Notes:: Highways and Airports B.SC Graduation Project 2016
Notes:: Highways and Airports B.SC Graduation Project 2016
Notes:: Highways and Airports B.SC Graduation Project 2016
LUBRICATED SURFACE
FOAM (Compressible material)
H=25cm
EXPANSION JOINT
25 Length 50cm @30cm
RUBBERIZED ASPHALT
TIE BARS @ 30cm
ay
nw
Ru
n
ai
M
ic
Bas
4.0000
Tickets
Service
Tickets
Tickets
Service
Restaurant
Tickets
RIGID PAVEMENT H=25cm
DOWEL BARS
Highways and Airports
DIRECTION OF CONSTRUCTION
Slab 5*5 m
12 /m'
kets
Tic
B.Sc Graduation Project 2016
7
NOTES:
5 1-All drawings should be checked
according to the consultant and
CONTRACTION JOINT
construction limits.
2-The Designed speed is 120 km/hr
for free way and 100 km/hr for
Existing Roads and 60km/hr for
parking road.
3-All Curbs are Standard
Barrier Curbs 12.5*30*15 cm3
ets
4-All Cross slopes are 2% for
T ic k
Symbol Name
RD ROAD
TIE BARS
M Main
S Secondary
LP Loop
CR Curve
P Point
Restaurant
R Ring
STN Station
s
ic ket
T
SUPERVISORS:
DR/MOHAMMED IBRAHEM
LUBRICATED SURFACE
ENG/MAHMOUD EL-HAWARY
Name: Date 9/7/2016
Longitudinal Joint
25 Length 50cm @30cm
DRAWING TITLE:
DOWEL BARS