Closeout Photo Checklist

ALL PHOTOS MUST BE LABELED WITH corresponding Photo # I.e.: 1.jpg, 2.jpg, 3.jpg etc.

TOWER PHOTOS
YES NO N/A Photo Description Notes
1 Overall structure (Pre-Construction) 1 Photo

2 Overall structure (Post-Construction) 1 Photo

3 Each sector (from ground POST) 1 photo each sector

4 Tape Drop (from CL of Antenna) ALL sector PHOTOS MUST BE CLEARLY TAKEN

5 Each antenna W/ SN# & Model# PHOTOS MUST BE CLEARLY TAKEN

6 Each sector from back (must be complete sector with TMAs or other equipment) Minimum 1 photo each sector

7 Antenna Mount/Platform (new installs or when modifications are made) Must supply tape drop CL of mount

8 Coax routing top of tower Refer to SA for proper placement

9 Coax routing base of tower Refer to SA for proper placement

10 Coax routing up & down tower (only when outside tower, SST or Guyed) Refer to SA for proper placement

11 Coax support up & down tower (only when outside tower, SST or Guyed) Refer to SA for proper placement

12 TMA, RRH, RRU, distribution box, Surge Suppressor, Etc. collar/Mount installation Refer to SA for proper placement &
must supply photo of CL
13 TMA, RRH, RRU, distribution box, Surge Suppressor, Etc. installation Refer to SA for proper placement

14 Grounding Tower top, bottom, equipment


location(s)
15 Coax/Grounding Support Refer to SA for proper placement

16 GPS & Coax If on tower tape drop is required

17 Stealth panels before & After MUST HAVE TIME & DATE STAMP

18 WindBands Before & After (for flagpoles) MUST HAVE TIME & DATE STAMP

19 Coax, Antennas, misc. hardware painted


20 Overall carrier lease area MUST be taken from carrier location on
tower looking down at lease area.
21 MUST BE TAKEN FROM LEASE AREA 2
Photo showing equipment is NOT blocking safety climb and or obstructing climb face PHOTOS 1 UP TOWER AND 1 FROM
LEASE AREA ON TOWER LOOKING
DOWN
GROUND PHOTOS
YES NO N/A Photo Description Notes
22 Overall compound photo (Pre-Construction) Minimum 2 photos

23 Overall compound photo (Post-Construction) Minimum 2 photos

24 SBA Gate(s) locked with locks (pre-Construction) MUST HAVE TIME & DATE STAMP

25 SBA Gate(s) locked with locks (post-Construction) MUST HAVE TIME & DATE STAMP

26 Equipment pad/shelter installation MUST supply photos showing size of


pad/shelter and dimensions off of
fence or other equipment.
27 Utilities trench (with conduits) W/tape measure showing depth, and
dimensions off of fence & other
equipment.
28 Landscaping (fabric & stone restored) Minimum 4 photos

29 Ice bridge installation To & from tower

30 Coax routing To & from tower

31 Grounding
32 Generator pad install MUST supply photos showing size of
pad/shelter and dimensions off of

1
33 Generator utilities trench (with conduits) W/tape showing depth, and dist. off of
fence & other equipment.
34 Equipment cabinet/shelter carrier name & ID ALL equipment must be properly
labeled with carrier name & Site ID
35 Overall all carrier lease area (pre) 4 photos minimum 1 from each
direction
36 Overall carrier lease area (post) 4 photos minimum 1 from each
direction
37 Electrical Meter MUST be clear with S/N & Carrier name
plate.
38 Utilities Backboard/H-Frame (Carrier’s Not SBAs) MUST be properly labeled

39 Equipment placed outside of compound Must take photos showing dimensions


off of fence and any other equipment
40 Fence expansion (Pre-expansion)
41 Fence expansion (Post-expansion)
42 MUST show dimensions of expansion
Completed fence expansion with barb wire or razor wire and measurements off of any
equipment
43 MUST have photos of all SBA signs, 1
SBA site sign relocation due to expansion and or relocating gates photo. NO signs permitted on SBA
gates with exception to “Keep Gates
Closed” signs
44 Gate relocation MUST show dimensions of relocation

45 Fence properly grounded Only when expanding fence

Comments/Notes:

Contractor (company Name)

Name (print)

Name (Signature)

Date:

Carrier Site ID:

SBA Site ID: