Request Date 10/30/2020 Area/ Plant Terminal 3
From: 10/30/2020 BD Tank
Duration of CS Activity 32 days Vessel/ Pit/ Tag No
Until: 11/30/2020 2TK5500A
Section A: Activity Involve & Authorised Entrant Requirement Section C: Required pre-entry ventilation time (minutes)
Scope of work to be completed Maximum Number of Entrants iii. Pre-Entry Ventilation Time, min
1 Pre-Cleaning 8 PAX a) Clean Service Vessel 2.2 Hr
2 Inspection 8 PAX b) Dirty Service Vessel 48.2 Hr
3 Power brush (100% Copper) 8 PAX (Clean Service - eg. Water Tank, Excavation, Steam Drum)
4 Scaffolding 20 PAX (Dirty Service - eg. Dusty, Sticky and Slurry confined space)
5 0 PAX For any activity, Work Supervisor can request for permitting earlier that pre-set Pre-Entry
Ventilation Time if AGTES satisfied with the atmospheric condition
6 2 0 PAX
Section B: Pre-Entry Ventilation Time Section D: Ventilation Capacity
i. Confined Space Dimensions Ventilation equipment used
Cylinder Type A. Type (Portable Ventilator) 24" Blue Power PUSH PULL
Vessel Radius, r m Capacity 18500 m3/hr
1 2
Vessel Length/Height, H m Quantity used 3
Calculated Volume, V 0.000 m3 B. Type (Portable Ventilator) 12" Blower
Cube/ Rectangle Capacity 3720 m3/hr
1 0
Height, H m Quantity used 1
Length, L m Total flow rate 59220 m3/hr 2 2
Wide, W m
Calculated Volume, V 0.000 m3 Is ventilation requirement met?
Total Calculated Volume, Ṿ 5690.000 m 3
Exceeds 56900 m3/hr for 10ACH 104.0773 %
(fill up the total volume (E28) for volume gain from drawing) Exceeds 113800 m3/hr for 20ACH 52.0387 %
ii. Minimum Ventilation Required, Q Exceeds 170700 m3/hr for 30ACH 34.6924 %
3
10 ACH = 56900.000 m /hr Section E: Checklist (please provide the attachment) Tick
3
20 ACH = 113800.000 m /hr a. SDS for Chemical Used/ Chemical Expose
3
30 ACH = 170700.000 m /hr b. Blower specification sheet (from manufacturer)
Cold Work : 10 Air Change per Hour (ACH) c. Equipment/ Vessel drawing
Hot Work : 20 Air Change per Hour (ACH) d. Ventilation diagram
Toxic gas/IDLH : 30 Air Change per Hour (ACH) e. Emergency Response Plan
Ref: FMA; Safety, Health & Welfare Reg 1970; Reg 25; Ventilation
NAME: NAME:
POSITION: POSITION:
DATE: DATE:
Confined Space activity being notified to DOSH (tick √ by LCTM Safety Officer) Date Notify: __________