Professional Documents
Culture Documents
New Hampshire Department of Transportation: Substructure Details
New Hampshire Department of Transportation: Substructure Details
New Hampshire Department of Transportation: Substructure Details
À BRG. ABUT.
1'-0" MIN
APPROACH
ITEM 538.2
SLAB
(MIN)
2" WASH
PAY LIMITS
ITEM 534.3
1'-0"
ITEM 583.X
(X' THICK)
EMBANKMENT
IN-PLACE
APPROX.
(ROADWAY ITEM)
EXISTING
GROUND
ITEM 209.201
4"Â WEEPER
PAY LIMITS
ITEM 504.1
MODIFY TO
FIT PROJECT
NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION
À BRG. ABUT.
1'-0" MIN
ITEM 538.2
APPROACH
2" WASH
(MIN)
SLAB
PAY LIMITS
ITEM 534.3
1'-0"
ITEM 583.X
(X' THICK)
EMBANKMENT
IN-PLACE
APPROX.
(ROADWAY ITEM)
EXISTING
GROUND
ITEM 209.201
4"Â WEEPER
(1'-0" THICK)
PAY LIMITS
ITEM 504.1
MODIFY TO
FIT PROJECT
NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION
3'-0" MIN.
1'-0"
25:1 MIN
2'-0"
PERFORATED PIPE CAST IN PLACE
ITEM 538.2
(WRAP WITH GEOTEXTILE) COPING (SUBSIDIARY
TO MSE WALL)
IMPERVIOUS MEMBRANE
ITEM 209.5
3'-0"
ITEM 592.1
1'-0"
MIN.
ITEM 508
H
APPROXIMATE
FINISHED
EXISTING GRADE 1'-0"
GRADE
LIMITS OF
ITEM 504.2
4'-6" MIN.
(SEE NOTES)
MODIFY TO
FIT PROJECT
NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION
#XAX
#XAX
#XAXE Û
#X
#XAX á
FS
#XAX
&
#XAX DOW
#XAX
NS
#XAX
(TYP)
MIN
X'-X"
SPL
X'-X"
FS
#XAX
#XAX
&
NS
3"
#XAFX Ò
MODIFY TO
FIT PROJECT
NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION
#XBXE á
#XBXE Û
#XBXE
(APPROACH SLAB
(NS, FS)
DOWEL)
(NS)
#XBX
#XBX
#XBX
(DOWEL) #XBX á
Ü
#XBX
#XBX #XBX
#XBX
#XBX
MINIMUM
(TYP)
SPLICE
X'-X"
#XBFX Ò
MODIFY TO
FIT PROJECT