Download as pdf
Download as pdf
You are on page 1of 3
Ea Metal Roofing JOB SAFETY ANALYSIS: Ref: 06.00 [SOBITASK: Roof Maintenance on a Residential Building DATE: ta1012013, [SUPERCEDES: Ref: 02 Dated 01/06/2010 [Analysis | Revised by: Paul Arksey, Doug Boomer, John Payne [CLIENT NAME & ADDRESS [Permits Competencies Required: National Construction Safety lAwareness Card, Site Safety Manual |EQUIPMENTITOOLS REQUIRED: |PERSONAL PROTECTIVE EQUIPMENT REQUIRED: 4, Site emergencies 5. Working alone lDrit Ships Level ~— ‘Set Square [chise Hammer @ ® [Above PPE to be available and worn as per site requirement RISK LEVEL H = high M = med L = low N_= negligible N]_JOB/TASK STEP POTENTIAL HAZARDS at ‘SAFE WORK / CONTROL MEASURES ma ava, uve 7 [arrive atte 7. Boing on wrong site “T_ Check dosurens and that te adresse corect 2 Occupied residence 2 Une wih resident immediatly upon aval aevse of need {oo ste nspecion ‘Site Hazards - 4. Inapeet te fe entity hazards and complete the Ste Safety Lacerations Report JSA Varaton Foot be competed hazard not Brulsing contol by ts 8A Objects falling from above NOTE: The ik that each fence or wall poses le unique impatement ‘The isk level will depend on several factors including, ‘ee Sipe Weather conations Fences and Walls 4 Dampness or slipperiness of rofing materi L Height and constuction offence ow Design of root DO NOT PROCEED IF YOU ASSESS THAT FALL PROTECTION iS REQUIRED 4. Mobile phone tobe cared in pocket at altimes when on ste 55. Contact office as per working alone procedure 06.00 Metal Roofing Maintenance for Residential Buildings Page 1 of 3 Esa Metal Roofing JOB SAFETY ANALYSIS: Ref: 06.00 ‘Roof Maintenance on a Residential Building DATE: 18/01/2013, 1, Pets ~ agression or stability of 7 Resident to sesure pals ladder 2. Power lines 2. Check clearance to power lines do not place access ladder 3. Electric shock 4 within 3 metres of power or other unidentified cables M 3, access to roof space is required, poner to be tuned off in meter box 3 [Access to roof 1 Strains and sprains 1. Stitching exercise before iting ladder fom venice 2. Fall from ladders 2. Ladder to'be on level compacted ground, check stably of ladder before elmbing up. ‘Only access roof via compliant ladder or va ladder on iy scaffoking, M Use Gutter Guard to secur ladder Do NOT climb up scaffolding to roof or other platform, Ladder not to be used to perform work, Use of tol bets to carry tools is recommended 4 [Working on roof 1 Site Hazards 7 Ae par Ste Safety Repor. +) Dust/ wet oly root (slippery) Consider the following controls, only proceed ifthe risks + Trips Slips acceptable * Antennas, satoite dish, solar + Frequently clean soles of footwear panels ete *Gontinually check surroundings, look out for the root Fences and walls in fall zone ficures + Dornot work above hazard foot is damp or ppery + Do not work close within 2 metres of edge H Do not answer or make phone calls while on roct ” paras 2. Scatfoldng recuired for? storey buldings or worker over ‘Smeties above ground Be aware of weather forecast and monitor conditions eften Refer to Code of Practice forthe Prevention of Falls inthe Workplace for ational guidance if required 3. I sheets fasting to long for worker to manage, call 3 Straloe:ene spraine supervisor and ask for assistance 06.00 Metal Roofing Maintenance for Residential Buildings Page? of 3 JOB SAFETY ANALYSIS: Ref: 06.00 EES28] Metal Roofing [SOB/TASK: Roof Maintenance on a Residential Building 18/01/2033 ' [Egress from roof Fall rom ladders 7 Check stably of ladder before transfering al your weight tof, 1 | Use of toot bets for tools is recomr ™ 6 [Depart ste 11 Slips and tips "1 Be aware that other trades or delveries may have changed site condltions while you were on roof 2. Miscommunication with m_ | 2. Advise resident upon compition i resident 3._Loss of ladder while driving 3._Ensure that ladders secured to vehicle rack Reviewed by joug Boomer, Roofing Manage? A Keith Walker, Disional Manager oar 2/7. oxe LB/3 1, (ort named confirm thet | have read and be 106.00 agree that ail he hazards have been identified and the sks reduced fo as low as reasonably practicable Signed: (06,00 Metal Roofing Maintenance for Residentil Buildings Date: Page 3 of 3 THINK TIDY n Instructed in Job Safety Analysis number

You might also like