RISK ASSESSMENT AND ANALYSIS/ ‫قييم توـحليل لاـمخاطر‬

‫تــ‬

RA Number:01‫قييم لاـمخاطر‬
‫تــ‬ ‫ رقم‬REV.0 WORKPLACE / TASK / ACTIVITY / PROCESS NAME:‫ لاـمعـدة‬/‫ لاـعملية‬/ ‫ لاـمهمة‬/ ‫لاـموقعـ‬ DEPARMENT / AREA:‫ لاـمنطقة‬/‫ اـالدارة‬: projects
RA TEAM (NAMES):‫ريق لاـتقييم‬
‫اسمءاـ فــ‬ DATE:12/10/2020/: ‫اتاريخ‬
1.Attaf jaber site manager Plumbing Work
2.Tayib jabbar :HSE officer NEXT REVIEW DATE / 12/10/2021 ‫اـاـدم‬
‫اريخ مراجـعـة لق‬
‫تــ‬
APPROVED BY MANAGER / SUPERVISOR:‫اعتمد من قـبل‬
Ibrahim obodi SEC project Engineer
SIGNATURE:‫لاـتوقيعـ‬
HAZARD IDENTIFICATION/‫حديد لاـمخاطر‬
‫تــ‬ CONTROL/‫وـسائـل لاـتحكم‬ RISK ASSESSMENT RISK REDUCTION ACTION PLAN/ ‫تقييم لاـمخاطر‬
‫خـطـة لاـعمل ل ـ‬
‫تقييم المخاطر‬

Item # Workplace/ Activity/ Process/ Equipment/ Hazards ‫اـالخطـار‬ Risk Issue (Possible Incident) (What can go wrong) Existing Controls ‫وـسائـل لاـتحكم لاـمتوفرة‬ C L R (Improve Existing Controls/ Implement new controls) C L R Controls
‫لاـرقم‬ materials /‫ لاـمعـدات‬/‫موقعـ لاـعملظمهمة لاـعمل‬ (Accident/ Ill health to person, fire or property loss) /‫لاـمخاطر‬ o i a ‫واـسيطرة اـالضافية‬
‫لاـتحكم ل‬ o i i Implemented (Yes
‫لاـمتسلسل‬ ‫لاـمواد‬ ‫ لاـمحتملة‬/ n k n n k s / No)/‫تــ لاـتنفيذ‬
‫هل م‬
s e k s e k ‫الـ‬/‫نـعم‬
e l i e l
q i n q i R
u h g u h a
e o e o n Follow up By Whom (Name) & By When (Date) ‫لاـمهمة‬
n o n o k ‫ لاـتاريخ‬/‫تنفيذ‬
‫بــ‬
‫لاـ‬ ‫لاـمعنية‬
c d c d i
e e n
g

1 Work preparation and work Planning Obtaining required permit from uncertified Unauthorized work activities conducted inside • Ensure LOA holder is approved by SEC. IWP 4 3 12 Ensure the IWP filled properly with the 4 1 4 LOA Holder Yes
for Plumbing work person LOA, IWP etc. LOA holder was not substation that poses the risk of Electrocution, is prepared by the approve permit issuer and correct type of work permit being issue by
approved to supervise the activity property damage & fire receiver. certified permit issuer and Receiver.
Ensure IWP is properly and completely filled Ensure all relevant documents (MOS, RA, JSP,
and sign by the concerned party. ERP, EEP & other documents)are submitted
to concerned SEC department through
official submittal paper.

Delay or neglect to contact CRCC & Unauthorized person entered the energized • Proper coordination with all concern 4 2 8 Ensure that LOA Holder coordinate with all 4 1 4 LOA Holder Yes
Maintenance department substation that poses the risk of property personnel and department. And ensure all concern personnel.
damage, minor to major physical injury employees have valid SEC ID & Iqama Ensure all the workforce Filled the site entry
log book

Misunderstand/ poor communication due to May resulted Property damage & personnel • Ensure that LOA Holder and safety officer 4 2 8 Ensure that LOA Holder have all concerns 4 1 4 LOA Holder & Safety Officer Yes
language barrier injury have good communication skills and personnel contact numbers
communicate in language both known to
them.

Failure to change Fire suppression system from Property damage due to FM200 release Health • LOA Holder must be approved from SEC 4 2 8 LOA Holder and safety officer double check 4 1 4 LOA Holder & Safety Officer Yes
Automatic to Manual due to incompetency of issues and personnel injuries Lose of production and knowing the protocol of energized fire suppression system is on manual position
LOA Holder & short cut activity adaptation & time wastage - Suffocation substation
procedure

Unauthorized personnel Entrance & Poor gate Contact with energized equipment may lead to • LOA Holder must be ensure all person have 4 3 12 LOA Holder must ensure all record available 4 1 4 LOA Holder & Safety Officer Yes
supervision Electrical shock, and burn for the personnel authorization proof valid SEC IDS/PFTA and on registered for coming and outgoing
Property damage and loss of company company iqama. personnel.
reputation Proper watch man stand by to registered All working person must have SEC ID / PFTA
incoming and outgoing personnel Assign one person to monitor the entrance
gate

Approved safety documents from SEC such as Lack of awareness / training about emergency • LOA holder and safety officer make sure 4 2 8 LOA holder / Safety officer make sure all 4 1 4 LOA Holder & Safety Officer Yes
RA, JSP, ERP, EEP etc. not provided and / or plan / evacuation plan, RA, JSP, MS, PTW etc. emergency response plan, RA, JSP, MS, PTW, safety documents established before
available in the workplace. lead to personnel injuries and property damage TBT / safety induction documents etc. and all commencing a job
- Fatality and loss of company reputation other documents are available in work place.
• LOA holder must be aware of the 5 star
safety procedure for required documents
prior to start of job.

1
Inadequate Planning & Preparation of job by Inadequate planning lead to personnel injuries - • Qualified and experienced persons should 4 3 12 Do not bring extra material which is not 4 1 4 Manger Engineer LOA Holder & Safety Yes
Technical or concern people Waste of time - Bad reputation of company - be involved in planning. • Follow related to job. Officer
Material loss - Slow work progress approved method of statement for work LOA Holder must ensure that all personnel
procedure have valid SEC IDS & Iqama.
• All the tasks should be scheduled and Ensure all the work force matched with their
documented as well. profession.
During preparation site manager, engineers
and safety personnel provide correct
documentation prior to the job

Absence of LOA Holder before and during the Absence of LOA holder lead to unauthorized • LOA holder must be present before start of 4 3 12 Do not start any work if the LOA holder is 4 1 4 LOA Holder & Safety Officer Yes
work execution operation of equipment which may lead to job and during execution of the job. not available at work site.
personnel injuries, Damage property and loss of • LOA Holder must ensure to complete all Do not enter any person inside the
life, etc PTW requirements and implement safety substation.
precautions. All the steps of task to be monitored by LOA
TBT or Safety orientation must be conducted holder and safety officer
and discussed the important points of
working inside the energized substatio

Working personnel not received safety Poor information and instruction not received • Ensure that that safety induction and daily 3 3 9 Daily TBT to be conducted related to work in 3 1 3 LOA Holder & Safety Officer Yes
induction and no daily TBT was conducted. and absorbed by the workforce that resulted to TBT are conducted and absorbed by the the site. Orientation (Attendance register,
Topic not related to the task. Workers have minor to major physical injuries and property workforce. supporting documents, and training
different language. damage. • Should be select and discussed task specific handouts) records should be retain with the
topic. And it should be conveyed their own LOA holder.
languages. (use translators)

2 Work place preparation and Planning Work carried out without the presence of LOA Absence of LOA holder & safety officer • Ensure LOA holder & safety officer always 4 3 12 It should be ensured by site security, SEC 4 1 4 LOA Holder & Safety Officer Yes
for Plumbing work holder / Safety Officer/First aider/Fire fighter supervision can cause to Major Minor Injury available during the working hours. authorized personnel’s and consultants. All
Property loss • Ensure First aider & Fire fighter always associated hazards for this specific work and
available during the working hours and do location must have corresponding control
not demobilize them until work completed. measures.
• Should be maintain entry exit log book and Upon the work execution the JSP and RA
updated without any delay. must be revised according to the site
workplace condition All associated hazards
for this specific work and location must have
corresponding control measures.
Upon the work execution the JSP and RA
must be revised according to the workplace
inspection.

