Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NAME : LOGANAIYAGEE MANOGARAN

ID :201809040009
DAILY LOGBOOK

Week: 3

Day Duties Performed / Task setting

Monday
To As usual everyday checked emails and revert back to Chief Engineer. Daily I

Friday checked E-log which is Guest Complain during period of staying in Hotel.
Following up Team Members attendance and leaves.

This week, I did Attendance Summary for my Team Members. This week is
salary month and I have to submit to HR. Following up Team Members Annual
Leave and Sick Leave.

Have a small discussion among Team Leader through google meet. Has
spoken regarding Hotel Occupancy % and arrival of the week. I ensure that
engineering team uses equipment safely and efficiently to avoid accidents.

Communicate overall condition of engineering systems to Chief Manager on


regular basis. Assist Team Leader to process vendors enquiries. Assigns and
verifies completion of all repairs, replacement and disposal items. Informs the
Chief Engineer on a regular basis regarding the specific and overall condition of the
building structures related systems and equipment.

Following up Training attendance with Team Leaders. On the Friday, I drop


by to Hotel. I cleaned my office and my working area with my Team. We as Team
planned to create some drawings on the wall. Most probably next week will be
finished up.

You might also like