document Number: 017032 Revision: 00


3MTM 2179-CM INSTALLATION INSTRUCTIONS

7.4 Fix the other end of the transition 7.5 Perform the required splicing 7.6 Bracket provided supports up to
tube onto the tray with cable ties operation as per company four trays. Install and utilize trays in
provided. practice. sequential order, starting with the
Manage fiber within tray and bottom slot.
re-place tray cover.
8. Closure Opening and Closing

8.1 Ensure gasket is aligned to 8.2 Secure closure halves by latching 8.3 Latch on remainder four corner
slot before re-placing top the two center latches first. latches.
cover onto base cover. Note: Care must be taken when Note: Care must be taken when
securing the latch. Ensure securing the latch. Ensure
hand is not in latch-on slot to hand is not in latch-on slot
avoid being clipped. to avoid being clipped.

8.4 Complete sealing process by securing the last latch on the cable entry side of the closure with the help of a flathead
screw driver or other suitable tool.
9. Closure Re-entry

9.1 Place a flathead screwdriver into 9.2 Insert the flathead screwdriver 9.3 Proceed to access the closure
the slot on the latch on cable into the latches on top of the chamber by slowly lifting the
entry side of the closure. closure and open the latches top cover.
one by one.
Note: Do not place hand beneath
latch when opening latches.
Document Number: 017032 Revision: 00