Workforce not provided with appropriate PPE,s Inadequate & substandard PPE lead to minor to • LOA Holder and Safety officer ensure that 3 3 9 Do not use uninspected PPE. 3 1 3 LOA Holder & Safety Officer Yes
such as safety clothing (CAT – 2 uniform), major injuries all PPE used by employees as per standard All damaged PPE must be discard from use
electrical& work specific gloves, safety shoes, and no damage. Should be provide CAT-2 uniform
face masks etc. Check & ensure that PPE are inspected
Safety shoes, coverall, safety helmet, safety
goggle/dust mask

Non Availability of Fire Extinguisher If not eliminate fire immediately it may increase • LOA Holder & Safety officer must be 3 2 6 • LOA Holder & Safety officer conduct 3 1 3 LOA Holder & Safety Officer Yes
and lead to fatality, burn and property loss ensuring that correct types of fire Weekly/Monthly Fire extinguisher training
extinguishers are available on site. and keep record.
• Ensure all fire extinguishers are inspected
and tagged by certified fire warden.

Unavailability of certified and competent first It may be resulted Increase the severity of • Ensure the third party certified and 3 3 9 • Do not demobilize the first aider until the 3 2 6 LOA Holder & Safety Officer Yes
aider injury / fracture competent first aider available in work area job completed.
at whole time. • First aiders valid third party certificated
should be available in site

Unavailability of certified and competent fire If not eliminate fire immediately it may increase • Ensure the certified and competent fire 3 3 9 • Do not demobilize the certified fire fighter 3 2 6 LOA Holder & Safety Officer Yes
fighter. and lead to fatality, burn and property loss fighter available in work area at whole time. until the job completed.
• Fire wardens & fire fighters valid third
party certificated should be available in site.

2
Unavailability of first aid kit It may be resulted Increase the severity of • LOA Holder & Safety officer must be 3 3 9 • First aid kit location should be 3 2 6 LOA Holder & Safety Officer Yes
injury / fracture. ensuring that first aid kit (with all required communicated to all workforce.
utilities) are available on site.
• Should be inspect the first aid kit before
commencing the work.
• Third party certified first aider must be
inspect the first kit regularly.

No safe distance has been established from Contact with energized equipment can lead to • Ensure personnel involved on this task are 4 3 12 Ensure all temporary and permanent 4 1 4 LOA Holder & Safety Officer Yes
energized equipment Risk of fire, Fatality, electrocution, burn etc well briefed about the safe distance which barricading are in place.
maintained from the energized substation Ensure all warning signs are in place.
equipment

Barricading and warning signage not provided. Unauthorized entry into the restricted areas • Ensure all temporary and permanent 4 3 12 If required provide additional signage and 4 1 4 LOA Holder & Safety Officer Yes
may lead to Risk of fire, falling into floor barricading are in place. barricading around the work place.
opening, Fatality, electrocution, burn etc • Ensure all warning signs are in place.

Not conducting the heat index monitoring at the Extreme temperature in the work place causes • Heat index should be monitored and keep 3 3 9 • Ensure the room temperature is effectively 3 2 6 LOA Holder & Safety Officer Yes
work place fatigue, discomfort and distraction and can updated register. controlled inside the buildings.
increase accidents in the workplace Heat • Do not carried out any work outside during
exhaustion. Heatstroke. Muscle cramps. Heat the summer ban timings.
swelling. Fainting • Temperature measuring devise should be
calibrated and kept valid third party
certificates in site.

Workforce unaware about emergency Lack of awareness about emergency • LOA Holder & Safety officer Ensure 4 3 12 LOA Holder and safety officer make ensure 4 1 4 LOA Holder & Safety Officer Yes
plan/evacuation plan, RA, JSP, MS, PTW etc plan/evacuatio n plan, RA, JSP, MS, PTW etc lead emergency response plan & RA, JSP, MS, that all documents prepared by competent
to personnel injuries and property damage and PTW etc is established and discussed to the person and emergency plan / evacuation
loss of company reputation workforce before commencing the work plan, RA, JSP, MS, and PTW etc is approved
activity. and understood by all.
• Should conduct periodic mock drills.
• LOA holder must be ensured that the During the TBT Task supervisor must discuss
assigned persons are competent for the task the emergency procedure.
and to handle any emergency situation.
• LOA holder must ensure that all emergency Informing all employees through TBT location
response equipment are available (Fire of First aid kit, emergency contact and
alarms, Hooters, Flash Alarms Etc) and hospital rout.
working properly.
• Approved emergency procedure must be
reviewed before every activity.
• Trained first aider should be deployed to
act during emergency situation.
• Safety orientation must be given to all
personnel before entering the site and need
to discuss emergency procedure.

Physically & medically unfitted workforce. Weak personnel can lead there life and others • Should be conduct periodic medical 3 3 9 Medical history records should be retain In 3 1 3 LOA Holder & Safety Officer Site Security Yes
life into endanger can cause Major / minor examination & ensure all the work force are work place.
injury, Health issues. fit for do the task

3 Mobilization of Tools & Plumbing Work carried out without the presence of LOA Absence of LOA holder & safety officer • Ensure LOA holder & safety officer always 4 3 12 • It should be ensured by site security, SEC 4 1 4 LOA Holder & Safety Officer Site Security
materail holder / Safety Officer/First aider/Fire fighter supervision can cause to Major Minor Injury available during the working hours. authorized personnel’s and consultants.
Property loss. • Ensure First aider & Fire fighteralways
available during the working hours and do
not demobilize them until work completed.
• Should be maintain entry exit log book and
updated without any delay.

Unauthorized personnel or vehicle entry. Contact with energized substation facilities may • Vehicle details to be checked by site 4 3 12 • Should be assigned trained security person 4 1 4 LOA Holder & Safety Officer Site Security Yes
Absence /inefficient security check resulted Major /minor injury. Damage to security including driving license. on entrance.
materials & property. Tress pass without • Vehicle must have S3 approval. • Shall be retained exit entry log book
permission and valid documents lead to legal • Personnel with SEC ID/S7 only to enter the
actions. substation.

3
Unauthorized entry into restricted areas. Contact with energized substation facilities may • Safety orientation must be given to all 4 3 12 • Should be comply with site speed limits. 4 1 4 LOA Holder & Safety Officer Site Security Yes
resulted Electrocution, electric shock, Fatality personnel before entering the site. • Must be given site orientation for new
Major or minor injury Property damage. • Give site road awareness and traffic rules employees.
to operator/driver. • After the shifting vehicles to be park
• Should be familiar with road traffic signs outside the substation.
and restricted areas inside the site.
• Ensure the safe distance from substation
installations.
• Do not cross the barricaded area.

