Temporary Structure
1. Suggesion
Engineering Change Request for Providing
(ECR) No. 001 'L' Station
for Dharavi 300mm near Not Submitted to GC.
1 pile toe. Internal Closed by DDC
2. Suggesion for welded and CJV
Splice.
1. Suggesion
Engineering Change Request for 100%
(ECR) No. 002 of bar Station
for Dharavi lapping. Not Submitted to GC.
2 Internal Closed by DDC
2. Suggesion for Tack weld for lapped and CJV
Bars.
1. Removing
Engineering Change Request (ECR) No. L-300mm at the Station
003 for Dharavi Toe of the
Not Submitted to GC.
cage.
3 Internal Closed by DDC
2. Suggesion for
and CJV
terminating L given in 7.00mtr length from
bottom
Engineering Change Request (ECR)
Levels ofNo.
of cage forfor
004
Capping 16M &Grid
17MStation
Dharavi
Beam 1pile.(Drg
to 4(NalaNo. - Not Submitted to GC.
JKC-CAC-SDH-4607-002-A2).
side).
4 Internal Closed by DDC
and CJV
Pile(ECR)
Engineering Change Request No. N46
No. is found
005 to be inside
for Dharavi excavation
Station Not Submitted to GC.
5 face approx-150mm. Internal Closed by DDC
and CJV
Providing
Engineering Change Request 25mm
(ECR) No. 006dia
forbars instead
Dharavi of 32mm
Station
6 Bars.
In Ancillary
Engineering Change Request (ECR) No. 007 for Dharavi Station
Pile(S25,S09,S85,S27,S17,S31.S13,S41,S8 Not Submitted to GC.
7 7,S35,S89,S01,S39,S15,S33,S11,S109,S07, Internal Closed by DDC
S37 & E141 to E113) casted of length less and CJV
than 6M.
Reinforcement
Engineering Change Request cage
(ECR) No. 008 forgot lowered
Dharavi Approx 1 to
Station Not Submitted to GC.
8 1.2 M for Pile No. N-222. Internal Closed by DDC
and CJV
Soft(ECR)
Engineering Change Request Pile E95,E97,E99 done by
No. 009 for Dharavi M10 instead
Station Not Submitted to GC.
9 of M20. Internal Closed by DDC
and CJV
Typical
Engineering Change Request (ECR)splicing
No. 010 change from 2Station
for Dharavi pices of Not Submitted to GC.
10 750mm to 3 pices of 400mm. Internal Closed by DDC
and CJV
Heating
Engineering Change Request (ECR)ofNo.
Reingorcement at top
011 for Dharavi of capping
Station
11 beam during 90 Degree bending.
Secant
Engineering Change Request (ECR)pile
No.main
012reinforcement of 32mm dia
for Dharavi Station Not Submitted to GC.
12 replaced by 25mm Dia due to delay in Internal Closed by DDC
procurement. At Grid 8-11 building side. and CJV
Ancillary
Engineering Change Request (ECR) building
No. 013 with chamfering
for Dharavi at south
Station Not Submitted to GC.
13 west corner due to site constrains. Internal Closed by DDC
and CJV
Engineering Change Request (ECR)
South No.
Side 014 for Dharavi Station
pile Not Submitted to GC.
14 S612,S616,S632,S640,S242,S240 have Internal Closed by DDC
been boared at shotter depths. and CJV
Engineering Change Request (ECR) location
Revising No. 015 for
for KP
Dharavi
90 asStation
drilling bit Not Submitted to GC.
15 broke at 10M depth. Internal Closed by DDC
and CJV
King(ECR)
Engineering Change Request PostNo.
pile016
no. for Dharavi Station
16 33.35,29,30,31,32,25,26,12a,11a,8a,8,131,1
32 inflinging with RCC drain below.
South
Engineering Change Request Side
(ECR) pile
No. 017no.for
S241 and Station
Dharavi S243 have Not Submitted to GC.
17 been boared at shorter depths. Internal Closed by DDC
and CJV
1.Using
Engineering Change Request (ECR)NPV
No. section
018 for of 500 x Station
Dharavi 200 of
92.69Kg/M instead of UB 533 x 210 of
18 92Kg/M.
