Construction Cost Calculation: 18 Months
Construction Cost Calculation: 18 Months
Builtup Area
70000ft 2
Approx Cost Per Square Feet
Rs2200.
Cement28000.00 Bags
Sand57120.00 Ton
Aggregate 42560.00 Ton
Steel280000.00Ton
Paint12600.00lt
Bricks560000.00Pcs.
Flooring 91000.00 ft
Approximate cost on various work of material to complete
the construction
for 70000 ft2
Total Cost
=Builtup area×Approx cost per sq. ft.=Builtup area×Approx cost per sq. ft.
=70000×2200=70000×2200
=70000×0.4=70000×0.4
Cement Amount
=16.4100×Total cost=16.4100×Total cost
=16.4100×154000000.00=16.4100×154000000.00
=70000×0.816=70000×0.816
Sand Amount
=12.3100×Total cost=12.3100×Total cost
=12.3100×154000000.00=12.3100×154000000.00
=70000×0.608=70000×0.608
Aggregate Amount
=7.4100×Total cost=7.4100×Total cost
=7.4100×154000000.00=7.4100×154000000.00
=70000×4=70000×4
Aggregate Amount
=24.6100×Total cost=24.6100×Total cost
=24.6100×154000000.00=24.6100×154000000.00
=70000×0.18=70000×0.18
=12600.00 lt=12600.00 lt
Note: Amount of paint required per 1 ft2 = 0.18 lt. & 4.1%
Amount of Paint Required
=Builtup area×8=Builtup area×8
=70000×8=70000×8
Flooring
=Builtup area×1.3=Builtup area×1.3
=70000×1.3=70000×1.3
=16.5100×154000000.00=16.5100×154000000.00
Fittings
=22.8100×Total cost=22.8100×Total cost
=22.8100×154000000.00=22.8100×154000000.00