Absence of tools inspection before site entry. It may resulted Major or minor injury Property • LOA holder should ensure all the tools & 3 3 9 • All equipment and tools register to be 3 1 3 LOA Holder & Safety Officer Site Security Yes
damage. equipment are inspected and color coded retained in work area.
and it is good for the intended use. • All the damaged tools and homemade tools
• Do not allow any homemade tools and must be rejected by security personnel while
altered equipment. entering the site.
• Heavy equipment used on the site should
have valid third party certification
• LOA holder, Safety officer & site security
should be visually inspect the boom truck
before enter to the site.

Used of dilapidated vehicle for shifting May resulted vehicle collision with substation • Before entering to the site vehicle 3 3 9 • Ensure vehicle valid insurance documents 3 1 3 LOA Holder & Safety Officer Site Security Yes
facilities or personnel can cause to Major or condition must be checked with pre-defined and maintenance documents are available
minor injury Property damage Fire checklist. (Tyre, break, condition Etc.) with vehicle.
• Not allowed any dilapidated vehicle inside
the site.
• Vehicles should have Government valid
registration documents and it should be
available with vehicles.

Wrong manual handling techniques It may be resulted Back pain. Muscle strain Back • Follow right manual lifting techniques and 2 4 8 • Designate location for unloading of 2 2 4 LOA Holder & Safety Officer Yes
injury Etc. Awkward postures may be lead to tools for the job/ use mechanical handling personnel and materials be stored only on a
muscle strain. where ever possible. designated storage area
• LOA holder must communicate to the work
force regarding safe chemical and manual
handling methods.
• Where ever possible should be performed
mechanical handling.

Uncontrolled Pedestrian and vehicle May lead to hit by vehicle lead to fatality, Major • Safety orientation must be given to all 4 3 12 • Segregate the pedestrian movements from 4 1 4 LOA Holder & Safety Officer Yes
movements or minor injury, property damage. personnel before entering the site. vehicle movements’ area.
• Give site road awareness and traffic rules • Should observe road speed limits.
to operator/driver. • All personnel must follow pedestrian route
• Should be familiar with road traffic signs in the site while walking in the substation.
and restricted areas inside the site.
• Ensure the safe distance from substation
installations.
• Do not cross the barricaded area.

Inadequate temporary storage May resulted Major or minor injury Property • All material location and storage shall be 3 3 9 • Temporary storage place should be away 3 1 3 LOA Holder & Safety Officer Yes
losses due to trip with scattered materials barricaded and provided with adequate from walkways & energized equipment
signage • Tools and materials temporarily
stored in right place with sufficient
barricading

Working without wearing appropriate Personal May resulted Electrocution, Fatality, Electric • Task supervisor to conduct daily pre-start 4 3 12 • Damaged PPE must be disposed properly. 4 1 4 LOA Holder & Safety Officer Yes
Protective Equipment (PPE) shock, Burn, injury meeting prior to work commencement and
discuss TBT and JSP with his team.
Supervision & Monitoring. • Required
adequate PPE and it should be inspected
before commencing the work. (Hart Hat,
Gloves ,goggles, shoe/dust mask/CAT-2
uniform)

4 Set-up the work Work carried out without the presence of LOA Absence of LOA holder & safety officer • Ensure LOA holder & safety officer always 4 3 12 • It should be ensured by site security, SEC 4 1 4 LOA Holder & Safety Officer Yes
holder / Safety Officer/First aider/Fire fighter supervision can cause to Major Minor Injury available during the working hours. authorized personnel’s and consultants
Property loss • Ensure First aider & Fire fighteralways
available during the working hours and do
not demobilize them until work completed.
• Should be maintain entry exit log book and
updated without any delay.

Job performing by incompetent workers or Incompetent personnel can lead there life and • Work to be carried out by trained and 4 3 12 • Work to be carried out by trained and 4 1 4 LOA Holder & Safety Officer Site Security Yes
plumbers . others life into endanger can cause Major / competent electrician with adequate competent electrician with adequate
minor injury, Health issues. supervision. supervision.
• Before starting the work must conduct pre • Before starting the work must conduct pre
task assessment / TBT and keep the task assessment / TBT and keep the
attendance. attendance.

4
Used of uninsulated hand tools & equipment. Contact either electricity through uninsulated • Ensure all the equipment & tools properly 3 3 9 • Do not uses and uninsulated tools or 3 2 6 LOA Holder & Safety Officer Site Security Yes
tools may resulted Electric shock, Fire, burn, insulated. equipment and it should be replace with
property loss etc. • Competent personnel need to inspect the adequate one.
condition before commencing the work and
ensure it is free from damage.

Use of defective / altered hand tools. (Screw Inappropriate usage of damaged or altered hand • Periodical inspection / color coding for all 4 2 8 • Do not allow any defective / homemade 4 1 4 LOA Holder & Safety Officer Site Security Yes
driver, stripper Pliers, etc.) tools may resulted Major or minor injury, wrist hand tools hand tools at site
& hand muscle strains and may damage to the • Wear and use the issued hand protection • Provide updated color coding.
property • Use appropriate hand tools for the work • Provision of good tool boxes
• Hand tools stock must be sufficient
• Facilitate and conduct hand tool training

Absence of barricading & signage. Contact with test equipment’s may resulted • Identify the area need to barricaded and 4 2 8 • Should be communicated to other 4 1 4 LOA Holder & Safety Officer Site Security Yes
Electric shock Major or minor injury And provide adequate barricading. interested parties about the testing job
disturbance of testing activity. • Should be posted warning signs and before commencing.
awareness posters in noticeable area. • While power injecting time one personnel
• Ensure all barricading are in good should monitor the injection kit area
condition.
• Do not allow any personnel entry into the
barricaded area without permission and
adequate safety measures

Wrong manual handling methods It may be resulted Back pain. Muscle strain Back • Follow right manual handling techniques 2 3 6 • Do not lift unsecured load by hand 2 1 2 LOA Holder & Safety Officer Site Security Yes
injury Etc. Awkward postures may be lead to • Should be uses ergonomic friendly tools for • Use nitrile gloves for manual handling.
muscle strain the job/ use mechanical handling where ever
possible.
• LOA holder and safety officer must
communicate to the work force regarding
safe manual handling methods.
• Use adequate manpower for job.

