Tebodin: Match Line A-A Match Line B-B FOR CONT. REF. DWG: ATS003-TK2069-P04-0009 SHT-3 Fuel Gas Compressor 6

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B C D E F G H J K

WARNING
This drawing is an uncontrolled document. The controlled document is available electronically online.
Please check the print date located at bottom right corner.
MATCH LINE A-A MATCH LINE B-B FOR CONT. REF. DWG : ATS003-TK2069-P04-0009 SHT-3
Whilst it is intended that this drawing reflect the current As-built information as at the date of the
drawing, it may contain inaccuracies or omissions including those which arise from subsequent
works. This drawing should not be used as the sole source of information for any work which may
FUEL GAS have implications for safety or operability (for example, buried services, electrical isolations).
COMPRESSOR 6 Actual condition are to be verified by physical measures such as Cat scans, hand excavations
and isolation tests.
8 COPYRIGHT 8
This drawing is confidential and copyright. It must not be copied, used or disclosed to third parties
without EGA's written permission. It remains EGA's property and must be returned on request.

DIMENSIONS / LEVELS / COORDINATES PROJECTION


1. All Dimensions are in mm unless otherwise specified.
2. All Ground Levels, Elevation Levels are in meters.
3. All Coordinates are as per EGA Plant Coordinates (EPCS).

DO NOT SCALE DRAWING. IF IN DOUBT, ASK


KEY PLAN / GENERAL NOTES / LEGEND

7 7

THIS DRAWING

NOTES:

DRAWING LIMIT

DRAWING LIMIT
6 HOLD: 6

Rev. Reference Drawing No. Reference Drawing Title

LEGEND:

5 5
DRAWING LIMIT

DRAWING LIMIT

DRAWING LIMIT

PP

FOR CONT. REF. DWG : ATS003-TK2069-P04-0018 SHT-1 02 29.04.2020 ISSUED FOR CONSTRUCTION SEN SR HR -
01 08.10.2019 ISSUED FOR REVIEW SEN SR HR -
Rev. Date Description Drawn Checked App-1 App-2

PURPOSE OF ISSUE
Code Initial Date

Consultant Logo / Name

29 April 2020 22:06:17


Tebodin Middle East Ltd.
4
TEBODIN P.O. Box 8092, Dubai
United Arab Emirates
4

Consultant Document No. Sheet No. Revision

2661015 1 OF 1 02
Contractor / Supplier Logo / Name

LLC
Post Box: 7323, Dubai, U.A.E, T: +971 4 340 4000, F: +971 4 340 3033
Email: albannae@emirates.net.ae, www.albannaengineering.com

Contractor / Supplier Document No. Sheet No. Revision

ABE-714-PIP-GA-16 1 OF 1 02
Equipment TAG Number :
MATCH LINE B-B
Equipment Description :
3 1. Work may proceed
3
Contractor's drawing review
for conformity with
2. Revise and resubmit. Work may proceed subject to
specifications and design
resolution of indicated comments
drawing.
3. Revise and resubmit. Work may not proceed
This Review does not
4. Review not required or For Information
relieve the Contractor of his
responsibility for errors in 5. As-Built certified
design and detailing as
6. Cancelled
detailed in the contract.
7. Incorporate Mark-ups & submit final As-Built or Certified

Reviewed by : Signature : Date :

Client

2 2

D:\PROJECTS - WFH\11660 - EGA\Piping GA\ATS003-TK2069-P04-0017_02.dwg


Area
2200
Project
RE-ROUTING OF
FUEL GAS LINES IN POWER PLANT

Drawing Title

POWER PLANT
PIPING LAYOUT FOR
CONVEYER AREA
1 1
Area / Facility / Sub Facility : 2000
Scale : 1:100 Dwg.Size : A1 File Name : ATS003-TK2069-P04-0017_02.dwg
Source / Project No. Package No. Document Type Sequence No. Rev.
FOR CONT. REF. DWG : ATS003-TK2069-P04-0001 SHT-4 MATCH LINE A-A
ATS003 TK 2069 P 04 0017 02
A B C D E F G H J K

You might also like