2.Making brick masonary
instead of RCC wall.
In grid
Engineering Change Request 17No.
(ECR) to 18
019building side Electrical
for Dharavi Station room
C 26 has been removed and also 1200 mm Not Submitted to GC.
19 dia SWD pile inflinging current layout of pile. Internal Closed by DDC
and CJV
Revising
Engineering Change Request (ECR) location
No. 020 for
for KP 41 and
Dharavi 42 as drilling
Station Not Submitted to GC.
20 hammer broke. Internal Closed by DDC
and CJV
Revising
Engineering Change Request (ECR) splicing
No. 021 details of walers.
for Dharavi Station Not Submitted to GC.
21 Internal Closed by DDC
and CJV
Revising
Engineering Change Request (ECR) the
No.bolting
022 fordetails
DharaviforStation
sitting of Deck Not Submitted to GC.
22 pannel on SB2. Internal Closed by DDC
and CJV
Removing
Engineering Change Request and023
(ECR) No. replacing the Load
for Dharavi cell by
Station Not Submitted to GC.
23 splicing details at Ancillary. Internal Closed by DDC
and CJV
Revising
Engineering Change Request (ECR) the
No.angle of Dharavi
024 for anchorsStation
at Nala side Not Submitted to GC.
24 due to inflingement of the Gabion. Internal Closed by DDC
and CJV
Revising
Engineering Change Request (ECR) the
No.Levels
025 forofDharavi
anchorsStation
at Building Not Submitted to GC.
25 side due to inflingement ot the decking king Internal Closed by DDC
post. and CJV
Revising
Engineering Change Request (ECR) the
No.details
026 forfor welding
Dharavi of diagonal
Station Not Submitted to GC.
26 strut at Ancillary. Internal Closed by DDC
and CJV
Crash
Engineering Change Request Barriar
(ECR) Revided
No. 027 details Station
for Dharavi per site Not Submitted to GC.
27 requirement Main taffic Decking. Internal Closed by DDC
and CJV
Access
Engineering Change Request (ECR)forNo.
nehru
028 society.
for Dharavi Station Not Submitted to GC.
28 Internal Closed by DDC
and CJV
Engineering Change Request (ECR)Revising
Further No. 029the
for anchors
Dharavi at
Station
Nala side, Not Submitted to GC.
29 Staggering the anchors at 1st level & 2nd Internal Closed by DDC
level. and CJV
Revising
Engineering Change Request (ECR) the
No.details
030 forfor Anchors
Dharavi and walers
Station Not Submitted to GC.
30 at North head wall, lowering 1st layer by Internal Closed by DDC
100mm . and CJV
Providing
Engineering Change Request diagonal
(ECR) No. strut
031 for at north
Dharavi head wall
Station Not Submitted to GC.
31 and removing anchor at pile No. E 003. Internal Closed by DDC
and CJV
At Grid
Engineering Change Request 17-20
(ECR) below
No. 032 forRCC Deck
Dharavi Nala side it
Station
32 is not possible to provide Anchoring.
Lowering
Engineering Change Request 2nd035
(ECR) No. andfor
3rdDharavi
layer anchors
Stationat Nalla Not Submitted to GC.
35 side upto 200mm. Internal Closed by DDC
and CJV
At Building
Engineering Change Request side
(ECR) No. 036grid
for17 to 20 installation
Dharavi Station of
36 waler is not possible due to site constrains
At Building
Engineering Change Request side
(ECR) No. 037grid
for17 to 20 installation
Dharavi Station of
37 waler is not possible due to Bracket leg of
SWD 1200mm dia.
Using
Engineering Change Request UBNo.
(ECR) 533038
x 210
forof 92Kg/M
Dharavi section
Station
38 instead of ISMB 500.
At Building
Engineering Change Request side
(ECR) No. 039grid
for17 to 21 pile
Dharavi depth
Station Not Submitted to GC.
39 reduced from 14 to 8m. Internal Closed by DDC
and CJV
Not(ECR)
Engineering Change Request providing anchor
No. 040 at pile No.
for Dharavi E 003 due to
Station
40 operation problem of rig.