Ergonomic hazards, awkward or sustained Repeated and force full exertion can cause to • Assess all the Ergonomic hazards and 2 3 6 • Avoid repetitive movements (Bending, 2 1 2 LOA Holder & Safety Officer Site Security Yes
postures, forceful exertion, strain, Musculoskeletal disorders (MSD) communicated to the workforce. twisting) while removing the panel
Repetitiveness and pace of work. • Should provide sufficient manpower for
testing kit set-up.

work near energized equipmentl / Live Contact with energized panel may cause electric • Panels and distribution boards must be 4 3 12 • Certified electrician information should be 4 1 4 LOA Holder & Safety Officer Site Security Yes
equipment . shock resulting skin burns, electrocution or secure with popper cover posted at each DB's / panels
fatality • Keep the panel door locked and closed • Should be identified the tags from cable
Appropriate warning signs / labels must be and temporary segregated with warning
affix onto the panel door tapes and signs ‘Don’t Touch’ .
• Padlock and tags must be provided for all •Non-conductive ladder must be procided if
panels and distribution board need to work near energized equipment
•Isolate the energized equipmet (if possible)
while working near to equipment
• Facilitate electrical safety training and
LOTO procedures
• Only authorized person is allowed to
operate and service all panels and DB's
• Metal Ladders are not allowed in sub-
station area

Working without wearing appropriate Personal May resulted Electrocution, Fatality, Electric • Task supervisor to conduct daily pre-start 4 3 12 • Damaged PPE must be disposed properly. 4 1 4 LOA Holder & Safety Officer Site Security Yes
Protective Equipment (PPE) Especially working shock, Burn, injury meeting prior to work commencement and
without wearing CAT 2 uniform. discuss TBT and JSP with his team.
Supervision & Monitoring.
• Required adequate PPE and it should be
inspected before commencing the work.
(Hart Hat, Gloves ,goggles, shoe/dust
mask/CAT-2 uniform)

Poor Waste & Garbage management (Cable , Can lead to Fire due to ignition of combustible • LOA Holder and safety officer must ensure 4 3 12 • LOA Holder and Safety officer check on 4 1 4 LOA Holder & Safety Officer Site Security Yes
general waste etc.) materials which accumulated , and Pollution , enough dustbin are available. daily basis that peoples are following waste
diseases, and suffocation injuries- loss of • Cable cut pieces should be segregated and and garbage management system and
material- loss of time - loss of company kept in a closed container until removing ensure clearly information and instruction
reputation from site. given the working personnels.. • Ensure
proper provision of PPE like mask,, gloves,
goggles, CAT-2 uniform etc. while performing
the Housekeeping

5
5 Marking and drilling of walls of the • Awkward position due to minimal space ·  Back pain (muscular injury)·       • Observed proper posture during marking 3 3 9 • Close supervision required supervisor and 3 2 6 Naveed /Ahmed /Abduallah khan YES
building • Repetitive motion such as leaning and  ·   Ill health of holes foreman must be present at the site.
reaching • Work rotation of workers • In-house training to be given to the
• Provide and use or appropriate PPE (clear workers for the specific activity
glass, hard hat, safety shoes, hand gloves
etc.)

• Congested area (Struck to adjacent • Striking of body parts (elbow, head)to the • Ensure proper working position during 4 2 8 • Supervisor/ foreman to ensure proper and 4 1 4 LOA Hoder,safety officer and engineer YES
structures/objects adjacent structures/object can result in physical pulling of cable. As much as possible avoid safe working area for their personnel.
injury working in the congested area. • All materials must be placed in a
• Contacts with sharp & protruding materials/ • All workers engaged in the task must be designated area.
objects can lead to anybody injury provided with required personal protective
equipment at all times.
• Use of complete PPE (hard hat, goggles,
safety shoes, gloves)

• Working at Elevated Area • Serious personal injury/fatality from falling • Obtain valid Work at Height Permit to 4 3 12 • Use of MEWP like manlift, scissor lift etc. if 4 2 8 LOA Hoder,safety officer and engineer YES
• Fall of tools & materials can result in serious Work available and applicable.
physical Injury • Reduced the working at height if possible • Supervisor/foreman must identify areas
to eliminate fall hazards. with risk of falling are provided with suitable
• Ensure fall prevention (toe boards, hand fall prevention.
railings) & protection equipment (i.e. full • Worksite Supervisors to closely monitor the
body harness) are inspected and color-coded activity & recommends precautionary
to ensure safe use. measures if the unsafe act or unsafe
• Provision of scaffolding platform, lifeline, condition have been noted during the course
and anchorages if necessary. of the work
• The working area must be provided with • Provide Working @ Heights training to the
proper access (ladders) and reachable by personnel involved in working at heights.
workers, installation of work platform if • Loose materials must be secured by
possible. Shortcut not allowed. buckets.
• Materials and tools shall be properly • The unwanted& surplus material shall be
secured to prevent from falling. Provision of removed.
lashing. • Affected area shall be barrier off with
• Ensure adequate fall prevention like toe appropriate safety signage" Overhead Works
boards are provided.
• Good Housekeeping standards within the
area must be maintained & observed as the
job progresses & at the end of the shift.

• Fall from ladder The risk of falling resulting to personal and head Check condition of steps prior to working – 4 3 12 Provide suitable base. 3 2 6 LOA Hoder,safety officer and engineer Yes
injuries Check treads, feet of steps, rivets, screws, Ensure ladder is footed and does not
platform, locks, handholds, etc. exceed75o angle.
Do not use steps on uneven and sloping Ensure Ladder has proper feet.
ground Confirm that stays, chains or cords
Do not use steps for works higher than that are in good condition.
recommended for the steps supplied. Ladder should be 3 step above from landing
If going above 4 steps high, steps to be area
footed by second person. TBT should be conducted before start the
Do not use steps if possible on slippery work
ground or floors – dry them where possible. Metal Ladder is not allowed at energized
Do not work at height in storms or strong substation if requred used non conductive
winds ladder that is reduce the risk of electricution
Only one person on the stepladder at any Safety officer,supervisor ,LOA holder should
one time, do not exceed loading rating of be monitor the activity
steps. USed Maintaince trolley instead of ladders
Do not over-reach. Work only within safe for executing the plumbing work (where
reaching distance and keep your belt buckle applicable)
within the styles of the stepladder.
Carrying the tools on ladders are not allowed

6
• Improper usage of drill/cutting machine • Severe physical injuries (hand, arm, electric • Only a trained and competent person shall 3 3 9 • Refresher training for the competent 3 2 6 Naveed /Ahmed /Abduallah khan YES
shock) be assigned for the use of power tools. workers in handling power tools
• Site supervisors presence during the • All defective tools must be brought to store
execution of work for a replacement.
• All portable tools must be inspected prior
to being used.
• Regular inspection of tools and equipment
to be carried out

• Dust particles exposure • Respiratory diseases (i.e.cough, asthma) • LEV (local exhaust ventilation), blower or 2 4 8 • Training in proper usage of PPE 2 2 4 Naveed /Ahmed /Abduallah khan YES
industrial exhaust fans should be provided • Regular maintenance of LEV/blower/fans
for the indoor activity mobilized on site.
• Dust control by moistening the location of
holes to be drilled with water
• Appropriate dust mask to be worn by
workers

• Excessive noise • Tinnitus • Conduct noise survey to determine the 2 3 6 • Refresher training for the competent 2 2 4 Naveed /Ahmed /Abduallah khan YES
earplug/earmuff capacity to be provided workers in handling power tools
• Provision of suitable ear protection to the • Regular inspection of tools and equipment
user. to be carried out
• Training in proper usage of PPE

• Cutting/drill machine may overheat (could • Damaged to properties, severe injuries, • Adequate fire extinguishers and fire 3 3 9 • Regular maintenance of tools and 3 2 6 Naveed/Ahmed/Abduallah khan YES
cause or start a fire) fatality blanket should be provided in the working equipment to be carried out
area. • Continuous housekeeping in the area to
• Use of lubricant/coolant when drilling to remove all combustible materials.
avoid burns, damaged of the equipment.
• Appropriate PPE to protect the user from
sparks (face shield, cove all, apron)

• A worker wearing loose clothing • Entanglement resulting to hand or arm injury • No loose clothing and remove all jewelry 3 3 9 • Provide Power Tools Training to the 3 1 3 LOA Hoder,safety officer and engineer YES
• To prevent being entangled on the rotating workers.
part of the tools. • Close supervision required supervisor and
• Handle must be fixed to the drill machine foreman must be present at all times.
to achieve a stable and good grip.

