S.N.

DIV Activity ID Activity Name

MAIN BULIDING
SITE WORKS
EXCAVATION AND EARTHWORKS
2 10 SITE PREPARATION
2 20 EXCAVATION
2 30 Remove surplus excavated material from site to approved location
2 40 250mm soil replacement under the raft slab including make
2 50 Backfill into structure, layer by layer including compaction
2 60 ANTI - TERMITE TREATMENT under
CONCRETE WORKS
SUBSTRUCTURE
3 80 100 mm thick blinding
3 90 50mm thick cement sand screed, for waterproof protection
3 100 Laid horizontally
3 110 Raft foundation,
3 120 retaining wall
3 130 Columns
3 140 Core wall
3 150 Suspended Solid Slab
3 160 Slab on grade
3 170 Ramp on grade
3 180 Plinth wall Including Footing
SUPER-STRUCTURE
3 190 grounf floor Columns & walls
3 200 grounf floor Solid Slab
3 210 FIRST FLOOR Columns & walls
3 220 FIRST FLOOR Solid Slab
3 230 SECOND floor Columns & walls
3 240 SECONDfloor Solid Slab
3 250 Roof floor Columns & walls
3 260 Roof floor Solid Slab
3 270 top Roof floor Columns
3 280 top Roof floor Solid Slab
3 290 parapet
MASONRY
4 300 ground floor walls
4 310 first floor walls
4 320 second floor walls
4 330 roof floor walls
4 340 top roof floor walls
METALWORK
5 350 Aluminum balustrade & handrail for staircases
5 360 Handrail for main entrance & ramp
5 370 Aluminum Cladding
5 380 Flag pole's
5 390 Cage ladder
5 400 aluminium Belt
5 410 aluminium Coping
5 420 steel structure for lift shaft roof
5 430 Stainless steel grating in ablution area
WOODWORK
6 440 counter at Ground floor
6 450 counter at First floor
6 460 Shoe Rack
6 470 KITCHEN cabinets-Basement Floor.
6 480 KITCHEN cabinets-Ground Floor
6 490 KITCHEN cabinets-First Floor
THERMAL & MOISTURE PROTECTION
7 500 polyethylene sheet, 1000 Gauge
7 510 ROOFING SYSTEM
7 520 external walls
7 530 under footing water proffing
7 540 under foundation water proffing
7 550 waterprofing for WET AREAS for basment floor
7 560 waterprofing for WET AREAS for ground floor
7 570 waterprofing for WET AREAS for first floor
DOORS AND WINDOWS
8 580 basment floor doors frames
8 590 ground floor doors frames
8 600 first floor doors frames
8 610 second floor doors frames
8 620 roof floor doors frames
8 630 installion basment floor doors
8 640 installion ground floor doors
8 650 installion basment floor doors
8 660 installion second floor doors
8 670 installion roof floor doors
8 680 DETAINEES CELL FRAME
8 690 Steel Doors
8 700 ALUMINUM WINDOWS frames
8 710 ALUMINUM WINDOWS frames
8 720 CURTAIN WALL
8 730 GLASS PARTITION
FINISHES
basment floor
flooring
9 740 Marble Floor Tile
9 750 Flamed Granite
9 760 Ceramic floor tiles
9 770 Porcelaine floor tiles
9 780 Self Leveling floor Epoxy
9 790 Vinyl Floor Sheet with 6mm thick rubber underlay
9 800 Terrazzo Tiles
9 810 Precast Cement
Skirting
Ceramic Skirting
Porcelaine Skirting
Terrazzo Skirting
Wooden Skirting
Marble Skirting
Mason
B.O.Q Description Qty Unit Rate % Amount Prod./Unit Man Days
Plasterer Tiles Mason Painter Carpenter Steel Fixer
Prod./Unit Man Days Prod./Unit Man Days Prod./Unit Man DaysProd./UnitMan DaysProd./Unit
Steel Fixer Doors&Wind Technician Metal Work Electrical Work Mechanical Work Fire Fighting Work
Man DaysProd./UnitMan DaysProd./UnitMan DaysProd./UnitMan Days Prod./Unit Man DaysProd./Unit
Fire Fighting Work Conveying System Labor/Helper Total
Man DaysProd./UnitMan DaysProd./UnitMan Days