MATERIAL TAKE OFF HAZARDOUS

A. DATA STRUKTUR

Gambar - Model Struktur

B. MATERIAL TAKE OFF

3
No Profil Berat (ton) BJ Vol. (m )
1 K_30X30 4.33 2.4 1.80
2 S_30X50 7.93 2.4 3.30
3 S_25/30 0.90 2.4 0.38
4 B_30X50 10.81 2.4 4.50
5 B_25/30 0.90 2.4 0.38
6 S-12 16.15 2.4 6.73
7 S-15 20.18 2.4 8.41
Jumlah Luas Tebal
8 F1_150/150 6.0 4.00 0.4 9.60
35.10

C. REKAP VOLUME TOTAL


No Deskripsi Unit Qty
1 Pekerjaan Tanah
3
Excavation m 12.75
3
Backfilling m 5.10
3
Sand Fill m 1.25
3
Lean Concrete m 1.25
2 Pekerjaan Beton
3
Concrete m 35.10
Reinforce (300 kg/m3 concrete) kg 10,529.38