6 Installation of Plumbing System pipes • Plumbing materials was improperly stored at • The risk of slip and trip, falling of materials • To provide appropriate racks and box for 2 3 6 • Continuous safety training and awareness 2 2 4 LOA Hoder,safety officer and engineer
site resulting to physical injuries and property all plumbing materials related to the material stacking
damage • Plumbing should be tied when in piles • Provide proper demarcation for the
storing materials
• Consider the recommended height when • Assign with appointment letter the store
storing of materials keeper
• Stack materials with their classification • Records and registry for In and Out of the
• All construction materials shall be properly materials
arranged and segregated
• Provide proper access, identification and
warning signs in the store yard
• Compliance with 8 - SEC Mandatory Rules

7
• The presence of materials with sharp object • Contact with sharp edges may cause personal 2 3 6 • All hand tools must be in good condition 2 2 4 LOA Hoder,safety officer and engineer
(sheet, metal pieces, steels, etc.) at the and hand injuries • Full superivsion from the supervisor / and inspected
workplace foreman is required for this activity • Plan and concut the Plan Job Observations
• Wear the issued appropriate hand to the workers
protection • Improve the housekeeping at the site
• All object with sharp edges should be
remove at site immediately
• Proper procedures shall apply during
dismantling
• Provide appropriate bins for object with
sharp edges
• Proper posture must be observed during
the activity
• Compliance with 8 - SEC Mandatory Rules

• The workplace for cutting, grinding, etc. is not • Ejected particles may cause personal injury • The workplace shall be provided with 2 3 6 • Portable / movable barrier shall be 2 2 4 LOA Hoder,safety officer and engineer
isolated and skin burns sufficient barriers (steel) provided
• Approved procedure for cutting, grinding, • Supplemental barrier like fire blanket shall
etc. must be followed and posted be provided and considered
• Mandatory PPE's shall be posted in the • All rotating parts must be guarded
area • Provide appropriate ventillation and
• Use only the right the tools / equipment extraction
for the assign task
• Appropriate signage shall be posted in the
area
• All workers shall comply and use the
issued PPE's
• Compliance with 8 - SEC Mandatory Rules

• The workers are expose to excessive noise • Continuous exposure to high noise may cause • Workers involved for the assembling 2 3 6 2 2 4 LOA Hoder,safety officer and engineer
generated by the operating equipment nearby hearing impairment or loss plumbing system shall be provided with • Ensure sufficient stocks of PPE's
hearing protection • To procure and provide equipment for
• Earplugs or earmuff shall be worn properly measuring the noise
to effectively reduce the noise to permissible • Continuous safety training and awareness
level related to hearing protection
• Good planning and scheduling of workers
to lessen the exposure
• To initiate noise survey and rectify any
issues and concerns
• Facilitate and conduct training related to
noise and its requireds PPE's.
• Mandatory signage for PPE's shall be
posted at the workplace
• Compliance with 8 - SEC Mandatory Rules

• The electrical cables, ropes, hose, etc. just • The risk of slip and trip resulting to hand and • To remove all unwanted cables, ropes, 2 3 6 • Consider to suspend / hang the cables, 2 2 4 LOA Hoder,safety officer and engineer
lying on the ground without protection personal injuries hose, etc. at the site if not intended for use. ropes, hose, etc. when in service
• Initiate good housekeeping before, during • Close coordination between the other
and after each day of work teams/group working in the area
• Consider to dig and burried the cables, • Do not leave unattended materials after
hose, etc. to prevent the tripping hazards each day of work
• All cables, ropes, hose, etc. must be
provided by any protection when passing to
another area
• Compliance with 8 - SEC Mandatory Rules

• The portable electrical equipment (electric • Contact with the open wiring may cause • Conduct periodical inspection / color 3 3 9 • Conduct safety training for portable 3 2 6 LOA Hoder,safety officer and engineer
drill, grinder, etc.) have no periodical inspection electric shock resulting to skin burn or even coding for all electrical equipment electrical equipment
fatality • Wear the issued appropriate PPE’s at site • Quarantine box for all damage electrical
• All electrical parts must be properly equipment
guarded • Ensure sufficient stocks of needed electrical
• Only certified electrical engineer / equipment
electrician can perform the inspection • Records and registry for all inspected
• All portable electrical equipment must electrical equipment
have identification or tagging system
• Compliance with 8 - SEC Mandatory Rules

8
• The presence of controlled / unprotected • The risk of falling resulting to personal and • Ensure that all scaffolding platform are 3 2 6 • All hand tools in elevated area must be 3 1 3 LOA Hoder,safety officer and engineer
falling object (rubbish, bolts, nuts, stones, etc.) head injuries complete with planks and toe boars tied-off
on the elevated area • Initiate good housekeeping before, during • Housekeeeping competition must be done
and after each day of work • To improve the safety monitoring at the
• Do not store any unattended materials on site
top of the platform
• All materials on top must be properly
secured and tied-off
• Use proper materials bag/basket when
hoisting any materials
• All access must be free from any
obstruction
• Compliance with 8 - SEC Mandatory Rules

• Fall from ladder The risk of falling resulting to personal and head Check condition of steps prior to working – 4 3 12 Provide suitable base. 3 2 6 LOA Hoder,safety officer and engineer Yes
injuries Check treads, feet of steps, rivets, screws, Ensure ladder is footed and does not
platform, locks, handholds, etc. exceed75o angle.
Do not use steps on uneven and sloping Ensure Ladder has proper feet.
ground Confirm that stays, chains or cords
Do not use steps for works higher than that are in good condition.
recommended for the steps supplied. Ladder should be 3 step above from landing
If going above 4 steps high, steps to be area
footed by second person. TBT should be conducted before start the
Do not use steps if possible on slippery work
ground or floors – dry them where possible. Metal Ladder is not allowed at energized
Do not work at height in storms or strong substation if requred used non conductive
winds ladder that is reduce the risk of electricution
Only one person on the stepladder at any Safety officer,supervisor ,LOA holder should
one time, do not exceed loading rating of be monitor the activity
steps. USed Maintaince trolley instead of ladders
Do not over-reach. Work only within safe for executing the plumbing work (where
reaching distance and keep your belt buckle applicable)
within the styles of the stepladder.
Carrying the tools on ladders are not allowed

• Falling objects The risk of falling resulting to personal ,head Use lifting appliances such as hoist lines or 3 3 9 Use a tool belt. Be wary of awkward/heavy 3 2 6 LOA Hoder,safety officer and engineer Yes
injuries and materail ropes. loads, changes to centre of gravity as load is
raised.

