The weekly report from Alfa Contractor outlines progress made from April 18-25 on a construction project consisting of 2 basements, a gym, and 4 floors. Key activities completed include scaffolding, attic slab formwork, external plaster, boundary wall blockwork, flooring tiles, painting, false ceilings, waterproofing, and MEP works. The report provides status updates on 33 construction activities, with percentages indicating level of completion for each. It was submitted to Renders Engineering Consultant as Report No. 30.
The weekly report from Alfa Contractor outlines progress made from April 18-25 on a construction project consisting of 2 basements, a gym, and 4 floors. Key activities completed include scaffolding, attic slab formwork, external plaster, boundary wall blockwork, flooring tiles, painting, false ceilings, waterproofing, and MEP works. The report provides status updates on 33 construction activities, with percentages indicating level of completion for each. It was submitted to Renders Engineering Consultant as Report No. 30.
The weekly report from Alfa Contractor outlines progress made from April 18-25 on a construction project consisting of 2 basements, a gym, and 4 floors. Key activities completed include scaffolding, attic slab formwork, external plaster, boundary wall blockwork, flooring tiles, painting, false ceilings, waterproofing, and MEP works. The report provides status updates on 33 construction activities, with percentages indicating level of completion for each. It was submitted to Renders Engineering Consultant as Report No. 30.
The weekly report from Alfa Contractor outlines progress made from April 18-25 on a construction project consisting of 2 basements, a gym, and 4 floors. Key activities completed include scaffolding, attic slab formwork, external plaster, boundary wall blockwork, flooring tiles, painting, false ceilings, waterproofing, and MEP works. The report provides status updates on 33 construction activities, with percentages indicating level of completion for each. It was submitted to Renders Engineering Consultant as Report No. 30.
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
CCS ACTIVITY DESCRIPTION
ACT NO. Scaffolding for 1 th elevation had been done 100% 01 Steel & form work for Attic slab for LV room had been done 100% 02 Preparation for external plaster for elevation no 1 had been done 60% 03 Block work for boundary wall had been done 60 % 04 Flooring Tiles work for the fourth floor had been done 100% 05 Flooring Tiles work for the gym floor had been done 100% 06 Flooring Tiles work for wet area in the fourth floor had been done 100% 07 Paint work for walls in the gym floor had been done 90% 08 Paint work for ceiling in the gym floor had been done 90% 09 external paint work for elevation 2 had been done 95 % 10 external paint work for elevation 3 had been done 95 % 11 external paint work for elevation 4 had been done 40 % 12 False ceiling works in the first floor had been done 80 % 13 False ceiling works in the second floor had been done 80 % 14 False ceiling works in the third floor had been done 80 % 15 roof waterproofing had been done 10 % 16 DB Dressing in the fourth floor had been done 100%
DB Dressing in the 1st basement had been done 100%
17 Water heater installation in the gym floor had been done 100% 18 Wire pulling in the ground floor had been done 100% 19 Cable tray installation in the 1st basement had been done 80% 20 MEP services in the substation had been done 100% 21 Water meter room works in the second floor had been done 100% 22
This report must be submitted no later than 9:00 a.m. Sheet 1 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
Sanitary fixtures in the first floor had been done 30%
23 Fire figting pump room works had been done 80% 24 Drainage work in 2nd basement LL had been done 100% 25 FCU (Indoor unit) installation in the gym floor had been done 100% 26 Duct installation in the gym floor had been done 50% 27 CCTV wire pulling in the 1st,2nd,3rd floor had been done 100% 28 Fire alarm devices fixing in third floor had been done 100% 29 Fire alarm device fixing in the fourth floor had been done 100% 30 FACP fixing in the ground floor had been done 100% 31 LPG Riser installation had been done 80% 32
This report must be submitted no later than 9:00 a.m. Sheet 2 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 3 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 4 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 5 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 6 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 7 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 8 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 9 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 10 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 11 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 12 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 13 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 14 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 15 of 16
Weekly report Project: 2B + G + 4Floors + Gym
Contractor: Alfa Contractor Report No : 30
Date 18 – 25 Apr 19 To: Renders Engineering Consultant : Eng. Atef
This report must be submitted no later than 9:00 a.m. Sheet 16 of 16