Revising
Engineering Change Request (ECR) the
No.details
041 forfor Anchors
Dharavi and walers
Station Not Submitted to GC.
41 at North head wall, lowering 1st layer by Internal Closed by DDC
100mm . and CJV
Revising
Engineering Change Request (ECR) the
No.angle and
042 for levels Station
Dharavi 1st,2nd,3rd Not Submitted to GC.
42 Level of anchors and walers at Nala side. Internal Closed by DDC
and CJV
Engineering Change Request (ECR) the
Revising No.angle
043 for
andDharavi
levels Station
1st,2nd Level Engineering Change Request
43 of anchors and walers at Building side. (ECR) No. 004 for Dharavi
Station
Engineering Change Request (ECR) the
Revising No.angle
044 for
andDharavi
levels Station
1st,2nd Level
44 of anchors and walers at Building side due to
SWD pipe.
Strut
Engineering Change Request of second
(ECR) layer
No. 045 to be replaced
for Dharavi Stationby UGC05-GCC-DEC-000498 R00 25-09-2019
45 ground anchor/ Rock Anchor at Ancillary. OPEN
Capping
Engineering Change Request (ECR) beam reinforcement
No. 046 shoter at grid
for Dharavi Station
46 17 to 19.
Providing
Engineering Change Request Ledge
(ECR) No. 047eliminating
for Dharaviniche as shown UGC05-GCC-DEC-000460
Station R00 10-08-2019
47 in Drawing No. UGC05-CAC-SDH-5801-005- OPEN
A0
Permanent Structure
In CRD
Engineering Change Request (ECR)Drawing
No. 048offor
concourse slab two
Dharavi Station UGC05-GCC-DEC-000469 R00 22-08-2019 √ 30-08-2019
layers of vertical reinforcement is shown in
48 outer side of wall. Whereas CRD Drawing of CLOSED
extended concourse slab one layers of
vertical reinforcement is shown.
In grid
Engineering Change Request 22-24
(ECR) No. East side
049 for wall reinforcement
Dharavi Station UGC05-GCC-DEC-000496 R00 24-09-2019 √ 24-09-2019
49 patten is revised without change in area of CLOSED
reinforcement.
In grid
Engineering Change Request 18-24
(ECR) No. West side
050 for wall reinforcement
Dharavi Station UGC05-GCC-DEC-000497 R00 24-09-2019 √ 05-11-2019
50 patten is revised without change in area of CLOSED
reinforcement.
As per
Engineering Change Request CRD
(ECR) No.drawings base slab
051 for Dharavi dowels for
Station UGC05-GCC-DEC-000534 R01 03-03-2020 √ 04-03-2020
under platform walls from grid 2 to 22 are
given as 16 @135 mm c/c. kindly request
you to check that can bar spacing be revised
51 to 200mm. CLOSED
1) As
Engineering Change Request per No.
(ECR) CRD052
drawing of dharavi
for Dharavi Station
Station UGC05-GCC-DEC-000609 R00 24-02-2020 √ 05-03-2020
Walls, from grid 2 -4 on soil face of west side
52 & east walls,32mm dia starter bar is lapped CLOSED
with 20mm main bar & again it is lapped with
32mm bar at upper level and extra 32mm bar
is
In provided
grid 22-24inColumn
20 mm barC 15area.
and We wish
C 16, is to UGC05-GCC-DEC-000509 R00 10-10-2019 √ 10-10-2019
provide
provided32mm bar instead
with column of and
sketch 20mm main bar
design
54 and provide extra 20mm bar instead of CLOSED
document.
32mm
Engineering Change Request diaNo.
(ECR) bar.054 for Dharavi Station
The(ECR)
Engineering Change Request revised detailfor
No.055 of Dharavi
column and wall W003 UGC05-GCC-DEC-000551
station R00 03-12-2019 √ 03-01-2020
2) As per
W004 is provided withCRD drawing
revised of
drawing
55 dharavi Station Walls, from grid 2and
UGC05-STR-SDH-5551-004-A1 -4 on CLOSED
Excavation face of west side & east
UGC05-STR-SDH-5551-005-A2
walls,20mm dia starter bar is lapped with
32mm main bar & again it is lapped with
20mm bar at upper level and extra 16mm bar
is provided in 32 mm bar area. We wish to
provide 20mm bar instead of 32mm main bar
and provide extra 32mm bar instead of
16mm dia bar.