•work near energized equipmentl / Live Contact with energized panel / equipment may •Isolate the energized equipmet (if possible) 4 3 12 •Non-conductive ladder must be procided if 4 1 4 LOA Holder & Safety Officer Site Security Yes
equipment for fixing the cooper drain at GIS cause electric shock resulting skin burns, while working near to equipment need to work near energized equipment
emergency exit door conopies electrocution or fatality • Facilitate electrical safety training and •LOA holder, safety officer and concerned
LOTO procedures engineer should monitor the activty
• Metal Ladders are not allowed in sub- • TBT should be conducted before start the
station area and near energized equipment work
• site manager and project manager should
provide
• Ladders should be placed 3 meter away
from the energized equipment

Working without wearing appropriate Personal May resulted Electrocution, Fatality, Electric • Task supervisor to conduct daily pre-start 4 3 12 • Damaged PPE must be disposed properly. 4 1 4 LOA Holder & Safety Officer Site Security Yes
Protective Equipment (PPE) Especially working shock, Burn, injury meeting prior to work commencement and
without wearing CAT 2 uniform. discuss TBT and JSP with his team.
Supervision & Monitoring.
• Required adequate PPE and it should be
inspected before commencing the work.
(Hart Hat, Gloves ,goggles, shoe/dust
mask/CAT-2 uniform)

9
7 installtion of cooper drain and Sealant • The workers working on an incomplete • The risk of slip and fall from the elevated • Scaffolding platform must have complete 4 3 12 • Scaffolding inspector must have valid 3 2 6 LOA Holder & Safety Officer Yes
Application upside conopies scaffolding (including mobile) platform for workplace that will result to serious injury, components (railings, bracing, boards, certification.
sealant application works broken bones or fatality access, etc.). • Scaffolding platform shall only erected,
• Scaffolding platform inspection perform by modified and dismantled by the certified
the scaffolding supervisor. scaffold erectors.
• Tagging system of the scaffolding platform. • All access ladder must have appropriate
tag.
• All involve personnels must undergo and
passed the working at height training.
• Only use approve and in good physical
state of scaffolding materials.
• Ensure sufficient stocks of approved
scaffolding materials.

• The scaffoldiong platform (including the • Unauthorized access may cause slip and fall 4 3 12 • Scaffolding inspector must have valid 3 2 6 LOA Holder & Safety Officer Yes
mobile) has no inspection tag or not updated from the elevated workplace that will result to • Scaffolding supervisor conduct inspection certification.
serious injury, broken bones or fatality to the complete scaffolding platform. • Ensure sufficient stocks of inspection tags
• Inspection tag (Red or Green) must be and marker.
provided to all access ladder of the inspected • Details in the inspection tag must be
platform. completed, including the loading the
• Periodical inspection and update of capacity.
inspection tag for all scaffolding platform.

• Workers step outside on the scaffolding • The risk of slip and fall may results to serious • Supervisor / foreman must instruct all 3 3 9 • Scaffolding platform should modify by the 3 2 6 LOA Holder & Safety Officer Yes
platform injury, and broken bones workers only to work inside the working certified erectors as per the activity wise.
platform. • Continuous monitoring from the safety
• All workers must follow all the instructions personnel and supervisor.
from the supervisor. • Continuous safety training and awareness
related to working at heights.

• Workers working in elevated area (above • The risk of slip and fall from the elevated • Issuance of personal fall arrest system for 3 3 9 • Close monitoring from the safety 3 2 6 LOA Holder & Safety Officer Yes
1.8m) has no personal fall arrest system - full workplace that will result to serious injury, workers working in elevated areas. personnel, supervisor and foreman.
body harness with double lanyard with shock broken bones or fatality • Supervisor / foreman must ensure that all • Ensure sufficient stocks of personal fall
absorber workers are wearing their respective arrest system.
personal fall arrest system. • Periodical replacement for all defective
• Compliance with the tagging system of the personal fall arrest system.
inspected scaffolding platform. • Only procure and use the approve personal
fall arrest sytem.

• Workers was misused the personal fall arrest • The risk of slip and fall may results to serious • Supervisor / foreman must ensure that all 3 3 9 • Continuous monitoring from the safety 3 2 6 LOA Holder & Safety Officer Yes
system while working in elevated area (above injury, broken bones or fatality workers are wearing their respective personnel, supervisor and foreman.
1.8m) personal fall arrest system properly. • To issue disciplinary action for violating
• Discuss the associated hazards related to safety rules.
the working at heights through daily toolbox • Involve workers must have valid working at
meeting. heights certification.

• Workers working in elevated areas (above • The risk of slip and fall may results to serious 4 3 12 • Continuous monitoring and supervision 3 2 6 LOA Holder & Safety Officer Yes
1.8m) are not securing the lanyard's hook to injury, broken bones and fatality • All workers working in elevated areas must from the supervisor and safety personnel.
anchor. comply to 100% tie-off or securing to anchor • Continuous safety training and awareness
the lanyard's hook. related to working at heights.
• Supervisor / foreman should supervise the • Ensure the availability of platform railing,
elevated works and check the behavior of anchorage point or lifeline.
workers for compliance.

• Workers working in elevated areas (above • The risk of slip and fall may results to serious 4 3 12 • Ensure that the Working at Heights 3 2 6 LOA Holder & Safety Officer Yes
1.8m) have no valid certification for Working at injury, broken bones and fatality • All workers working in elevated areas must certification are valid and updated.
Heights have working at height certification. • Working at Heights training shall only be
• Supervisor and safety personnel should facilitated and conducted by the accredited
check and verify the documents / and recognized company.
certification. • Administration personnel should process
• Copies of certification must be available at the renewal of the training before the
site or attach on the PTW. expiration date.

• Workers working in elevated areas (above • Poor judgement of the workers may cause slip 3 3 9 • Ensure that the medical certification of 3 2 6 LOA Holder & Safety Officer Yes
1.8m) have no valid medical certification of and fall may results to serious injury, broken • All workers working in elevated areas must fitness are valid and updated.
fitness bones and fatality have medical certifiation of fitness. • Medical certification of fitness shall only be
• Supervisor and safety personnel should issued by the medical practitioner.
check and verify the documents / medical • Administration personnel should process
certification. the renewal of the training before the
• Copies of medical certification must be expiration date.
available at site or attach on the PTW.

10
• Performing sealant application of precast in a • The risk of slip, trip and fall resulting to 3 3 9 • Lay out of the illumination system should 3 2 6 LOA Holder & Safety Officer Yes
poorly lit workplace physical injuries or broken bones • Provide sufficient illumination system to be prepared by the electrical engineer
the work place. • Corrective action if the lighting survey
• Initiate in conducting illumination survey. deviate from the requirement.
• Illumination system should be prepare and • Ensure sufficient stocks of lighting fixture /
install by the competent electrician. accessories.
• Ensure the workplace must be out of
dazzlingly light and shadows and glare.

