Switch and socket installation in the fourth floor had been done 100%
24
Sanitary fixtures in third floor had been done 40%
25
Fire pump room works had been done 95%
26
Final dropper installation in the third floor had been done 100%
27
Grills and diffusers in third floor had been done 100%
28
CCTV installation in the ground floor had been done 100%
29
CCTV installation in the first floor had been done 100%
30
LPG gas meter installation in the first floor had been done 80%