Engineering Change Request
The(ECR) No. 056
horizontal for Dharavi are
reinforcement revised as UGC05-GCC-DEC-000518
Station R00 14-10-2019 √ 14-10-2019
56 per design requirement, and revised EAT CLOSED
check calculations attached.
Engineering Change Request
The(ECR) No.057
wall size for Dharavi
of 800mm shall station
be followed UGC05-GCC-DEC-000549 R01 28-12-2019 √ 30-01-2020
W06,W07 and W08 as per reinforcement
57 drawing. At Ancillary CLOSED
Foundation
Engineering Change Request size for
(ECR) No.059 forC13 mismatch
Dharavi stationin GA UGC05-GCC-DEC-000562 R00 14-12-2019 √ 24-12-2019
59 plan & Section at Dharavi Station CLOSED
Concourse
Engineering Change Request Level for
(ECR) No.060 Slab top & bottom
Dharavi station UGC05-GCC-DEC-000561 R00 14-12-2019 √ 24-12-2019
60 reinforcement missing at Dharavi Station CLOSED
Bar(ECR)
Engineering Change Request diameter of Horizontal
No.064 reinforcement
for Dharavi station of UGC05-GCC-DEC-000568 R00 31-12-2019 √ 16-01-2020
64 wall at both face from concourse to roof at CLOSED
Dharavi Station
As per
Engineering Change Request latest
(ECR) plumbing
No.065 arrangement
for Dharavi station of UGC05-GCC-DEC-000604 R00 17-02-2020 √ 05-03-2020
concourse level slab, Kindly provide revised
65 concourse level drawing for grid 22-24/J-L CLOSED
For (ECR)
Engineering Change Request head No.068
wall at grid 2, Kindlystation
for Dharavi provide ring UGC05-GCC-DEC-000622 R00 16-03-2020
68 beam general arrangement & reinforcement under Review DTL Input Required
detailsdetails
As per
Engineering Change Request CRD
(ECR) Drawings
No.069 of wall station
for Dharavi and column UGC05-GCC-DEC-000648- R01 21-07-2020 √ 31-07-2020
reinforcement details, Lift wall Reinforcement R01
69 were not given, Kindly provide lift wall and CLOSED
genaral allignment Details
Engineering Change Request (ECR)
As per CRDNo.070 for Dharavi
Drawings of wall station
and column UGC05-GCC-DEC-000648- R01 27-08-2020
reinforcement details, Knockout panel R01
Reinforcement were not given, Kindly
70 provide Knockout panel reinforcement details under Review DTL Input Required
in east side external wall above concourse at
grid 12-14.
71
72
For (ECR)
Engineering Change Request Dharavi Station
No.073 forroof Slabstation
Dharavi at grid 17 to UGC05-GCC-DEC-000640- R02 18-08-2020
19, Temporary cutout is required for tower R02
73 crane kindly suggest if any extra under Review
reinforcement is required near tower crane
cut out.
For (ECR)
Engineering Change Request Dharavi Station
No.074 forroof Slabstation
Dharavi at grid 15 to UGC05-GCC-DEC-000700- R00 30-09-2020
17.As per approved CRD drawing of roof R00
slab, for column C10 top reinforcement of
74 column capital bar mark no. 432(T3), √ CLOSED
433(T5), & for column C11 top reinforcement
of column capital bar mark no. 436(T3), bar
dia is 25mmas per approved CRD drawing
(DWG NO, UGC 05STR-SDH-5402-004-A2,
UGC 05-STR-SDH-5402-007-A5).