• Fall from ladder The risk of falling resulting to personal and head Check condition of steps prior to working – 4 3 12 Provide suitable base. 3 2 6 LOA Hoder,safety officer and engineer Yes
injuries Check treads, feet of steps, rivets, screws, Ensure ladder is footed and does not
platform, locks, handholds, etc. exceed75o angle.
Do not use steps on uneven and sloping Ensure Ladder has proper feet.
ground Confirm that stays, chains or cords
Do not use steps for works higher than that are in good condition.
recommended for the steps supplied. Ladder should be 3 step above from landing
If going above 4 steps high, steps to be area
footed by second person. TBT should be conducted before start the
Do not use steps if possible on slippery work
ground or floors – dry them where possible. Metal Ladder is not allowed at energized
Do not work at height in storms or strong substation if requred used non conductive
winds ladder that is reduce the risk of electricution
Only one person on the stepladder at any Safety officer,supervisor ,LOA holder should
one time, do not exceed loading rating of be monitor the activity
steps. USed Maintaince trolley instead of ladders
Do not over-reach. Work only within safe for executing the plumbing work (where
reaching distance and keep your belt buckle applicable)
within the styles of the stepladder.
Carrying the tools on ladders are not allowed

• The presence of controlled / unprotected • The risk of falling object may results to head • Ensure that all scaffolding platform are 3 3 9 • Do not store any unattended materials on 3 2 6 LOA Holder & Safety Officer Yes
falling object (rubbish, bolts, nuts, stones, etc.) and physical injuries complete with planks and toe boards. top of the platform.
in the elevated area • Initiate good housekeeping before, during • Use proper materials bag/basket when
and after each day of work. hoisting any materials.
• All materials on top must be properly • Supervisor and foreman must ensure that
secured and tied-off. proper housekeeping has been done before
leaving the workplace.
• All access must be free from any
obstruction / object.
• All hand tools in elevated area must be
tied-off.
• To improve the safety monitoring at the
site.

• Used of substandard personal protective • The risk of falling may results to fatality due to • Issuance and replacement of personal 4 3 12 • Only issued the appropriate and approve 3 2 6 Yes Yes
equipment (PPE) substandard PPE (personal fall arrest system). protective equipment (PPE). PPE's to all workers.
• Safety personnel, supervisor and store • PPE's should conform to the following
keeper should not allow to issue or use the specification such as fall protection set
substandard PPE. (EN1497 & EN 361 AND EN 358 OR ANSI
Z359), etc.
• Refer to PPE SPECIFCATIONS 2018 - 2019
OHS-SP-002-01 for more details and
information.

• The risk of head,hand and personal injuries • Issuance and replacement of personal 3 2 6 • Only issued the appropriate and approve 2 1 2 LOA Holder & Safety Officer Yes
due to substandard PPE. protective equipment (PPE). PPE's to all workers and staff.
• Safety personnel, supervisor and store • PPE's should conform to the following
keeper should not allow to issue or use the specification such as safety shoes (EN 345,
substandard PPE. ANSI Z 41), high-visibility vest (ANSI 107:2004
and EN471:2003), safety helmet (ANSI Z89.1-
2014 CLASS E), safety glass (EN166, ANSI
Z87.1-2010/ EN 166:2001), work gloves ( EN
420: 2003), etc.
• Refer to PPE SPECIFCATIONS 2018 - 2019
OHS-SP-002-01 for more details and
information.

11
• Chemicals (paint, silicon , etc.) stacked / • Hot temperature may cause a fire resulting to 3 3 9 • Designated stacking area must be shaded 2 2 4 LOA Holder & Safety Officer Yes
stored under the spot of the sunlight. property damage or explosion • Do not store / stacked any chemicals under and provide appropriate ventilation
the direct sunlight. • Separate flammable and combustible
• To identify and designate temporary materials from other storage items to
stacking area at the site, provide isolation prevent greater damage
and warning signs • Limit the chemical's volume at site,
• Supervisor and foreman should check and mobilize only as per daily usage
secure the chemicals • Continuous safety training and aware
related to chemical handling

• Workers are expose to chemical (paint, slicon, • Inhaling the vapors may caused toxic effect to • All workers engage in painting must be 2 3 6 • Continuous safety training and awareness 2 2 4 LOA Holder & Safety Officer Yes
etc.) during handling and application of paint multiple organ systems, and even resulting to provided with required and appropriate related to chemical safety training.
lung cancer personal protective equipment (PPE) at all • Chemical MSDS copy must be available at
times. site and first aid room for immediate
• Immediate clean water in the container reference.
must be provided • Information and details of MSDS should be
• Supervisor / foreman should check and shared to all workers through daily toolbox
verify all the issued PPE's. meeting.
• Contaminated clothing and safety glass
should immediately remove.

• The presence of controlled / unprotected • The risk of falling resulting to personal and • Ensure that all scaffolding platform are 3 2 6 • All hand tools in elevated area must be 3 1 3 LOA Hoder,safety officer and engineer
falling object (rubbish, bolts, nuts, stones, etc.) head injuries complete with planks and toe boars tied-off
on the elevated area • Initiate good housekeeping before, during • Housekeeeping competition must be done
and after each day of work • To improve the safety monitoring at the
• Do not store any unattended materials on site
top of the platform
• All materials on top must be properly
secured and tied-off
• Use proper materials bag/basket when
hoisting any materials
• All access must be free from any
obstruction
• Compliance with 8 - SEC Mandatory Rules

• Fall from ladder The risk of falling resulting to personal and head Check condition of steps prior to working – 4 3 12 Provide suitable base. 3 2 6 LOA Hoder,safety officer and engineer Yes
injuries Check treads, feet of steps, rivets, screws, Ensure ladder is footed and does not
platform, locks, handholds, etc. exceed75o angle.
Do not use steps on uneven and sloping Ensure Ladder has proper feet.
ground Confirm that stays, chains or cords
Do not use steps for works higher than that are in good condition.
recommended for the steps supplied. Ladder should be 3 step above from landing
If going above 4 steps high, steps to be area
footed by second person. TBT should be conducted before start the
Do not use steps if possible on slippery work
ground or floors – dry them where possible. Metal Ladder is not allowed at energized
Do not work at height in storms or strong substation if requred used non conductive
winds ladder that is reduce the risk of electricution
Only one person on the stepladder at any Safety officer,supervisor ,LOA holder should
one time, do not exceed loading rating of be monitor the activity
steps. USed Maintaince trolley instead of ladders
Do not over-reach. Work only within safe for executing the plumbing work (where
reaching distance and keep your belt buckle applicable)
within the styles of the stepladder.
Carrying the tools on ladders are not allowed

• Falling objects The risk of falling resulting to personal ,head Use lifting appliances such as hoist lines or 3 3 9 Use a tool belt. Be wary of awkward/heavy 3 2 6 LOA Hoder,safety officer and engineer Yes
injuries and materail ropes. loads, changes to centre of gravity as load is
raised.

12
•work near energized equipmentl / Live Contact with energized panel / equipment may •Isolate the energized equipmet (if possible) 4 3 12 •Non-conductive ladder must be procided if 4 1 4 LOA Holder & Safety Officer Site Security Yes
equipment for fixing the cooper drain at GIS cause electric shock resulting skin burns, while working near to equipment need to work near energized equipment
emergency exit door conopies electrocution or fatality • Facilitate electrical safety training and •LOA holder, safety officer and concerned
LOTO procedures engineer should monitor the activty
• Metal Ladders are not allowed in sub- • TBT should be conducted before start the
station area and near energized equipment work
• site manager and project manager should
provide
• Ladders should be placed 3 meter away
from the energized equipment

Working without wearing appropriate Personal May resulted Electrocution, Fatality, Electric • Task supervisor to conduct daily pre-start 4 3 12 • Damaged PPE must be disposed properly. 4 1 4 LOA Holder & Safety Officer Site Security Yes
Protective Equipment (PPE) Especially working shock, Burn, injury meeting prior to work commencement and
without wearing CAT 2 uniform. discuss TBT and JSP with his team.
Supervision & Monitoring.
• Required adequate PPE and it should be
inspected before commencing the work.
(Hart Hat, Gloves ,goggles, shoe/dust
mask/CAT-2 uniform)

8 Demobilizatio n of extra material from Work carried out without the presence of LOA Absence of LOA holder & safety officer • Ensure LOA holder & safety officer always 4 3 12 • Should be maintain entry exit log book and 4 1 4 LOA Holder & Safety Officer Yes
sub -station holder / Safety Officer/First aider/Fire fighter supervision can cause to Major Minor Injury available during the working hours. • Ensure updated without any delay. • It should be
Property loss First aider & Fire fighteralways available ensured by site security, SEC authorized
during the working hours and do not personnel’s and consultants.
demobilize them until work completed.

