You are on page 1of 5

1 2

A
DR-
20690
3981

400 889 1831 889 400 3800 4804 5797 719

E E
460
3408
3804

3804
400

DN
D D
855

D4

2950
11208

11579
TERRACE
19.07 X 11.21
6352

19070

4900
443

1193 1882 1821 2231 1701 1800 7843


3988 457
20430

1 2 TOP FLOOR PLAN


A
DR-

Security Camera Layout


Detailed Engineering Sub-soil Exploration work for the Designed By Ruby Bajracharya
KRISHI GYAN KENDRA
DEVELOPER PROJECT preparation of Architectural & Structural Design, Drawing and SCALE AS SHOWN
Dhangadhi, Kailali Drawn By Aarju Jha
cost estimate of Office Building
SAIPAL ENGINEERING CONSTRUCTION AND Checked By Prayush Rajbhandari
CONSULTANT CONSULT NEPAL PVT. LTD. TITLE Electrical Drawings DRAWING NO. 20
Dhangadhi, Kailali Approved By Murli Shah
450
250
250x250x300mm
(LxBxH) Manhole 100 SS 304 Cover Plate
Finish GL Finish GL
Brick wall
100x50x6mm (LxBxT)
300
CCTV-18 CCTV-1 Electrode Terminal
200x50x6mm (LxBxT) Earth
50
CCTV-19 CCTV-2 bars with 14mm dia holes

Cement concrete
CCTV-20 CCTV-3
CCTV-21 40 PORT NVR CCTV-4
CCTV-22 CCTV-5
CCTV-23 CCTV-6
Backfilled with Dry
CCTV-24 CCTV-7 Loose soil 2000

CCTV-25 CCTV-8
CCTV-26 CCTV-9 C.C.M (Anti-Corrosive
Conductive Compound)
CCTV-27 CCTV-10
Inner Pipe dia= 38mm
CCTV-28 CCTV-11 Outer Pipe dia= 76mm
GI Electrode
CCTV-29 CCTV-12
CCTV-30 CCTV-13
Perforated Removable
CCTV-31 CCTV-14 PVC Pipe

CCTV-32 CCTV-15 Earth Pit

CCTV-33 CCTV-16 200


1000
CCTV-34 CCTV-17
G.I. CHEMICAL EARTHING PIT INSTALLATION DIAGRAM

NOTE:
1. All dimensions are in mm.
2. Dimension of CI manhole cover plate is 370x370x3mm(LxBxT).

CCTV LAYOUT Procedure for mixing of a Compound:


1. Take a half bucket of water and pour the chemical inside the bucket and thoroughly mix the
backfill with the help of hands.Ensure no granules are left and mixture is properly mixed.
2. Remove tapes and plastic cover from the electrode and place the electrode into the pit.
3. The electrode shall be placed inside the removable Perforated PVC Pipe.
4. Removable perforated PVC Pipe shall be 2 mm thick of suitable dia (with reference to size of
electrode).
5. Start pouring the mixture of backfill inside the removable perforated PVC Pipe. Completely
empty the backfill thoroughly mixed with water into the pit. Ensure full bag of chemical is
consumed in one pit.
6. Pour water until it comes to the top of the pit.
7. Remove the PVC Pipe after pouring of chemical and Water are completed.

Detailed Engineering Sub-soil Exploration work for the Designed By Ruby Bajracharya
KRISHI GYAN KENDRA
DEVELOPER PROJECT preparation of Architectural & Structural Design, Drawing and SCALE AS SHOWN
Dhangadhi, Kailali Drawn By Aarju Jha
cost estimate of Office Building
SAIPAL ENGINEERING CONSTRUCTION AND Checked By Prayush Rajbhandari
CONSULTANT CONSULT NEPAL PVT. LTD. TITLE Electrical Drawings DRAWING NO. 21
Dhangadhi, Kailali Approved By Murli Shah
6 sq mm Cu 6 sq mm Cu
Wire Wire

6 sq mm Cu
Wire

6 sq mm Cu
Wire

FDB1 FDB2 FDB3

Detailed Engineering Sub-soil Exploration work for the Designed By Ruby Bajracharya
KRISHI GYAN KENDRA
DEVELOPER PROJECT preparation of Architectural & Structural Design, Drawing and SCALE AS SHOWN
Dhangadhi, Kailali Drawn By Aarju Jha
cost estimate of Office Building
SAIPAL ENGINEERING CONSTRUCTION AND Checked By Prayush Rajbhandari
CONSULTANT CONSULT NEPAL PVT. LTD. TITLE Electrical Drawings DRAWING NO. 22
Dhangadhi, Kailali Approved By Murli Shah
N1 N2 N3 N4 N5 N6 N7 N8 N9 N10 N11 N12 N13
T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12 T13 N N N N N N N N N N N N N
13 POINTS IN
13 POINTS IN SECOND FLOOR
SECOND FLOOR

N1
T1 N
1 POINT IN
1 POINT IN FIRST FLOOR
FIRST FLOOR

CAT 6 CABLE
N1 N2 N3 N4 N5 N6 N7 N8 N9 N10 N11 N12
T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12 N N N N N N N N N N N N
12 POINTS IN
12 POINTS IN GROUND FLOOR
GROUND FLOOR

MAIN TELEPHONE 24 PORT SWITCH DATA RISER DIAGRAM


JUNCTION BOX
TELEPHONE RISER DIAGRAM

S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13


M S S S S S S S S S S S S S
13 POINTS IN
SECOND FLOOR
FIRST FLOOR

S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13


M S S S S S S S S S S S S S
13 POINTS IN
FIRST FLOOR
FIRST FLOOR

S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12


M S S S S S S S S S S S S
12 POINTS IN
GROUND FLOOR
GROUND FLOOR
1.5 sq. mm
copper cable
3 ZONES PANEL
FACP
220V UPS LINE
SINGLE LINE DIAGRAM OF
ADDRESSABLE FIRE ALARM SYSTEM

Detailed Engineering Sub-soil Exploration work for the Designed By Ruby Bajracharya
KRISHI GYAN KENDRA
DEVELOPER PROJECT preparation of Architectural & Structural Design, Drawing and SCALE AS SHOWN
Dhangadhi, Kailali Drawn By Aarju Jha
cost estimate of Office Building
SAIPAL ENGINEERING CONSTRUCTION AND Checked By Prayush Rajbhandari
CONSULTANT CONSULT NEPAL PVT. LTD. TITLE Electrical Drawings DRAWING NO. 23
Dhangadhi, Kailali Approved By Murli Shah