Doc. No. SE-S-8.1.

2-F04
Page 1 of 1
Ventilation Plan for Confined Space Entry Issue 01
Rev. 01
Request Date 10/30/2020 Area/ Plant Terminal 3
From: 10/30/2020 BD Tank
Duration of CS Activity 32 days Vessel/ Pit/ Tag No
Until: 11/30/2020 2TK5500A

Section A: Activity Involve & Authorised Entrant Requirement Section C: Required pre-entry ventilation time (minutes)
Scope of work to be completed Maximum Number of Entrants iii. Pre-Entry Ventilation Time, min
1 Pre-Cleaning 8 PAX a) Clean Service Vessel 2.2 Hr
2 Inspection 8 PAX b) Dirty Service Vessel 48.2 Hr
3 Power brush (100% Copper) 8 PAX (Clean Service - eg. Water Tank, Excavation, Steam Drum)

4 Scaffolding 20 PAX (Dirty Service - eg. Dusty, Sticky and Slurry confined space)

5 0 PAX For any activity, Work Supervisor can request for permitting earlier that pre-set Pre-Entry
Ventilation Time if AGTES satisfied with the atmospheric condition
6 2 0 PAX
Section B: Pre-Entry Ventilation Time Section D: Ventilation Capacity
i. Confined Space Dimensions Ventilation equipment used
Cylinder Type A. Type (Portable Ventilator) 24" Blue Power PUSH PULL
Vessel Radius, r m Capacity 18500 m3/hr
1 2
Vessel Length/Height, H m Quantity used 3
Calculated Volume, V 0.000 m3 B. Type (Portable Ventilator) 12" Blower
Cube/ Rectangle Capacity 3720 m3/hr
1 0
Height, H m Quantity used 1
Length, L m Total flow rate 59220 m3/hr 2 2
Wide, W m
Calculated Volume, V 0.000 m3 Is ventilation requirement met?
Total Calculated Volume, Ṿ 5690.000 m 3
Exceeds 56900 m3/hr for 10ACH 104.0773 %
(fill up the total volume (E28) for volume gain from drawing) Exceeds 113800 m3/hr for 20ACH 52.0387 %
ii. Minimum Ventilation Required, Q Exceeds 170700 m3/hr for 30ACH 34.6924 %
3
10 ACH = 56900.000 m /hr Section E: Checklist (please provide the attachment) Tick
3
20 ACH = 113800.000 m /hr a. SDS for Chemical Used/ Chemical Expose
3
30 ACH = 170700.000 m /hr b. Blower specification sheet (from manufacturer)
Cold Work : 10 Air Change per Hour (ACH) c. Equipment/ Vessel drawing
Hot Work : 20 Air Change per Hour (ACH) d. Ventilation diagram
Toxic gas/IDLH : 30 Air Change per Hour (ACH) e. Emergency Response Plan
Ref: FMA; Safety, Health & Welfare Reg 1970; Reg 25; Ventilation

1. PREPARED BY: 2. REVIEWED BY: (LCTM WORK SUPERVISOR)

NAME: MOHAMAD NAZMI BIN MOHAMAD RAFIAN NAME:


POSITION: SITE ENGINEER POSITION:
DATE: 20/10/2020 DATE:
3. REVIEWED BY: (LCTM SAFETY) 4. REVIEWED BY: (AREA OWNER - ENTRY SUPERVISOR)

NAME: NAME:
POSITION: POSITION:
DATE: DATE:

Confined Space activity being notified to DOSH (tick √ by LCTM Safety Officer) Date Notify: __________
To attach if applicable
1 ft3/min = 1.699011 m3/h
Note: Print in A3 size
Rescue and Emergency Plan shall include
1. The shape and size of confined space

2. The nature of task to be performed

3. Obstacle within confined space

4. Size and position of the mean of ingress and egress

5. Number of person in confined space

6. No. of standby person required

7. Emergency and Rescue equipment required

8. Communication