Chairvana - Current State: Ques 1: Value Stream Map With Timeline
Chairvana - Current State: Ques 1: Value Stream Map With Timeline
Batch assumption 1(Shown below): Batch is just for moving or storing; Processing time = 30 secs (based on 120/hr flow rate)
Batch assumption 2: 100 are processed as a batch at a time. Flow rate 120/hr; Processing time = (100/120) hr = 50 minutes
Affects first data box (50 mins), timeline, and total (13.625days 3405 sec; 3405 secs)
Weekly
Order
Chairvana - Current State
SteelyHollow MetalForming
Weekly Monthly
Planning forecast BigMart
Order
Weekly
Order
1x 2x
1x
Weekly Weekly
Weekly
2.5 days 3.125 days 3.75 days 3 days 1.25 days 13.625 days 435s
30 s 435 s
60s 120s 180s 45s
Ques 2: Takt time = (Available time/Customer demand) = 2400/2000= 1.2 minutes = 1.2 mins or 72 seconds
Available time = 5 days * 8 hrs* 60 mins = 2400 minutes
Customer demand = 2000 tables
Hole Punching Leg Bending Hinge Assembly Table assembly Packaging Total Process
Time Options
(for Question
#4)
Stations 1 2 2 3 2
Processing time 30 secs or 50 60 sec 120 secs 180 sec 45 sec 7min 25sec
mins (435 sec)
Batch size 1 or 100 1 1 1 1
Cycle time (if 30 secs or 50 30 secs 60 sec 60 sec 22.5 sec
based on legs) min
Cycle time (if 1 minute 1 minute 1 minute 1 minute 22.5 sec
based on tables)
Flow rate 2 tubes/min 2 tubes/min 1 base/min 1 table/min 2.667 tables/min
Demand 1.667/min 1.667/min 0.833/min 0.833/min 0.833/min
Utilization 83.33% 83.33% 83.33% 83.33% 31.25%
Ques 4:
Based on Batch assumption 1:
Total Lead time = 13.625 days and 435 seconds (109 hours and 7.25 mins)
Total Processing time = 435 seconds (7.25 minutes)