Rebar Extension at Roof Level in Grid 5 to 6 at Column No. C06 at BKC Station CJV has eposed reinforcement upto desired length
UGC05-GCC- and lapped new reinforcement to existing exposed
11 Engineering Change Request (ECR) No. 037 DEC-000605-R00
2/25/2020 √ reinforcement. Proposal is not valid at Roof Level in Closed Submitted in PMIS
Grid 5 to 6 at Column No. C06 at BKC Station
Rebar Extension at Base Slab level Construction Joint at Grid 34 for BKC Station Engineer has objection for Engineering Change
UGC05-GCC- Request (ECR) no. 038 Rebar Extension at Base
12 Engineering Change Request (ECR) No. 038 DEC-000608-R00
2/25/2020 √ Slab level Construction Joint at Grid 34 for BKC Closed Submitted in PMIS
Station
placing of T3 Layer Reinforcement at T1 Layer at roof slab level between grid 9 to 10 at BKC calculation for supporting this scheme is not
Station. UGC05-GCC- submitted.
13 Engineering Change Request (ECR) No. 039 DEC-000608-R00
2/26/2020 √ Closed Submitted in PMIS
Engineering Change Request (ECR) no. 041 for replacement of for providing temporary opening As the opening is small it have less impact on design.
in under platform wall to create space for electrode riser at BKC station. UGC05-GCC- However CJV should mention the nos and diameter
15 Engineering Change Request (ECR) No. 041 DEC-000631-R00
6/8/2020 √ of extra reinforcement provided at top of opening. Closed Submitted in PMIS
Engineering Change Request (ECR No. 42) for Beam above knock out panel between GL 24-26 Calculation to be provided.
at East Side Wall of Station at BKC Station UGC05-GCC-
16 Engineering Change Request (ECR) No. 042 DEC-000633-R00
6/26/2020 √ Closed Submitted in PMIS
Engineering Change Request (ECR No. 42) for Beam above knock out panel between GL 24-26 Calculation provided.
at East Side Wall of Station at BKC Station UGC05-GCC-
Engineering Change Request (ECR) No. 042 (R01)
DEC-000633-R02
9/21/2020 √ Closed Submitted in PMIS
Engineering Change Request (ECR) no. 043 for Change in dia of B3 level bar from 40mm to Required Area of steel of calculation is provided.
36mm in base slab at grid 32-34 at BKC Station UGC05-GCC- Found Ok
17 Engineering Change Request (ECR) No. 043 DEC-000644-R00
7/13/2020 √ Closed 7/18/2020 Submitted in PMIS
Engineering Change Request (ECR) no. 044 for use of 32 dia.bar instead of 25 + 20 dia bars as 7/28/2020 Engineer's notice of No objection is given for using 32
top reinformcement in temporary sump of south shaft base slab location at Grid E near south UGC05-GCC- diameter reinforcement bar with coupler instead of 25
17 Engineering Change Request (ECR)
head No.at044
wall BKC Station. DEC-000649-R01 √ diameter( T1 and T2 bar) + 20 diameter (T2 and T4 Closed 7/29/2020 Submitted in PMIS
bar) at top in temporary sump of south shaft location
at grid E near south head wall at BKC station.
Chagne Request (ECR) no. 045 for Column Drop Elimination for Column no. C37 & C38 at 8/19/2020 Engineer's notice of No objection is given for using 32
concourse Slab Level at BKC Station UGC05-GCC- diameter reinforcement bar with coupler instead of 25
17 Engineering Change Request (ECR) No. 045 DEC-000676-R00 diameter( T1 and T2 bar) + 20 diameter (T2 and T4 Open Submitted in PMIS
bar) at top in temporary sump of south shaft location
at grid E near south head wall at BKC station.
Engineering Change Request (ECR) no. 046 for finalisation of Dimensions & Location of Cutout 8/25/2020
PF12 Near Column C5 at Concourse Slab Level at BKC Station. UGC05-GCC-
17 Engineering Change Request (ECR) No. 046 DEC-000673-R00 √ Closed 9/21/2020 Submitted in PMIS
Engineering Chang
ECR NO. ECR Submission No. SUBJECT
TEMPORARY STRUC
1 ECR-01 ANCHORS OF SHAFT-VDN
2 ECR-02 CAPPING BEAM OF SHAFT
3 ECR-03 PACKING CONCRETE BEHIND WALER
4 ECR-04 CLARIFICATION ON ANCHOR STRESSING
GANTRY CRANE FOUNDATION REINFORCEMENT
5
ECR-05 DWG.
