COVERALL
Feenticl
MATERIALS REQUIRED
American Thread Company “Dawn"*
2 Balls—White
1
Le
hetland Floss.
nC
pine Kaitting N
amment thmuygh the eenter—914
ge 8 sts=I inch
Cost on 58 sts and work in tit
Sth Row. K2* Yam over, K
over, K 2 ungether, P 2, K'2 repeat from * to end of mw
ending with K 2. Work § rows of ribbing. Remainder of
th (K drow, PL
row). Next 4 ewe
Nextrow increase |
every 6th row, until
sow even then deere
on needle,
Work 10
hen inerease
here are 72 ats on needle.
et stea
uch side
one 1
de until there ane 22 sts
ws even then increase 1 st each side until there
1 nceile e 4 rows even.
Next row de.
Next 5 Rows w
Next Row. P 2,
peat from * to end o
bind off, With right s
ts around leg and w
bind off loosely and
Sew seams. Crochet a cord 35
around top and finish eores with
KNITTED CAP
MATERIALS REQUIRED
American Thread Company “Dawn” Pompadour Yarn.
1 Ball Whiteand 1 Rall of Color
1 Pr, Bone Knitting Needles #11
With Whi
and 60 rows bind off loosely.
To make Cap.
White
ast on $0 sts and K 48 rows. Attach
id in half having the eo
fe east on and bound
side, turn on right side
o that seam just made will
m. Sew the twe
the back of eap, Sew
tions together very loo
Tura baek eolor over White for
ap. Lace ribbon thro
for front of
cap to form tie
at lower edge 0 finish with 3 rosebud
1 ilhustrated.