B. COMBINATION (FACTORED)
AXIAL LOAD, PU 447.279 KN
BENDING MOMENT, MUY 0 KN.M
BENDING MOMENT, MUX 0 KN.M
C. FOOTING DESIGN
1. TRIAL DIMENSIONS
B 2.7 M
L 2.7 M
T 0.35 M
2. PROPORTIONING OF FOOTING
EFFECTIVE SOIL PRESSURE, QE 69.3596
5. CHECK THCKNESS
A. BY BEAM SHEAR (ONE-WAY SHEAR)
EFFECTIVE DEPTH, D 265 MM
ALLOWABLE SHEAR STRENGTH, VA 270.50371505 KN
CRITICAL WIDTH FOR SHEAR STRESS,X 885 MM
ACTUAL SHEAR FORCE, VU 146.60811667 KN
THEREFORE, THE FOOTING IS SAFE FOR BEAM SHEA
6. STEEL REQUIREMENTS
A. ALONG LONG DIRECTION, L
CRITICAL WIDTH FOR MOMENT CAPACITY 1150
ULTIMATE MOMENT 109.541940278
DESIGN ULTIMATE MOMENT CAPACITY
REINFORCEMENT INDEX 0.03003546835
ACTUAL STEEL RATIO, 0.00228530737
MINIMUM STEEL RATIO 0.00507246377
THEREFORE, USE STEEL RATIO 0.00507246377
STEEL AREA 3629.34782609
NUMBER OF BARS 11.5525729344
SAY 12
B. ALONG SHORT DIRECTION, B
CRITICAL WIDTH FOR MOMENT CAPACITY 1150
ULTIMATE MOMENT 109.541940278
DESIGN ULTIMATE MOMENT CAPACITY
REINFORCEMENT INDEX 0.03003546835
ACTUAL STEEL RATIO, 0.00228530737
MINIMUM STEEL RATIO 0.00507246377
THEREFORE, USE STEEL RATIO 0.00507246377
STEEL AREA 3629.34782609
NUMBER OF BARS 11.5525729344
SAY 12
12 20 mm FOR SERVICE LOA
REINFORCEMENTS
12 20 mm NODE
2
21 MPA
23.544 KN/M3
16 KN/M3
276 MPA FOR ULTIMATE L
20 MM NODE
96 KPA
1.5 M
0.85
400 MM
400 MM 2
1
KPA
FOOTING
AFE FOR BEAM SHEAR
-3583581750 3710590526
0.03003546835 -1.724950723
20 mm bars
-3583581750 3710590526
0.03003546835 -1.724950723
20 mm bars
FOR SERVICE LOAD (UNFACTORED LOAD)
L/C FY MX MY
1 (EQX) 22.068 0 0
2 (EQZ) -28.79 0 0
3 (DL) 243.42 0 0
4 (LL) 94.039 0 0
5 (RLL) 9.426 0 0