HOO Letter Answer

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Date: January 20, 2015

Attn.: Harouge Oil Operation HOO,


Tender Committee

Project: Supply of Light Rescue Vehicles (Project Ref: 34/2013)

Dear Sir,

Greetings!

Referring to your fax dated 05/01/2015 concerning the mentioned above tender,

Ford factory has stopped production on the model year quoted.


The new quote reflects a new truck. Ford production starts back up in March 2015.

after having examined The Technical Specification which occurred a Slight change But Still
meet HOO Requirement , we would like to inform you that our Offer Still the Same

Although the Supplier price has changed but we are very keen in the terms of your satisfaction to
our services and we deeply value your relationship with JOS Company because we are
committed to provide you the highest level of service simply because you deserve the best.

We agree to abide by this Offer for a deadline Date end of March, 2015 it shall remain binding
upon us and may be accepted at any time before the expiration of that period.

These are the Changed Specification :


 Light zone c upper become one pair  not two pair and model (50R03ZRR)
 LIGHT ZONE A lower model become 580CAARR
 Light Zone B/D Mid ship Lower Model become 580CAAARRWHELEN 580  series.
 Light Led SCENE become 6SCOENZR(12 DIODE)
 LIGHT TO WER model become NS2.3-300(WHL) 12 VOLTS DC
 Pneumatic Controls Elevate completely in 30 second not 60 second
 Flood light System.

If you have any further questions, please feel free to Contact us.

Sincerely yours,
___________________
RAGAB H. EL BORGI
General Manager
Jabel Oil Services (JOS)

You might also like