Job performing by incompetent work force. Incompetent personnel can lead there life and • Work carried out by trained and 4 3 12 • Never allow an untrained person to 4 1 4 LOA Holder & Safety Officer Yes
others life into endanger can cause Major / competent work force with adequate operate equipment without adequate
minor injury, Health issues. supervision. instruction.
• Before starting the work must conduct pre • Have to follow safe system of work at all
task assessment / TBT and keep the time
attendance

Vehicle and personnel exit not register into the It may be resulted Penalties & Legal actions • Vehicle entry should be register on the log 3 3 9 It should be ensured by Security staff, LOA 3 1 3 LOA Holder & Safety Officer Yes
logbook. book holder & safety officer.

Pickup driver has not valid SEC ID,s It may be resulted Penalties & Legal actions The driver should have valid SEC ID. • 3 3 9 Security personnel make sure the availability 3 1 3 LOA Holder & Safety Officer Yes
Always SEC ID should kept with him. of SEC ID’sbefore entering to the substation.

Vehicle and has no S3 approval It may be resulted Penalties & Legal actions. • Should be gained approved S3 document 3 3 9 Security personnel make sure the availability 3 1 3 LOA Holder & Safety Officer Yes
for vehicle before commencing the work. • of valid S3 documents before entering to the
Always keep S3 documents with vehicle substation

Vehicle parked in unauthorized area inside the Parking in unauthorized area may contact with • Vehicle must parked in the designated 4 2 8 Parking place should be identified before and 4 1 4 LOA Holder & Safety Officer Yes
substation energized equipment and it may lead to parking area. • Do not park in unauthorized provide barricading and signage.
Electrocution Electric shock Major Minor Injury areas like below the overhead line area, bus
Property loss bar passages, near transformer, near
bushing/jumpering area etc.

13
Vehicle driver has not SAG vehicle license Vehicle drive by non-licensed personnel may hit • The driver should have valid SAG vehicle 4 2 8 Security personnel make sure the availability 4 1 4 LOA Holder & Safety Officer Yes
to the energized equipment, substation facilities driving license. • License should kept with of driving license and license category before
or other personnel’s can cause to Electrocution him entering to the substation
fatality Major Minor Injury Property loss as well
as lead to legal actions

Absence of road traffic signs/driver is not aware Unawareness about traffic signs may resulted • The driver should be oriented about the 4 3 12 Should be follow the site speed limits and 4 1 4 LOA Holder & Safety Officer Yes
about the road traffic rules & signs inside the vehicle hit on the substation facilities that lead site traffic rules and signage before entering traffic rules.
substation. to Electrocution Electric shock Major Minor to the site. • He can understand the signs &
Injury Property loss pictograms which are used inside the
substation premises.

Unsecured items on the vehicle May resulted materials fall from vehicle can lead • Before going to outside the site ensure the 4 3 12 • All the loose items secured in a carry bags 4 1 4 LOA Holder & Safety Officer Yes
to Major Minor injury Property loss tightness of fastening belt is still alright. and should be tie off with vehicle

9 Housekeeping Poor Housekeeping and non-removal of Can lead to Fire due to ignition of combustible LOA Holder and safety officer must ensure 3 3 9 LOA Holder and Safety officer ensure 3 1 3 LOA Holder & Safety Officer Yes
undesired materials inside the materials which accumulated , and Pollution , enough dustbins are available and proper provision of standard PPE used during
substationgenerated by work inspection diseases, and suffocation injuries- loss of disposal of rubbish material. Informed all housekeeping (mask, Gloves, Helmet, Safety
material- loss of time - loss of company concern personnel through TBT that make shoes etc.. Keep permanent cleaner at site.
reputation housekeeping on daily basis. Used proper Good communication orientation / TBT.
garbage beg to takeout of rubbish material LOA Holder and Safety personnel ensure that
from site. do not stacked different kind of material,
• LOA Holder & Safety personnel must tools and equipment on same spot.
ensure and having knowledge about stacking
of material, equipment and tools. Allocate
separate area for stacking of material, tools
& equipment. • Barricade area and posted
safety sign board. Around stacking
Poor stacking/materials and equipment left over Trip by scattered materials can cause to falls • Good housekeeping & Stacking should be 3 2 6 Supervisor should ensure the stacking and 3 1 3 LOA Holder & Safety Officer Yes
in the workplace. may lead to Scratches, bruises or fracture maintained & followed. • Daily TBT regarding housekeeping and every day before
housekeeping is a must completion of work asks the work to do
housekeeping and remaining materials
should be stacked properly. 2. Ensure
removal of all undesired materials and
garbage inside substation

10 Closing activity and Handing Over. Fail to change the firefighting suppression Property Damage due to loss of FM 200 Gas • LOA holder must be ensured the fire 4 2 8 Safety Officer also should recheck the fire 4 1 4 LOA Holder & Safety Officer Yes
system from Manual to Automatic suppression system changed from manual to suppression system changed from manual to
automatic automatic.
• Negligence from the LOA Holder must be
verified by safety Personnel to check and SEC engineer also should be ensured the fire
follow energized substation protocol. suppression system changed from manual to
automatic.

14
suffocation - breath problem due to unaware • Tool Box Talk about hazard FM 200 and how to 3 2 6 Safety officer should be in place and guide 3 1 3 LOA Holder & Safety Officer Yes
about how to escape respond in case of emergency the employees evacuate in case of
emergency.
Ensure all persons made knowledge about
Emergency response and it should be
exercised.
Provide adequate PPE for employees.

Unauthorized person entry due to forgot to lock Electrocution and property damage due to • LOA holder should ensure the gates are 4 3 12 Ensure LOA holder that all of the workers 4 1 4 LOA Holder & Safety Officer Yes
the gate unknowingly touch the live parts Arson or closed properly before handing over the key left the substation before closing the gate.
intentional unsafe acts resulting damage to to SEC
client property Safety Officer also should recheck gate
Forget to inform about the work completion to Major injuries or fatality and property damage • LOA holder or safety officer must inform 4 3 12 •closed
Ensureproperly.
LOA holder that all of the workers 4 1 4 LOA Holder & Safety Officer Yes
SEC CRCC & SEC Safety Department. due to unknowingly touch the live parts. SEC CRCC once work is completed, • LOA left the substation before closing the gate.
Damage to client property due to not following holder or safety officer must inform SEC – • Safety Officer also should recheck gate
the protocol of energized substation Safety team once the work is completed closed properly

Page 1 of 1 Rev.2 [08-April-2019] Projects Business Unit

15
RA Prepared by : RA Accepted by : RA Approved by SEC / Safety Rep: RA Aprroved by SEC-HV&EHVPD:
Name & Sign: Muhammad Tayib Name & Sign: Alla abu farhan Name & Sign Name & Sign
Desgination: HSE officer Desgination:Site manager Desgination Desgination
Date: 3/18/2020 Date: 18/03/2020 Date Date