MANAGEMENT
By
UNIVERSITY OF GAZİANTEP
DEPARTMENT OF CIVIL ENGINEERING
CHP 9-PROJECT PLANNING
& SCHEDULING
• INTRODUCTION
• SCHEDULING THROUGHOUT THE PROJECT
• Pre-construction Planning,
• Scheduling during Construction,
• Post construction Scheduling
• THE PLANNING AND SCHEDULING PROCESS
• SCHEDULING METHODS
(Bar Chart , Matrix Schedules, Network Schedules)
• CREATING THE SCHEDULE
• CONCLUSION
2
Learning Objectives
3
Introduction-1
In project management, a schedule is the tool most
commonly used to plan the project step by step. By
systematically analyzing each activity and its
relationship to the ones that come before and after
it, the project manager can build the project on
paper before committing resources to it.
Schedules are essential to successful execution of any
complex project.They are not unique to construction
industries, including business, manufacturing and
publishing.
Schedules are particularly useful when companies
undertake multiple projects that use common resources.
4
Introduction-2
5
Introduction-3
Schedules establish the start, duration and
completion dates of project or task.
They let people and organizations know in advance
when expect a certain action to take place.
Contractors and suppliers to stay profitable, have
many jobs that must be organized and planned.
Start and completion date of particular job is
essential information because it allows them to
determine whether or not the job can be
accomplished in the context of their other work.
6
Introduction-4
Scheduled start dates determine when goods or
services need to be brougth to the job site, when
a work force needs to be mobilized and, When
equipment rental begins. This date is critical to
the accurate pricing of the project.
There are times, howewer, when contractors want
key materials delivered early to eliminate the risk
of holding up the project because of delays in
either fabrication or delivery.
7
SCHEDULING
THROUGHOUT PROJECT
Preconstruction Planning
Scheduling is a key activity during preconstruction
stage. Project financing commitment to tenants
and market projections all depend on
understanding the scheduled start and
completion. The only way to accurately predict
whether or not the required completion dates
can be met is using a schedule.
The earlier the dates are projected, the earlier the
owner can be make a choice based on those
dates.
8
SCHEDULING
THROUGHOUT PROJECT-2
During preconstruction, The first schedule is
assembled with little information.
As the project evolves, managers will continually
refine the schedule to optimize the project
activity duration, creating efficiencies in time and
money.
The initial schedule is a tool for the project team to
begin to make intelligent management desicions.
In summary scheduling during preconstruction
provides the project team with necessary
information to properly plan and coordinate the
entire desing/build process. 9
Scheduling during
Construction-1
Project schedules are essential to the succesful
coordination of a project’s day-to-day activities.
Material deliveres, equipment, and people are all
orchestrated through the schedule. As a project
progress, delays inevitably occur.
The project manager’s job is to effectively deal with
these delays and to anticipate them as much as
possible. If problems never occured on a project, the
project manager’s role would be less critical.
It is intelligent response to bad weather, equipment
failures, strikes, design errors and omissions that
seperates the well-managed project from disaster.10
Scheduling during
Construction-2
A CPM schedule may record the actual daily activities
at the site.
The schedule often is placed on the wall of the job
site trailer, where it is clearly visible to all trades
people. The project manager can graphically record
progress,often with coloured markers and symbols.
Schedule record issues for the day, but it can help
the manager anticipate future problems.
This information may also be essential to succesfully
negotiating a future change order or a claim.
11
Postconstruction
Scheduling
As a project nears completion, the ultimate
user becomes more involved in the
constrution process.
In many projects the owner begins to occupy
the facility during construction. This partial
occupancy must be closely scheduled,
requiring weekly meetings to coordinate
the constrution work with the tenant
improvement work necessary to allow
occupancy.
12
Postconstruction
Scheduling-2
An important function for the project team is to
close the books on the project. if the people
and companies involved are to learn from the
project experience they must record its actual
events.
Unplanned events such as coordination
difficulties, production rate differences or
delivery delays should all be recorded.
Record keeping is also important in case of
future claims or disputes.
13
PLANNING AND
SCHEDULING PROCESS-1
14
PLANNING AND
SCHEDULING PROCESS-2
16
PLANNING AND
SCHEDULING PROCESS-4
18
PLANNING AND
SCHEDULING PROCESS-6
19
PLANNING AND
SCHEDULING PROCESS-7
20
PLANNING AND
SCHEDULING PROCESS-8
21
SCHEDULING METHODS
23
SCHEDULING METHODS-3
Lay foundation
Build house
Select paint
Select carpet
Finish work
1 3 5 7 9
Month 26
Bar Chart
Schedules-2
27
Bar Chart
Schedules-4
In summary, bar charts are excellent communicators of
time-related project information.
They are quick and easy to develop and understood by
most people.
Their major limitation is that interpendencies among
activities can not be shown. Thus, complicated
management decisions should be made using other,
more thorough scheduling methods.
28
Matrix Schedules-1
23
22
21
Intermediate
Floors
4
The metal studs follow the concrete
3
slab and precede the electrical conduit.
2
B 30
Matrix Schedules-2
31
Matrix Schedules-3
A matrix schedule is a good tool for controlling field
activities because it can be posted at the field office
and update as the work proceeds.
Superintendents can easily colour in the boxes as the
work is accomplished to provide a more visiual
picture of the job’s progress. For persons
responsible for a specific trade are able to critique
their own progress in relation to related work.
Most project people can find a specific task on the
schedule and see due date and the activities that
precede and succeed the task..
32
Network Schedules-1
33
Network Schedules-2
Procure steel
36
Procure
formwork
Procure
Steel
40
CREATING SCHEDULE-1
Activity Definition
Activities divided into three categories:
a) Production: includes on site construction of the
project.
b) Procurement: track the material from the supplier
to the job site. This includes the preparation and
approval of submittals and the manufacturing and
shipping of the material to the site.
c) Administration: include inspections, permits, and
other government or bureaucratic activities that
must occur on a project. schedules are generally
created by first identifiying all activities, organizing
the work by discipline, area, and/or project phase. 41
Network Diagram
42
Network Diagram-2
47
Calculations-1
The scheduling calculations are performed to
answer the following questions:
1. What is the project’s duration?
2. What are the start and finish date for
the project activities?
3. Can a project activity be delayed?If so,
how long?
48
Calculations-2
57
Conclusion-1
58
Conclusion-2