ROCKBOLT OF SHAFT FOR EXCAVATION LAYER 2-3-
6
ECR-06 4
7 ECR-07 ROCKBOLT CENTRALIZATION
8 ROCKBOLT TORQUING
ECR-08
9 ECR-09 ROCK BOLTS OF SHAFT
10 ECR-10 Shot Crete in G-1& 2
Engineering Change Request (ECR) No.011 for
Instrumentation & Monitoring due to monitoring for
11
1200mm dia pipeline is done manually with increased
ECR-11 frequency at Vidyanagri Station
12 ECR-12 ECR CANCELLED
13 ECR-13 Shifting of Piles W-371 to W-403.
14 ECR-14 Reinforcement changes in Secant pile.
15 ECR-15 ECR CANCELLED
16 ECR-16 Kingpost for Strutting and Water line support system.
17 ECR-17 ECR CANCELLED
18 ECR-18 Capping beam at station area
23 Soldier Pile
ECR-23
PERMANENT STRUC
1.Plan at Column Foundation shows 16mm dia bar in B5
layer, where as section shows 32dia bar 2.bar no 5 & 27
shows a haunch of 300mm in CRD drawing where as in
working drawing it is missing 3.Bar no la have been
36 curtailed at External face of sump Whereas in CRDGFC It
shown tilt the end 4.In Southwest corner. as per CRO
32mm bar is shown in Bl layer. Whereas in working
drawing it is 25mm dia 5.Coupler in Column are flushed in
Base stab, whereas in CRD it is shown 2C0rnm above the
ECR-35 top of slab
47
ECR regarding length of Soil Face1 bar in permanent wall being
ecr 51 reduced in order to achieve staggerred lap amog the bars.
48
ECR regarding change in Dia of top longitudnal bar from 32mm
ecr 52 to 25mm in extended concouse slab
conourse slab casted without considering knock out panel in
49 the wall and reinforcement not maintained as per drawing
ecr 53 requirement.
52
ecr 59 Plaster work on block work.
53
ecr 60 Block work in place of RCC wall.
STRUCTURE
8/31/2017
9/1/2017
9/2/2017
9/4/2017
9/4/2017
6/11/2017
9/27/2017
9/25/2017
6/30/2018
REJECTED
UGC05-GCC-CON- R0
000376-R00
18/12/2018
CANCELLED
1/17/2018
2/8/2018
CANCELLED
2/28/2018
CANCELLED
2/27/2018
3/22/2018
26-Mar-18
3/22/2018
3/28/2018
6/30/2018
4/12/2018
4/28/2018
5/18/2018
5/24/2018
8/22/2018
9/25/2018
9/25/2018
9/25/2018
10/5/2018
11/24/2018
12/10/2018
UGC05-GCC-DEC- R0 P
000516-R00
14/10/2019
UGC05-GCC-DEC- R0 16/11/2019
000539-R00
STRUCTURE
1/2/2019
2/25/2019
3/2/2019
UGC05-GCC-DEC- R0
000373-R00
3/13/2019
UGC05-GCC-DEC- R0
000416-R00
5/8/2019
7/6/2019
UGC05-GCC-DEC- R1
000457-R01
8/5/2019
8/7/2019
8/14/2019
UGC05-GCC-DEC- R0
000470-R00 8/20/2019
UGC05-GCC-DEC-
000517-R00
R0 14/10/2019 P
UGC05-GCC-DEC-000539-R00 R0 30/10/2019 P
UGC05-GCC-DEC-
000538-R00
R0 16/11/2019 P
UGC05-GCC-DOC-1203-
R00
R0 3/12/2019 P
UGC05-GCC-DEC-000585-
R00
R0 25/01/2020 P
UGC05-GCC-DEC-000564- 14/01/2020
R00 R0 P
UGC05-GCC-DEC-000570- R0 8/1/2020
R00 P
UGC05-GCC-DOC-1263- R0 6/2/2020
R00 P
UGC05-GCC-DOC-1275- R0 19/2/2020
R00 P
UGC05-GCC-DOC-1276- 19/2/2020
R00 R0
UGC05-GCC-DOC-1300- R0 3/3/2020
R00 P
UGC05-GCC-DEC-
000686-R00 R0 5/9/2020 P
AGRI STATION
ECR REPLY STATUS Remarks
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Closed By GC without
CLOSED
DSR Reply
OPEN
REJECTED
OPEN
CANCELLED
OPEN
OPEN
CANCELLED
OPEN
CANCELLED
OPEN
CLOSED
Closed By GC without
DSR Reply
Closed By GC without
CLOSED
DSR Reply
CLOSED
Closed By GC without
DSR Reply
Closed By GC without
CLOSED
DSR Reply
Closed By GC without
CLOSED
DSR Reply
CLOSED
Closed By GC without
DSR Reply
Closed By GC without
CLOSED
DSR Reply
Closed By GC without
CLOSED
DSR Reply
UNAVAILABLE Not Submitted to GC.
