Professional Documents
Culture Documents
Notes:: Highways and Airports B.SC Graduation Project 2016
Notes:: Highways and Airports B.SC Graduation Project 2016
1
according to the consultant and
J 11
construction limits.
2-The Designed speed is 40 km/h
3-All Horizontal curves are 8m
radius unless otherwise noted.
4-All Curbs are Standard
Barrier Curbs 12.5*30*15 cm
5-All Cross slopes are 2% for
the Carriage way, Median and Sid
walks. KEY WORDS
Symbol Name
RD ROAD
M Main
S Secondary
LP Loop
CR Curve
P Point
R Ring
F.L Finished Level
STN Station
SUPERVISORS:
DR/MOHAMMED IBRAHEM
ENG/MAHMOUD EL-HAWARY
Name: Date 9/7/2016