To Be Incorporated Into Chapter 4: No Item Unit Quantity Unit Cost (ETB) Total Cost (ETB) Remarks

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

To be incorporated into chapter 4

Cost is a core component that was considered during this project work. The cost of each material
including daily labor cost used for the construction ofthe house for handicapped woman, 85
years old patriarch and fence work was discussed in Table 4, 4.1 and 4.2 respectively. It was
shown that about ___ETB, ____ETB, and ___ETB were used correspondingly.

Table 4 Cost of materials and daily labor used for the construction of 85 years patriarch house

No Unit Quantity Unit cost Total Remarks


Item (ETB) Cost
(ETB)
1 No 200 120 24000 Half of the wood
Wood
is donation
2 Metal sheet No 24 185 4440 10 metal sheet
Google and Use donation
the correct name
this different
material name
3 Kg 10 115 1150 3 Kg donation
Nail
from shops
4 cart 10 200 2000 Bought under
Soil the real price as
a contribution
5 No 4 person for 200 12000 Volunteers were
15days helping
Daily labor
additionally for
some days
6 L >10,000 2/20L 1500 Some of the
Liters was
Water
donation from
Neighbors
7 2 2500&500 3000 Door is donation
from
Window and door
governmental
office
8 Paint gallon 2 gallon, 1kg & 280,160&21 650
60Kg 0
9 Paint brush No 3 70 & 25 165
10 meter 1m=1 1050 1050 Bought under
the real price as
mattress
a contribution
from seller
11 Ceiling meter 30 15 450
12 Plastic mat meter 14m*2m 90 1260
13 Professional 2 person /day 363 10,890
supervision for 15 days
14 Transportation
15 Cart (soil 10 50 500
transporting)
16 Bajaj 8 40 320
17 Taxi 15days*2person 10 300
18 Component times 4 250 1000 Provided from
transportation governmental
(car) offices

Table 4.1 Cost of materials and daily labor used for the construction of handicapped woman

No Item Unit Quantity Unit cost Total Cost Remarks


1 Wood No 130 120 15600
2 No 14 185 2590 Collected
Metal sheet from the
community
3 Kg 8 115 920 2 kg is
Nail contributed
by the seller
4 cart 20 200 4000 some of the
Soil carts was
contributions
5 No 4 person for 15 200 12000 Volunteers
Daily labor days was working
for a week
6 L 10,000 5/20L 2500 Natural water
but paid for
Water
the carrier
only
7 2 2500 & 500 3000 Door is
donation
Window and door from
governmental
office
8 mattress meter 1.20cm=1 1150 1050
9 Ceiling meter 25 15 375
10 Plastic mat meter 10m*2m 90 900
13 Professional 2 person /day 363 10,890
supervision for 15 days
Transportation
14 Cart (soil 8 50 400
transporting)
15 Bajaj 8 40 320
16 15days*2perso 14 420
Taxi
n
17 Component times 4 250 1000
transportation (car)

Table 4.2 Cost of materials and daily labor used for Fence work

No Item Unit Quantity Unit cost Total Cost Remarks


1 No 16 90 1440 Provided
from
Wood
individual
supporters
2 Metal sheet No 15 60 900 Re-used
3 Nail Kg 1.5 70 105
5 Daily labor No 2 150 300
6 Mentorship 2 person 363 726
for a day
7 Transportation
Taxi 2 person 10 20
cart 2 times 70 140

Table 4.3 Cost summary

No Item Unit Quantity Unit cost Total Cost Remarks


1 85 years patriarch No 1 64675
house
2 handicapped No 1 55965
woman house
3 No 1 3631
Fence
124,271.00
Total