UNAVAILABLE Not Submitted to GC.
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
The ECR reply by DDC doesn’t elobrate the
modification required or adopted by CJV in site.
No calculation or backups provided or attached. CLOSED Rejected by GC, 'A'
ECR doesn’t specify actual modifications done at Status
site.
CLOSED
Closed By GC without
DSR Reply
CLOSED
Closed By GC without
DSR Reply
Closed By GC without
CLOSED
DSR Reply
CLOSED
Closed By GC without
DSR Reply
Closed By GC without
CLOSED
DSR Reply
Closed By GC without
CLOSED
DSR Reply
Closed By GC without
CLOSED
DSR Reply
CLOSED
Closed By GC without
DSR Reply
CLOSED
Closed By GC without
DSR Reply
CLOSED
Closed By GC without
DSR Reply
The struts are directly shown emmbeding into Rejected by mail (GC
wall concrete, Which GC designer has rejected CLOSED desing team), DSR
the proposal. No calculation or backups comments not given.
provided.only drawing attached which give no
clarrification.
CLOSED
Rejected by GC, 'A'
Status
TEMPORARY STRUC
1
CJV has cut the top flanges of bracket at waler beam 0.00
level in Gr no 11 - 12 east side because the bolts of
3 ECR-03
bracket plate were coming on the same line of the flange
level
PERMANENT STRUC
1 ECR- 09 Niches in the plant room base slab
2 ECR - 11 Base slab B2 reinforcement lapping b/w Gr 17.6 to 19
STRUCTURE
UGC05-STR-SSC-0053-005-A4 1/14/2019
UGC05-STR-SSC-0052-003-A4 5/28/2019
UGC05-CAC-SSC-0008-002-A6 5/28/2019
UGC05-CAC-SSC-0014-001 7/29/2019
UGC05-CAC-SSC-0015-002 8/5/2019
UGC05-CAC-SSC-0010-003 8/5/2019
UGC05-STR-SSC-0052-007-A4 8/5/2019
UGC05-CAC-SC-0075-005
9/12/2019
UGC05-CAC-SC-0075-006
STRUCTURE
UGC05-STR-SSC-0086-001-A3
8/7/2019 √
UGC05-STR-SSC-0086-002-A3
UGC05-STR-SSC-0112-003-A3 12/10/2019 √
UGC05-GCC-DEC-000577-R00 1/21/2020
UGC05-GCC-DEC-000578-R00 1/21/2020
UGC05-GCC-DEC-000580-R00 1/24/2020 √
UGC05-GCC-DEC-000580-R01 3/16/2020 √
UGC05-GCC-DEC-000594-R00 2/5/2020 √
UGC05-GCC-DEC-000595-R00 2/6/2020 √
UGC05-GCC-DEC-000596-R00
2/6/2020 √
UGC05-GCC-DEC-000623-R00 3/18/2020 √
UGC05-GCC-DEC-000635-R00 7/2/2020 √
UGC05-GCC-DEC-000639-R00 7/6/2020 √
UGC05-GCC-DEC-000654-R00 27/07/2020 √
UGC05-GCC-DEC-000654-R01 8/10/2020 √
UGC05-GCC-DEC-000698-R00 9/25/2020 √
UGC05-GCC-DEC-000701-R00 10/2/2020
uz station
ECR REPLY STATUS Remarks
CLOSED
CLOSED BY GC WITH
DSR REPLY
CLOSED BY GC WITH
CLOSED
DSR REPLY
CLOSED BY GC WITH
CLOSED
DSR REPLY
REJECTED
OBJECTION BY GC
REJECTED
CLOSED BY GC WITH
CLOSED
DSR REPLY
CLOSED BY GC WITH
CLOSED
DSR REPLY
CLOSED
CLOSED BY GC WITH
DSR REPLY
CLOSED
CLOSED BY GC WITH
DSR REPLY
CLOSED
CLOSED BY GC WITH
DSR REPLY
CLOSED
CLOSED BY GC WITH
DSR REPLY
REJECTED OBJECTION BY GC
CLOSED BY GC WITH
CLOSED
DSR REPLY
CLOSED BY GC WITH
CLOSED
DSR REPLY
Engineering Change Request (ECR)-I&M
UGC05-GCC-DEC-000482-R01 30-Oct-19 A
UGC05-GCC-DEC-000482-R02 7-Dec-19 C
UGC05-GCC-DEC-000483-R00 16-Sep-19 A
UGC05-GCC-DEC-000483-R01 30-Oct-19 A
UGC05-GCC-DEC-000483-R02 7-Dec-19 C
UGC05-GCC-DEC-000504-R00 3-Oct-19 A
UGC05-GCC-DEC-000510-R00 9-Oct-19 A
UGC05-GCC-DEC-000510-R01 7-Dec-19 C
UGC05-GCC-DEC-000511-R00 9-Oct-19 A
UGC05-GCC-DEC-000511-R01 7-Dec-19 C
UGC05-GCC-DEC-000525-R00 8-Nov-19 A
UGC05-GCC-DEC-000525-R01 7-Dec-19 A
UGC05-GCC-DEC-000525-R02 17-Dec-19 C
UGC05-GCC-DEC-000540-R00 16-Nov-19
UGC05-GCC-DEC-000569-R00 2-Jan-20 C
UGC05-GCC-DEC-000571-R00 10-Jan-20
DSR REPLY
18-Nov-19
18-Nov-19
18-Nov-19
10-Dec-19
10-Dec-19
10-Dec-19
10-Dec-19
10-Dec-19
10-Dec-19
10-Dec-19
11-Dec-19
11-Dec-19
11-Dec-19
11-Dec-19
17-Dec-19
17-Dec-19
17-Dec-19
ECR'S-NATM
S.No. Document Document Reference Submission
Engineering Change Request (ECR) No.NATM-CP-03
1 UGC05-GCC-CON-000665-R00 7-Sep-19
for Cros Passages
Engineering Change Request (ECR) No.NATM-CP-01
2 UGC05-GCC-CON-000677-R00 14-Sep-19
for Cross Passages
Engineering Change Request (ECR) no. NATM-CP 04
for Construction Cross Passage from TBM Tunnel End UGC05-GCC-DEC-000543-R00 20-Nov-19
3 at BKC Station
DSR reply on ECR no. NATM-CP 04 for Construction CP
UGC05-GCC-DEC-000543-R01 9-Jan-20
from TBM Tunnel End at BKC Station
Engineering Change Request (ECR) no. NATM-CP 05 of
4 Opening Provided in Tunnel Segments for Cross UGC05-GCC-DEC-000558-R00 10-Dec-19
Passage Construction
Engineering Change Request (ECR) no. 015 for
5 Reduction in Length of Swellex bolts at Santacruz UGC05-GCC-DEC-000594-R00 6-Feb-20
Station
6 Engineering Change Request (ECR) no. 016 for Spilling UGC05-GCC-DEC-000595-R00 6-Feb-20
Umbrella at Access Gallery at Santacruz Station
19-Sep-19 C CLOSED
27-Dec-19 A CLOSED
22-Jan-20 A CLOSED
30-Dec-19 C CLOSED
U.R BY GC
U.R BY GC
U.R BY GC
4-Mar-20 CLOSED
U.R BY GC